roofy

1 Hanson Place

Brooklyn, NY 11217BBL 3-02111-7501Map

Owner of record: Unavailable Owner

1 Hanson Place is a condominium built in 1929 in Brooklyn, 11217. It has 179 residential units across 41 floors. The owner of record is Unavailable Owner. HPD has recorded 11 housing violations here, most recently on January 11, 2026.

HPD violations
11
DOB violations
117
ECB violations
49
HPD complaints
17

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jan 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 11

  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall

    Jan 11, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Jan 11, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall

    Jan 11, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Jan 11, 2026

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Jan 11, 2026

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall

    Jan 11, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Jan 11, 2026

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 25g, 25th story, 3rd apartment from south at west

    Feb 1, 2024 · Apt 25G

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from north located at apt 25g, 25th story, 3rd apartment from south at west

    Feb 1, 2024 · Apt 25G

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 25g, 25th story, 3rd apartment from south at west

    Feb 1, 2024 · Apt 25G

    Closed — Violation closed
Show 1 more ↓
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 12j, 12th story, 2nd apartment from south at west

    Aug 9, 2018 · Apt 12J

    Closed — Violation closed

DOB building violations · 117

  • Construction other optional

    Special inspector, alberto roman, pe#95364 surrendered all filing privileges, therefore pursuant to ac 28-105.10.2. borough commissioner has ordered swo under application #b00530096.

    Aug 28, 2022

    Dob violation - dismissed
  • Construction other optional

    Special inspector, alberto roman, pe#95364 surrendered all filing privileges, therefore pursuant to ac 28-105.10.2. borough commissioner has ordered swo under application #b00530096.

    Aug 28, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2020

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to priv res elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
Show 40 more ↓
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 30, 2019

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 30, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 21, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 1, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 1, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 1, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 1, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 1, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 1, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 1, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    Cease use

    Aug 1, 2018

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 29, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    Cease use

    Jul 6, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2017

    Dob violation - resolved

ECB violations · 49

  • Class - 2

    Failure to maintain exterior building facade and appurtenances.note:observed at exp #2 west elevation observed spalling stone at exp #3 north elevation crack mortar joint & displaced stone at corner through all

    Jul 8, 2022 · Penalty $625

    Resolve
  • Class - 2

    At the time of inspection i observed c hook suspended scaffold on 23rd fl tied back with parapet clamps. wire rope tied in steel( welded ) in clamps which is contrary to manufacture specification as per provisi

    May 6, 2022

    Resolve
  • Class - 2

    At the time of inspection observed sidewalk shed at exp#2 on high bridge has horizontal bracing members was not connected and lap spliced with another pipe.that cause unsafe condition for stability of the she

    May 6, 2022

    Resolve
  • Class - 2

    Interior demolition including drywall partitions, light fixtures, electrical wiring and hardware at fifth floor office spaces. no dob permits on file., obtain all permits

    Jan 21, 2020

    Resolve
  • Class - 1

    97x10 elevator out of service, upon inspection, the device is found to be out of service; rmdy: restore to service immediately and notify nycdob that the device has been returned to service by calling 212-393

    Aug 21, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    15x17:door restriction device is not working,make repairs and call dobat 212-393-2435 and email [email protected] to schedule a re-inspection.

    Aug 28, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    05x10,59u15,80b07. (05x10)door restricter not working,(59u15) brake maintenance tag,(80b07)provide a run by sign in the pit.

    Jun 2, 2016 · Penalty $500

    Resolve
  • Class - 2

    Cc3310.6 failure to have designated ssm as indicated on pw2 present onsite at minimum of once more than two woods examination of site safetylog book for dates 11.13.14 to 12.02.14 indicated that ssm # 1040 mr.

    Dec 4, 2014

    Resolve
  • Class - 2

    Work does not conform to approve const.docs.@ time of inspec.observed active facade work in progress.sidewalk shed erected in adjoining parking lot area for overhead protection is not whown on approved site saf

    Jun 10, 2014

    Resolve
  • Class - 1

    Full *swo* fail to safeguard all persons and prop affected by const ops.note:info fr foreman-during active facade work,a brick fell fr unknown location of bldg.brick fell in exp#2 on ashland pl,broke into piece

    Nov 14, 2013 · Penalty $2,400

    Resolve
Show 39 more ↓
  • Class - 2

    Failed to notify dept prior to use/inst of c-hooks in connection with suspended scaffolds.noted: notification #3076357 expired 06/08/13.present notification #3078649 - belongs to another building - 1 hanover pl

    Jul 31, 2013

    Resolve
  • Class - 1

    Bc3310.6 failure to provide designated site safety mgr at inspection,observed site safety mgr log book w/robert rainone#1775 on site since jan of 2013 or pw2-anton rusin 30390 as designated site safety.rmdy:pr

    May 22, 2013 · Penalty $1,600

    Resolve
  • Class - 1

    No roof protection.at time of inspection observed c hook installed at exposure 4 over single story bldg (church) without adequate roof protection covering 20'-0"of addjacent property as required "phase ii of fa

    May 16, 2013

    Resolve
  • Class - 2

    Bc3310.6 failure to have designated site safty mgr as indicated on pw2present on site at a minimum of once every two weeks.examination of site safety manager log for dates 3/5/13 to present (5/16/13) indicate

    May 16, 2013

    Resolve
  • Class - 1

    Failure to safeguard all persons & property due to const. operation.noted:sidewalk shed present where as section of shed has debris fall consisting of metal decking, along with one "i" beam.rmdy:safeguard all p

    Oct 20, 2012 · Penalty $2,400

    Resolve
  • Class - 2

    Work does not conform to approved construction documents & amendments @ time of inspection,observed sidewalk bridge not according to bsu drawing-side walk bridge has 2 openings,1 on hanson pl & 1 on ashland 23x

    Jul 20, 2010

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations-@ time of inspection,facade operations in progress,all terraces & balcony set backs not protected or locked.residence have access

    Jul 20, 2010 · Penalty $2,400

    Resolve
  • Class - 2

    Work contrast to approved plans & amendments.approved site safety scaffolds located on upper floors,site safety plan does not show c hooks @upper flr locations.scaffolds located on 24flr north & south sides &

    Jul 20, 2010

    Resolve
  • Class - 1

    3310.3 failure to provide site safety & con and program at time of insp observed facade work in progress for the above site 37 story bldg no site safety plan on file rem: stop all work provide site safety plan

    Jul 12, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    3310.3 failure to provide site safety plan and program at time of inspobserved facade repair in progress to 37th story bldg site safety company lrsg allowed work to commence w/o a site safety plan & program rem

    Jul 12, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Work w/o a permit noted electrical connections are made to supply multiple 220 power scaffold motors no permit or plans issued appx 4breakers are piggy backed in use for other power already rem; obtain a permit

    Jul 9, 2010

    Resolve
  • Class - 1

    Work doesn't conform to approved construction documents or approved amendments. noted: outrigger beams are not perpendicular w/the facade w/o opposable tiebacks, tiebacks are on angles and secured to front of

    Jul 9, 2010

    Resolve
  • Class - 1

    Supported scaffold doesn't meet code spec's. noted - scaffold erected @ exp's 1,3,4 @ approx 300' high is missing guard rails, toe boards, planking and tie ins. ingress and egress. remedy: conform scaffold to

    Jul 9, 2010

    Resolve
  • Class - 1

    Inadequate safety measures: operation of hoisting equipment in an unsafe manner. noted: two suspended scaffolds in use are suspended from siblings: #1 @ exp 2 approx 400'high hanging from drop line 5/16 wire

    Jul 9, 2010

    Resolve
  • Class - 1

    Failure to perform a safe/proper inspection of suspended scaffold. noted: multiple scaffolds in use @ approx 11:30 am. upon full inspection many hazardous, blatant violating conditions are found: inadequate

    Jul 9, 2010

    Resolve
  • Class - 2

    Sec. bc3313.1 failure to comply w/nyc fire code. no permit for accetylene storage on bldg for torch operation observed on 26fl 2 accetylene dissolve gas tanks for torch operation fire dept.permit has not been

    Dec 10, 2009 · Penalty $800

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations.recent smoking refuse observed in construction site in violation of nyc fire code 1404.1 & construction code 3303.7.3.approx 5 cig

    Dec 10, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    "stop all work" failure to safeguard all persons & property affected by construction operations. as reported by ss manager,a piece of sidewalk shed parapet collapsed & fell on to a pedestrian.the person is inju

    Dec 10, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Sidewalk shed does not meet code specification.noted:parapet blew off sidewalk shed hitting a pedestrian in the head, inadequate bracing forparapet. remedy:conform shed to code.

    Dec 10, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Sec 28-105.12.2 work does not conform to approved construction documents and or approved amendments plan at the time of insp approx 30 work men on site working on facade or bldg doing brick lawning pointing cle

    Jul 27, 2009

    Resolve
  • Class - 2

    Failure to post/provide signs at job site pursuant to subsection. noted: no contractor signs posted at time of inspection. remedy: provide contractors sign.

    Mar 26, 2009

    Resolve
  • Class - 1

    Sec. 3314.4.4 storage of material & debris material & debris shall notbe stored on supported scaffold. noted: debris observed on supported scaffold at all exposures & all levels throughout. remedy: remove debri

    Mar 26, 2009 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to provide approved plans at job site at time of inspection. noted: no supported scaffold plans on site for review at time of inspection. no sidewalk shed plans on site for review at time of inspection.

    Mar 26, 2009

    Resolve
  • Class - 1

    No record of daily inspection of scaffold performed by authorized person at site. noted: supported scaffold at exposures 1,2 & 4 at different elevations & set backs. sidewalk shed at exposures 1&2 have no recor

    Mar 26, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Sidewalk shed does not meet code specifications. noted: vertical column out of plum. mudsills rotted of missing throughout. parapet enclosure rotted of missing throughout shed not sealed to building in several

    Mar 26, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    03x10.05m07.72d06.42m07.10h11.12i10. 03x10 emergency phone in elevatornot working 05m07 car door "zone lock" door restrictor missing 42m07 provide ground wire from controller to transformer main line

    Oct 22, 2008 · Penalty $500

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations as noted at time of inspection on active const site suspended scaffold hanging from exposure 2 which is west elevation of job

    Aug 16, 2008 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to have safety manager present as required as noted at time opf inspection on active const site interior work in progress at 18,19 25th flrs no site manager on site remedy: stop all work provide site sa

    Aug 16, 2008 · Penalty $2,400

    Resolve
  • Class - 1

    Work w/o a permit as noted at time of inspection on active site interior work in progress construction chain link fence erected at rear of job site which is use as staging area w/o a permit as per dob record re

    Jul 24, 2008 · Penalty $800

    Resolve
  • Class - 2

    Work w/o permit expired permit as noted at time of inspection on active site plumbing work & interior work in progress plumbing permit expired on 071908 permit #301981773-02-pl there is no update permit availab

    Jul 24, 2008 · Penalty $400

    Resolve
  • Hazardous

    C.u.05l10,c.u.05m07,c.u.05n10,53k11,84l13. 05l-05m latch springs and/or covers. 05n-provide cams on all served floors 84l-rear gate cease use until items 05l,05m,and 05n are complied before restore to service,

    Mar 25, 2008 · Penalty $500

    Resolve
  • Hazardous

    C.u.05l10,c.u.05m07,c.u.05n10,53k11,c.u.68d11,c.u.05r11. 05l-05m-latchsprings and /or covers. 05-r-dead bolts without spring. 05n-provide c ams on all served floors cease use until items 05l,05m,05n,68d and 05

    Mar 25, 2008 · Penalty $500

    Resolve
  • Hazardous

    No site safety log as per reg. on insp. exterior restoration in progress throughout alter. oper. w/o site safety log as per ll61/87rmd: stopall wrk, provide site sft log per reg. call best squad 4 re-insp 2126

    Jan 8, 2008 · Penalty $1,000

    Resolve
  • Hazardous

    No designated site sfty mngr present as reqrd. on insp. no designated site sfty mngr on site for extr rest. oper as per ll 61/87. rmd:stop all work provide designated site sfty mngr call bs for reinspection

    Jan 8, 2008 · Penalty $2,000

    Resolve
  • Non-hazardous

    84##11 84-#. 16 floor hoistway door brake tags are wrong. braile says 14.

    Mar 17, 2006 · Penalty $350

    Resolve
  • Non-hazardous

    73x11. 73=restore to service so a full inspection can be made.

    Apr 25, 2002 · Penalty $350

    Resolve
  • Non-hazardous

    Failure to provide emergency power exit light on 29 floor.failure to provide emergency power to exit-directional signs on floor 29.remedy: provide emergency power according to b.e.c standards and local law 16/

    Jun 4, 1996 · Penalty $800

    Resolve
  • Non-hazardous

    Altered building occupied without a valid certificate of occupancy un-der #85-90. remedy:obtain a certificate of occupancy as required.

    Mar 10, 1993 · Penalty $350

    Resolve
  • Non-hazardous

    Altered building occupied without a valid certificate of occupancy required under alteration appl #085/90. remedy: obtain a certificate of occupancy as required or discontinue the unlawful use.

    Mar 28, 1991 · Penalty $285

    Resolve

Complaints

  • Water leak

    Slow leak

    Jan 31, 2024 · Apt 25G

    Close
  • Paint/plaster

    Ceiling

    Jan 31, 2024 · Apt 25G

    Close
  • Electric

    No lighting

    Oct 3, 2018 · Apt BLDG

    Close
  • Safety

    Fire escape

    Oct 3, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 8, 2018 · Apt 12H

    Close
  • Heat/hot water

    Entire building

    Aug 8, 2018 · Apt ALL

    Close
  • Heat/hot water

    Entire building

    Aug 8, 2018 · Apt BLDG

    Close
  • General

    Ventilation system

    Jan 8, 2010 · Apt 18K

    Close
  • Nonconst

    Vermin

    Oct 1, 2008 · Apt 16J

    Close
  • Nonconst

    Vermin

    Oct 1, 2008 · Apt 16J

    Close
Show 7 more ↓
  • Nonconst

    Vermin

    Oct 1, 2008 · Apt 16J

    Close
  • Nonconst

    Vermin

    Oct 1, 2008 · Apt 16J

    Close
  • Nonconst

    Vermin

    Oct 1, 2008 · Apt 16J

    Close
  • Nonconst

    Vermin

    Oct 1, 2008 · Apt 16J

    Close
  • Nonconst

    Vermin

    Jul 22, 2008 · Apt 16J

    Close
  • Heating

    Heat related

    Oct 23, 2006 · Apt 1602

    Close
  • Heating

    Heat related

    Nov 1, 2004 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1929
Floors
41
Residential units
179
Building area
273,186 ft²
Lot area
20,263 ft²
Zoning
C6-6
Community board
302
Council district
35
Block / lot
2111 / 7501
Assessed value
$30,403,890
Landmark / historic district
INDIVIDUAL AND INTERIOR LANDMARK

HPD registration #380902, last renewed Nov 18, 2025.

Questions about 1 Hanson Place

Who owns 1 Hanson Place?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 1 Hanson Place have violations?

Yes. NYC HPD has recorded 11 housing violations at this property.

Is 1 Hanson Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1 Hanson Place built?

City records list 1929 as the year it was built.

How many apartments are in 1 Hanson Place?

It has 179 residential units and 197 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.