96 Rockwell Place is a condominium built in 1920 in Brooklyn, 11217. It has 37 residential units across 13 floors. The owner of record is Unavailable Owner. HPD has recorded 1 housing violation here, most recently on April 19, 2021.

HPD violations
1
DOB violations
14
ECB violations
18
HPD complaints
14

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 19, 2021

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 19, 2021

    Closed — Violation dismissed

DOB building violations · 14

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 22, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2019

    Dob violation - resolved
Show 4 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 9, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2018

    Dob violation - resolved
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 21, 2017

    Dob violation - dismissed
  • Construction other optional

    Stop all plumbing work immediately, contact borough comm. office @ 718 802-3677

    May 13, 2015

    Dob violation - dismissed

ECB violations · 18

  • Class - 2

    12 story building, with active facade work in progress using supported scaffold(sf) on top of sidewalk shed(sws). upon request to view plans i observed sf has 4 levels planked, plans show1, sws has storage of e

    Aug 29, 2023

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#916430.rem:submit acceptable required t

    Dec 9, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Chimney termination cap is missing/gas regulator is not vented to the outdoors/#1 hot water heater is leaking;correct violation and submit the certificate of correction

    Jul 12, 2021 · Penalty $310

    Resolve
  • Class - 2

    Chimney termination cap missing/gas regulator not vented to the outdoors/both fire extinguishers defective/storage in boiler room;correct violation and submit the certificate of correction

    Jul 12, 2021 · Penalty $310

    Resolve
  • Class - 1

    (cease use)(5-a-10)door zone restrictor not working tampered with disabled.this is a safety feature to ensure passengers safety

    Oct 4, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Sidewalk shed does not meet code specifications. noted: in front of jobsite fence sidewalk shed lighting was not working @ time of inspection. remedy: conform shed to code specifications.

    Oct 8, 2008 · Penalty $2,400

    Resolve
  • Non-hazardous

    83xx/.83-elevator out of service restore it to service.call for inspection 212-566-5512

    Dec 27, 2007 · Penalty $350

    Resolve
  • Hazardous

    Sec. 27-1069. no permit for welding & cutting operation. noted: welderon 12th floor welding column & there is no license or permit on his person nor in office. remedy: stop all work. engineer to visit site to

    Oct 22, 2007 · Penalty $2,000

    Resolve
  • Hazardous

    Sec. 27-230. failure to protect roof & roof outlets of adjoining structures. noted: structural steel up to bulk head & adjoining bldg east &west not adequately protected. areas where protection is partially in

    Oct 22, 2007 · Penalty $500

    Resolve
  • Hazardous

    No elevator in readiness. noted: structural steel up to bulk head & elevator service up to 6th floor the 12 floor is poured. remedy: stop all work above 7th floor. make area safe. provide elevator service as

    Oct 22, 2007 · Penalty $1,000

    Resolve
Show 8 more ↓
  • Hazardous

    No protection at walk way during construction operation. noted: adding4 stories to (existing) bldg & there is no protection at rear walk waythat is constantly used alterating (site) & both adjoining property.

    Oct 22, 2007 · Penalty $2,000

    Resolve
  • Hazardous

    Sec. 27-1014. no horizontal net. noted: structural steel up to bulk head & there is no horizontal net. remedy: stop all work above 75 feet. provide horizontal nets as per code.

    Oct 22, 2007 · Penalty $1,000

    Resolve
  • Hazardous

    No standpipe system. noted: structural steel up to bulk head 12th floor is (poured) & stand pipe up to 9th floor. remedy: stop all work above 10th floor. provide stand pipe system as per code.

    Oct 22, 2007 · Penalty $1,000

    Resolve
  • Hazardous

    Vertical safety net not maintained.noted:structural steel up to bulk head vertical safety net not maintained on 9-11 fls at some areas on these fls is missing & others not to code.remedy:maintain vertical safet

    Oct 22, 2007 · Penalty $500

    Resolve
  • Hazardous

    No guard rail. noted: structural steel up to bulk head & center guard rail missing on 9-11 floor perimeter also at shaft opening. remedy: provide guard rail as per code.

    Oct 22, 2007 · Penalty $1,000

    Resolve
  • Hazardous

    No toe board. noted: structural steel up to bulk head & there is no toe board on 9-11 floor perimeter at some areas. nets are installed but no secured to floor, some areas nets not to code. remedy: provide toe

    Oct 22, 2007 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to safeguard public & property during construction operation. noted: structural steel up to bulk head gas cylinders stored on 6,7 floors & no certificate for storage on site, no fire watch on site

    Oct 22, 2007 · Penalty $1,000

    Resolve
  • Hazardous

    No documentation for vertical safety net from manufacturer. noted: vertical safety net installed & there is no documentation from the manufacturer the nets in many areas appear inadequate for protection. not to

    Oct 22, 2007 · Penalty $1,000

    Resolve

Complaints

  • Plumbing

    Water supply

    Nov 26, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 29, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2021 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Apr 9, 2018 · Apt 2K

    Close
  • Paint/plaster

    Wall

    Apr 9, 2018 · Apt 2K

    Close
  • Heating

    Heat related

    Feb 28, 2014 · Apt 2A

    Close
  • Heating

    Heat related

    May 8, 2012 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Mar 30, 2010 · Apt 6A

    Close
  • Paint/plaster

    Ceiling

    Mar 30, 2010 · Apt 6A

    Close
  • Plumbing

    Water-leaks

    Mar 30, 2010 · Apt 6A

    Close
Show 4 more ↓
  • Paint/plaster

    Ceiling

    Mar 30, 2010 · Apt 6A

    Close
  • Paint/plaster

    Ceiling

    Mar 30, 2010 · Apt 6A

    Close
  • Paint/plaster

    Ceiling

    Mar 30, 2010 · Apt 6A

    Close
  • General

    Mold

    Mar 30, 2010 · Apt 6A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1920
Floors
13
Residential units
37
Building area
33,581 ft²
Lot area
3,567 ft²
Zoning
C6-4
Community board
302
Council district
35
Block / lot
2106 / 7501
Assessed value
$4,657,495
Landmark / historic district
No

HPD registration #382570, last renewed Sep 4, 2025.

Questions about 96 Rockwell Place

Who owns 96 Rockwell Place?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 96 Rockwell Place have violations?

Yes. NYC HPD has recorded 1 housing violations at this property.

Is 96 Rockwell Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 96 Rockwell Place built?

City records list 1920 as the year it was built.

How many apartments are in 96 Rockwell Place?

It has 37 residential units and 38 units in total.