Myrtle Avenue
Brooklyn, NY 11201BBL 3-02050-0001Map
Owner of record: NYC Housing Authority
Myrtle Avenue is an elevator apartment building built in 1939 in Brooklyn, 11201. It has 542 residential units across 6 floors. The owner of record is NYC Housing Authority. HPD has recorded 3 housing violations here, most recently on February 23, 2012. 3 of the 3 most recent violations are still open.
- HPD violations
- 3
- DOB violations
- 130
- ECB violations
- 81
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the private hallway located at apt 10f, 10th story, 2nd apartment from east at south
Feb 23, 2012 · Apt 10F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the 3rd room from north at east located at apt 10f, 10th story, 2nd apartment from east at south
Feb 23, 2012 · Apt 10F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt 10f, 10th story, 2nd apartment from east at south
Feb 23, 2012 · Apt 10F
Open — Nov sent out
DOB building violations · 130
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
Dec 7, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
May 13, 2022
Dob violation - dismissed - Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
Apr 20, 2022
Dob violation - dismissed - Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
Apr 13, 2022
Dob violation - dismissed - Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
Apr 1, 2022
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2020
Jun 20, 2021
Dob violation - dismissed - Construction other optional
Due to an fdny ambulance striking the sidewalk shed at exposure 2 disloging1 main bean 2 vertical supports and cross braces rendering premises non complaint
Nov 7, 2020
Dob violation - dismissed - Facade safety program facade required
Nycha unsafe cycle 8 report filed
Feb 20, 2020
Dob violation - dismissed - Facade safety program facade required
Nycha unsafe cycle 8 report filed
Feb 20, 2020
Dob violation - dismissed - Facade safety program facade required
Nycha unsafe cycle 8 report filed
Feb 20, 2020
Dob violation - dismissed - Facade safety program facade required
Nycha unsafe cycle 8 report filed
Feb 20, 2020
Dob violation - dismissed - Facade safety program facade required
Nycha unsafe cycle 8 report filed
Feb 20, 2020
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 17, 2020
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 17, 2020
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 17, 2020
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 17, 2020
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 13, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Sep 17, 2013
Dob violation - dismissed
ECB violations · 81
- Class - 2
Failure to maintain building wall or appurtenances. as noted: at time of inspection, observed all units installed at windows without proper bracket being installed on exp #1, 2, 3, 4. remedy: maintain exterior
Sep 27, 2025 · Penalty $2,500
Active - Class - 2
Sidewalk shed installed at all exposure contrary to code specification, observed multiple horizontal members under sidewalk shed across pedestrian pathway installed at approximately 6ft 11" & does not meet 8ft
Sep 25, 2025 · Penalty $2,400
Resolve - Class - 2
At the time of inspection i observed, two missing parapet panels on shed at exposure#1 inside gated area. i also observed shed leaning with a gap and 2 loose damage panels at exposure#3 outside of building fenc
May 6, 2025 · Penalty $2,400
Resolve - Class - 2
Bc3307.6.4.4 at the time of inspection of 6-story occupied multi-family building facade repair in progress, observed sidewalk shed at exposure 1 and 2, not maintained. post is not plumb, horizontal braces are b
Oct 7, 2024 · Penalty $2,400
Active - Class - 1
Failure to maintain building exterior facade and appurtenances.-note: at time of inspection, i observed expsoure #2 east. broken windows 7 fl southeast end.-exposure #3 south has broken windows 7 fl southeast c
Apr 26, 2024 · Penalty $2,500
Active - Class - 2
Failure to maintain building exterior facade and appurtenances. note: at time of inspection, i observed at exposure #4 below top fl. window at south west end, a brick with missing mortar at top and right joints
Apr 26, 2024 · Penalty $1,250
Active - Class - 2
Failure to maintain building exterior facade and appurtenances. note: at time of inspection, i observed a horizontal crack on the bulkhead, above stairway door. remedy: maintain building exterior facade and app
Apr 26, 2024 · Penalty $1,250
Active - Class - 2
Failure to maintain building exterior facade and appurtenances. note: at time of inspection, i observed at exposure #1 south. plastic flowerpots on window sills at 7 fl. east facing window and 5 fl. west facing
Apr 26, 2024 · Penalty $1,250
Resolve - Class - 1
Manufacturer specifications. observed 2 suspended scaffold platforms (1 in use at exp#3) with the platform arrangement contrary toi the skyclimber manufacturer specs- configuration of platform sections not as s
Nov 3, 2023 · Penalty $2,500
Resolve - Class - 2
Observed overhead protection (sidewalk shed) above a walkway at exp#2, with the lateral cross-bracing near the top of the shed installed horizontally instead of vertically as per the dob-approved design drawing
Nov 3, 2023
Resolve
Show 40 more ↓
- Class - 1
Obsvd outrigger beam suspended scaffolds at all exps with conditions contrary to cd5- lifelines + tie-back lines not protected against sharp edges aand multiple lines running at an angle, a-frame beam setups w/
Nov 3, 2023 · Penalty $2,500
Resolve - Class - 1
At the time of my inspection of a 11 story building, i observed supported pipe scaffold at exposure #3 with a debris chute install in it and debris netting around scaffold and chute was loose. this creates a ha
Oct 2, 2023 · Penalty $2,500
Resolve - Class - 1
-worker injured due to fallen debris from roof, taken to off site medical facility. permit holder job#321229915 failed to submit report within 3 business days of required 16 items by code 28-103.21 per 28-103.2
May 23, 2023 · Penalty $2,500
Resolve - Class - 1
Noted worker was struck by debris falling from 11th floor while she was on second floor shed. worker was taken to hospital for injury to torso. safeguards not in place to prevent worker from entering controlled
May 17, 2023
Resolve - Class - 2
Responding to accident where worker was struck by brick from 11th floor no 16hr ss card for worker struck, worker on scaffold above who dropped debris, or other workers provided. incident happenened 11am and in
May 17, 2023 · Penalty $1,250
Resolve - Class - 1
At the time of inspection while responding, to a complaint concerning an unsafe scaffold on the jobsite, i observed a guardrail system installed at roof level around the perimeters missing toe boards and are no
Apr 3, 2023 · Penalty $625
Resolve - Class - 1
At the time of inspection while responding, to a complaint concerning an unsafe scaffold on the jobsite, i observed a guardrail system installed at roof level around the perimeters missing toe boards and are no
Apr 3, 2023 · Penalty $625
Resolve - Class - 2
Active site- gc working on exterior ramp. upon request, worker safety orientations and pre-shift safety meetings were not provided. also, upon review of the construction superintendent's logbook, i found that t
Oct 28, 2022
Resolve - Class - 1
Platform 19, 20 length at exp#3 not setup as per cd5 installed one platform with ~44' long with only 2 outriggers instead of 2 platform 22' each with 4 outriggers that's big span length. bolt type shackle front
Apr 27, 2022 · Penalty $2,500
Resolve - Class - 2
Found easco boiler model #fps 350-50 with king valve leaking above boiler and leak at condensate pump piping in boiler room correct violating condition submit certificate of correction
Mar 7, 2022 · Penalty $625
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.note:time of inspection it was observed the contractor failed in his duties by allowing workers to stock pile bricks and construction debris on
May 21, 2021 · Penalty $2,500
Resolve - Class - 1
Work w/out permit.note:at the time of my inspection of a 6 story,facade restoration bldg,i observed a chute of over 60 ft in height.upon request for permit to install the chute,none was provided.remedy:stop all
Apr 6, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to take and provide adequate saftey measure such as side walk shed fence ect where required to protect and secure pubcli sfaety from documented unsafe facade as per 1rcny 103-04.facade technical report
Mar 20, 2020 · Penalty $10,000
Resolve - Class - 2
Failure to maintain buidlings exterior walls facade and appurtenances at the time of insepction observed air condition unit support inadequate at many locations maintain buiding walls facade and appurtenances p
Mar 20, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to take and provide adequate safety measures such as sidewalk shed fence ect.where required to protect and secure public safety from documented unsafe as per 1rcny 103-04.facade technical report file by
Mar 19, 2020 · Penalty $10,000
Resolve - Class - 2
1rcny 3301-02(d) construction superintendent fails to maintain and/or make job site logs available. noted:at time of my inspection of an alteration 2 work in progress,i inquired to see the job site log books,i
Feb 26, 2019
Resolve - Class - 1
Construction superintendent failed to perform duties as per rule. noted:at time of my inspection of an alteration 2 work in progress,i entered the work area and asked to speak w/ the superintendent,i was told h
Feb 26, 2019
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 809535. required: submit required technical report
Oct 15, 2018
Resolve - Class - 2
Failure to submit a requied cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #809534. rmdy: submit required technical report.
Oct 15, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 809536. required: submit required technical report
Oct 15, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances by 28-302.4 for control #809532. rmdy: submit required technical report.
Oct 15, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 809528. required: submit required technical report
Oct 15, 2018
Resolve - Class - 2
Failure to submit a requied cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #809533. rmdy: submit required technical report.
Oct 15, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 809526. required: submit required technical report
Oct 15, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances by 28-302.4 for control #809527. rmdy: submit required technical report.
Oct 15, 2018
Resolve - Class - 2
Failure to submit a requied cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #809531. rmdy: submit required technical report.
Oct 15, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances by 28-302.4 for control #809525. rmdy: submit required technical report.
Oct 15, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 809530. required: submit required technical report
Oct 15, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 809529. required: submit required technical report
Oct 15, 2018
Resolve - Class - 2
This is a temporary boiler connected to building gas piolit regulator defective fresh air fan defective sail switch defective
Aug 7, 2018 · Penalty $3,125
Resolve - Class - 2
20180816
Aug 7, 2018
Resolve - Class - 2
20180816
Aug 7, 2018
Resolve - Class - 2
This is a temporary boiler connected to this building fresh air fan is defective sail switch is defective lights defective gas piolit regulator defective hot water heat exchanger in cellar the safety valves no
Aug 7, 2018 · Penalty $3,125
Resolve - Class - 2
Temporary construction equipment on site. expired permit. noted:at time of inspection there is a sidewalk shed on exp. #1 of bldg with expired permit #340156618. remedy:renew permit
Mar 22, 2016 · Penalty $2,000
Resolve - Class - 2
Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.36010130l.rem:file an amended report following remedial re
Jul 16, 2010
Resolve - Class - 2
Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.36010145y.rem:file an amended report following remedial re
Jul 16, 2010
Resolve - Class - 2
Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.36010144m.rem:file an amended report following remedial re
Jul 16, 2010
Resolve - Class - 2
Failure to provide sidewalk shed or safety measures where required ording to the cycle #6 technical report (tr6) filed as unsafe of the local law 11/98.remedy:provide sidewalk shed or safety measures where
Feb 12, 2010
Resolve - Class - 2
Failure to provide sidewalk shed or safely measures where required accordingly to the cycle #6 technical report (tr6) filed as unsafe of thelocal law 11/98.remedy:provide safety measures or sidewalk shed where
Feb 12, 2010
Resolve - Class - 2
Failure to provide sidewalk shed or safety measures where required according to the cycle #6 technical report (tr6) filed as unsafe of the local law 11/98.remedy:provide safety measures or sidewalk shed where
Feb 12, 2010
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 20, 2025 · Apt 1F
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1939
- Floors
- 6
- Residential units
- 542
- Building area
- 647,470 ft²
- Lot area
- 459,742 ft²
- Zoning
- R6
- Community board
- 302
- Council district
- 35
- Block / lot
- 2050 / 1
- Assessed value
- $17,572,050
- Landmark / historic district
- No
Questions about Myrtle Avenue
Who owns Myrtle Avenue?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does Myrtle Avenue have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is Myrtle Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was Myrtle Avenue built?
City records list 1939 as the year it was built.
How many apartments are in Myrtle Avenue?
It has 542 residential units and 543 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.