roofy

498 Clinton Avenue

Brooklyn, NY 11238BBL 3-02010-0037Map

Owner of record: Clinton Palace LLC

498 Clinton Avenue is a walk-up apartment building built in 1930 in Brooklyn, 11238. It has 8 residential units across 4 floors. The owner of record is Clinton Palace LLC. HPD has recorded 170 housing violations here, most recently on April 7, 2021.

HPD violations
170
DOB violations
12
ECB violations
1
HPD complaints
181

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 7, 2021

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 170

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 7, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 7, 2020

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Aug 29, 2018

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame, 1st story, public hall

    Aug 29, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Aug 29, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Aug 29, 2018

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the kitchen located at apt 4r, 4th story, apartment at west

    Apr 10, 2018 · Apt 4R

    Closed — Violation closed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at front of building at fire escape

    Apr 10, 2018

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors at vestibule at public hall, 1st story

    Apr 10, 2018

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Apr 10, 2018

    Closed — Violation closed
Show 40 more ↓
  • C

    M/d law abate the nuisance consisting of freestanding radiator at public hall, 3rd story

    Apr 10, 2018

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of washbasin at public hall, 3rd story

    Apr 10, 2018

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors .. in the entrance located at apt 4r, 4th story, apartment at west

    Apr 10, 2018 · Apt 4R

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2017

    Closed — Violation dismissed
  • A

    Refit upper and lower window sashes in the entire apartment located at apt 2r, 2nd story, apartment at west

    Dec 17, 2016 · Apt 2R

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation , 1st riser from south at west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st window frame from west at north wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ,window guard installed with screws, located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation , 1st radiator from north at east wall, 1st door from north at east wall, 1st door frame from north at east wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , north wall, ceiling in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department , 1st window sash from west at north wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , ceiling, west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department , 1st door frame from east at south wall in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , ceiling in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation , 1st radiator from west at north wall in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 1, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice located at apt 2r, 2nd story, 1st apartment from south at west

    Apr 26, 2016 · Apt 2R

    Closed — Violation closed
  • A

    Properly repair the broken or defective pull swith at light fixture on south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Apr 26, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 3; in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall, 1st riser from north at east wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st door from north at east wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Replace with new the broken or defective refrigerator gasket in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at bathroom in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from west at north wall in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Mar 7, 2016 · Apt 2R

    Closed — Violation closed
  • B

    Fire escape defective. replace with new the broken, defective and/or missing bolt & nut at ladder shoe at front areaway

    Dec 5, 2015

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; located at apt 2r, 2nd story, 1st apartment from south at west

    Dec 5, 2015 · Apt 2R

    Closed — Violation closed
  • B

    Replace with new the missing wash basin in the bathroom located at apt 3f, 3rd story, 1st apartment from north at east

    Nov 2, 2015 · Apt 3F

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 8, 2015

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from north at west located at apt 4f, 4th story, 1st apartment from west at north

    Oct 7, 2015 · Apt 4F

    Closed — Violation closed

DOB building violations · 12

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - active
  • Construction other optional

    C-construction other optional

    May 1, 1991

    Dob violation - dismissed
Show 2 more ↓
  • Construction other optional

    C-construction other optional

    Feb 28, 1991

    Vp-violation unserved ecb-active
  • Construction other optional

    C-construction other optional

    Dec 22, 1990

    Dob violation - active

ECB violations · 1

  • Non-hazardous

    Failure to maintain cornice at roof level is rotted and defective sections collapsed & sections in danger of collapse unsafe remedy provide protection for occupants of premise forthwith remove all

    May 1, 1991

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Feb 10, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 3, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 3, 2019 · Apt 4R

    Close
  • Water leak

    Slow leak

    Aug 21, 2018 · Apt 3R

    Close
  • Safety

    Carbon monoxide detector

    Apr 20, 2018 · Apt 3R

    Close
  • Safety

    Smoke detector

    Apr 20, 2018 · Apt 3R

    Close
  • Plumbing

    Radiator

    Apr 20, 2018 · Apt 3R

    Close
  • Door/window

    Window frame

    Apr 20, 2018 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Apr 10, 2018 · Apt 4F

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Apr 9, 2018 · Apt 4R

    Close
  • Heat/hot water

    Entire building

    Mar 15, 2018 · Apt 4R

    Close
  • Door/window

    Window pane

    Mar 9, 2018 · Apt 3R

    Close
  • Plumbing

    Radiator

    Mar 9, 2018 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Nov 22, 2016 · Apt 2R

    Close
  • General

    Cabinet

    Nov 22, 2016 · Apt 2R

    Close
  • Door/window

    Window frame

    Nov 22, 2016 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Nov 22, 2016 · Apt 2R

    Close
  • Water leak

    Slow leak

    Nov 22, 2016 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Jul 22, 2016 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Jul 22, 2016 · Apt 2R

    Close
  • Electric

    No lighting

    Jul 22, 2016 · Apt 2R

    Close
  • Door/window

    Door

    Apr 14, 2016 · Apt 2R

    Close
  • Electric

    No lighting

    Apr 14, 2016 · Apt 2R

    Close
  • Door/window

    Window frame

    Apr 14, 2016 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Apr 14, 2016 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Apr 14, 2016 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Apr 14, 2016 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Apr 14, 2016 · Apt 2R

    Close
  • Safety

    Window guard broken/missing

    Apr 14, 2016 · Apt 2R

    Close
  • General

    Cabinet

    Feb 29, 2016 · Apt 2R

    Close
  • Electric

    Lighting

    Feb 29, 2016 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Feb 29, 2016 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Feb 29, 2016 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Feb 29, 2016 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Dec 21, 2015 · Apt 4R

    Close
  • Flooring/stairs

    Stairs

    Dec 21, 2015 · Apt 4R

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2015 · Apt 4R

    Close
  • Flooring/stairs

    Floor

    Dec 5, 2015 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Dec 5, 2015 · Apt 2R

    Close
  • Safety

    Carbon monoxide detector

    Oct 20, 2015 · Apt 3F

    Close
  • Safety

    Smoke detector

    Oct 20, 2015 · Apt 3F

    Close
  • Plumbing

    Water supply

    Oct 20, 2015 · Apt 3F

    Close
  • Plumbing

    Water supply

    Oct 20, 2015 · Apt 3F

    Close
  • Plumbing

    Basin/sink

    Oct 20, 2015 · Apt 3F

    Close
  • Door/window

    Window frame

    Oct 2, 2015 · Apt 4F

    Close
  • Plumbing

    Water supply

    Oct 2, 2015 · Apt 4F

    Close
  • Plumbing

    Bathtub/shower

    Oct 2, 2015 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Oct 2, 2015 · Apt 4F

    Close
  • Water leak

    Damp spot

    Oct 2, 2015 · Apt 2F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1930
Floors
4
Residential units
8
Building area
6,000 ft²
Lot area
2,400 ft²
Zoning
R7A
Community board
302
Council district
35
Block / lot
2010 / 37
Assessed value
$1,231,200
Landmark / historic district
No

HPD registration #347536, last renewed Jun 2, 2025.

Questions about 498 Clinton Avenue

Who owns 498 Clinton Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Clinton Palace LLC.

Does 498 Clinton Avenue have violations?

Yes. NYC HPD has recorded 170 housing violations at this property.

Is 498 Clinton Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 498 Clinton Avenue built?

City records list 1930 as the year it was built.

How many apartments are in 498 Clinton Avenue?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.