101 Madison Street
Brooklyn, NY 11216BBL 3-01988-0047Map
Owner of record: Dca 1 Apartments, INC.
101 Madison Street is a walk-up apartment building built in 1974 in Brooklyn, 11216. It has 8 residential units across 4 floors. The owner of record is Dca 1 Apartments, INC.. HPD has recorded 309 housing violations here, most recently on June 15, 2026. 8 of the 50 most recent violations are still open.
- HPD violations
- 309
- DOB violations
- 5
- ECB violations
- 0
- HPD complaints
- 250
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 309
- CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rat burrows observed. 1 at front yard. 1 at rear yard. yard
Jun 15, 2026
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 15, 2026
Open — First no access to re- inspect violation - BHazardous
Remove all encumbrances consisting of coolers, baby carraiges and household items stored at public hall, 1st story
Jun 15, 2026
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective latch assembly at building entrance door at public hall, 1st story
Jun 4, 2026
Open — Not complied with - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at observed 7 rat burrows at front yard, 1 rat burrow st rear yard yard
Jun 4, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story
Jun 4, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to rear yard at public hall, 1st story
Jun 4, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 1b, 1st story, 1st apartment from north at east
May 19, 2026 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department west wall at public hall, 1st story
May 18, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 1st story
May 18, 2026
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at west wall at public hall, 1st story
May 18, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance , 1st story
May 18, 2026
Open — Not complied with - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at observed rat in 1st room from north at east in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Apr 15, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of pests. evidence of ants in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Apr 15, 2026 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
Refit the door in the entrance located at apt 4b, 4th story, 1st apartment from north at east
Apr 15, 2026 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rat hole observed in front west yard yard
Apr 15, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lock assembly at public hall, 1st story
Nov 14, 2025
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Nov 14, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of excessive storage of material in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jul 2, 2025 · Apt 4B
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at flooring in the private hallway located at apt 4b, 4th story, 1st apartment from north at east
Jul 2, 2025 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jul 2, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wash basin in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Jun 2, 2025 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jun 2, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at west wall in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from north located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood closet door in the kitchen located at apt 4a, 4th story, 1st apartment from south at west
Jun 2, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wood door in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Jun 2, 2025 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings and all walls in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Jun 2, 2025 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly in the entrance located at apt 4b, 4th story, 1st apartment from north at east
Jun 2, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling inside closet in the kitchen located at apt 4b, 4th story, 1st apartment from north at east
Jun 2, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base radiator cover at north wall in the 1st room from north located at apt 4b, 4th story, 1st apartment from north at east
Jun 2, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 4b, 4th story, 1st apartment from north at east
Jun 2, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 4th room from north located at apt 4b, 4th story, 1st apartment from north at east
Jun 2, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wash basin in the bathroom located at apt 4b, 4th story, 1st apartment from north at east
Jun 2, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jun 2, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Open — Not complied with - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4b, 4th story, 1st apartment from north at east
Jun 2, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak celing in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
Jun 2, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in bath tub in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Jun 2, 2025 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and all ceilings in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Jun 2, 2025 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and all ceilings in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jun 2, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2025 · Apt 3A
Closed — Violation dismissed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
Jul 15, 2026 · Apt 3A
Close - Plumbing
Toilet
Jul 15, 2026 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Jun 11, 2026 · Apt 1B
Close - Door/window
Door to dumbwaiter
Jun 2, 2026 · Apt 1B
Close - Unsanitary condition
Pests
May 1, 2026 · Apt 3B
Close - Unsanitary condition
Pests
May 1, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Apr 27, 2026 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Apr 15, 2026 · Apt 3A
Close - Door/window
Door
Apr 13, 2026 · Apt 4B
Close - Flooring/stairs
Floor
Apr 13, 2026 · Apt 4B
Close
Show 40 more ↓
- Door/window
Window frame
Apr 13, 2026 · Apt 4B
Close - Unsanitary condition
Mold
Apr 13, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Apr 13, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Apr 13, 2026 · Apt 4B
Close - Safety
Carbon monoxide detector
Feb 12, 2026 · Apt 3A
Close - Door/window
Door
Feb 12, 2026 · Apt 3A
Close - Appliance
Electric/gas range
Feb 12, 2026 · Apt 3A
Close - Door/window
Door
Nov 7, 2025 · Apt 1B
Close - Water leak
Heavy flow
Nov 7, 2025 · Apt 1B
Close - Door/window
Door
Nov 5, 2025 · Apt 1B
Close - Water leak
Slow leak
Nov 5, 2025 · Apt 1B
Close - Unsanitary condition
Mold
Nov 5, 2025 · Apt 1B
Close - Water leak
Heavy flow
Aug 28, 2025 · Apt 1B
Close - Paint/plaster
Wall
Jun 27, 2025 · Apt 4B
Close - Door/window
Door
Jun 27, 2025 · Apt 4B
Close - Appliance
Refrigerator
Jun 27, 2025 · Apt 4B
Close - Flooring/stairs
Floor
Jun 27, 2025 · Apt 4B
Close - Flooring/stairs
Floor
Jun 27, 2025 · Apt 4B
Close - Electric
Lighting
Apr 11, 2025 · Apt 3A
Close - Water leak
Heavy flow
Apr 11, 2025 · Apt 3A
Close - Unsanitary condition
Pests
Mar 5, 2025 · Apt 3B
Close - Unsanitary condition
Pests
Jan 28, 2025 · Apt 3B
Close - Paint/plaster
Wall
Jan 28, 2025 · Apt 3B
Close - Water leak
Heavy flow
Dec 4, 2024 · Apt 3A
Close - Unsanitary condition
Mold
Dec 4, 2024 · Apt 3A
Close - Water leak
Heavy flow
Oct 29, 2024 · Apt 3A
Close - Water leak
Heavy flow
Oct 5, 2024 · Apt 1B
Close - Plumbing
Bathtub/shower
Sep 30, 2024 · Apt 4B
Close - Plumbing
Basin/sink
Sep 30, 2024 · Apt 4B
Close - Plumbing
Toilet
Sep 30, 2024 · Apt 4B
Close - Water leak
Heavy flow
Sep 16, 2024 · Apt 1B
Close - Paint/plaster
Ceiling
Sep 11, 2024 · Apt 3B
Close - Unsanitary condition
Mold
Sep 11, 2024 · Apt 3B
Close - Water leak
Damp spot
Sep 11, 2024 · Apt 3B
Close - Paint/plaster
Ceiling
Sep 11, 2024 · Apt 3B
Close - Unsanitary condition
Mold
Sep 10, 2024 · Apt 3B
Close - Water leak
Damp spot
Sep 10, 2024 · Apt 3B
Close - Paint/plaster
Ceiling
Sep 10, 2024 · Apt 3B
Close - Paint/plaster
Ceiling
Sep 10, 2024 · Apt 3B
Close - Water leak
Heavy flow
Jul 2, 2024 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1974
- Floors
- 4
- Residential units
- 8
- Building area
- 9,759 ft²
- Lot area
- 1,875 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1988 / 47
- Assessed value
- $1,076,400
- Landmark / historic district
- No
HPD registration #374488, last renewed Aug 13, 2025.
Questions about 101 Madison Street
Who owns 101 Madison Street?
The owner of record in NYC Department of City Planning PLUTO data is Dca 1 Apartments, INC..
Does 101 Madison Street have violations?
Yes. NYC HPD has recorded 309 housing violations at this property.
Is 101 Madison Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 101 Madison Street built?
City records list 1974 as the year it was built.
How many apartments are in 101 Madison Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.