116 Cambridge Place is a walk-up apartment building built in 1914 in Brooklyn, 11238. It has 20 residential units across 6 floors. The owner of record is Cambridge Hgts Hous Deve Fund Corp. HPD has recorded 101 housing violations here, most recently on November 29, 2024. 46 of the 50 most recent violations are still open.

HPD violations
101
DOB violations
11
ECB violations
0
HPD complaints
100

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 29, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 101

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2024

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective upper sash spring balance at 1st window from north at east wall. in the 1st room from east at south located at apt 1d, 1st story, 1st apartment from west at north

    Mar 7, 2023 · Apt 1D

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 23, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 7, 2021

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at south located at apt 3c, 3rd story, 2nd apartment from north at east

    Feb 25, 2021 · Apt 3C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east at south located at apt 3c, 3rd story, 2nd apartment from north at east

    Feb 25, 2021 · Apt 3C

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak above ceiling in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective parquet floor tiles in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
  • A

    Refit lower window sash 1st at east in the 1st room from east at north located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
  • A

    Refit lower window sash 2nd at east in the 1st room from east at north located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
Show 40 more ↓
  • A

    Refit lower window sash 3rd at east in the 1st room from east at north located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
  • A

    Refit lower window sash 1st at east in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
  • A

    Refit lower window sash 2nd at east in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood baseboard molding at south wall in the 1st room from east at north located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood parquet floor tiles in the kitchen located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Feb 17, 2021

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Feb 17, 2021

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east

    Feb 17, 2021 · Apt 3D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 2b, 2nd story, 1st apartment from south at west

    Sep 18, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 2b, 2nd story, 1st apartment from south at west

    Sep 18, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at north located at apt 2b, 2nd story, 1st apartment from south at west

    Jul 19, 2018 · Apt 2B

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at north, the 4th room from east at south located at apt 3a, 3rd story, 1st apartment from south at west

    Mar 16, 2018 · Apt 3A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east at north located at apt 3a, 3rd story, 1st apartment from south at west

    Mar 16, 2018 · Apt 3A

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Mar 16, 2018 · Apt 3A

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Mar 16, 2018 · Apt 3A

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Mar 16, 2018 · Apt 3A

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 27, 2017

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Dec 27, 2017

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Dec 27, 2017

    Open — Nov sent out
  • B

    Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 3c, 3rd story, 2nd apartment from north at east

    Aug 18, 2017 · Apt 3C

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 3c, 3rd story, 2nd apartment from north at east

    Aug 18, 2017 · Apt 3C

    Open — Nov sent out
  • B

    Properly repair the broken or defective and make operative the bell-buzzer / intercom system at east wall in the kitchen located at apt 3c, 3rd story, 2nd apartment from north at east

    Aug 18, 2017 · Apt 3C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story

    Jan 18, 2017

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective the fire retardant plaster ceiling at public hall, 5th story

    Jan 18, 2017

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling at public hall, 5th story

    Jan 18, 2017

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the bathroom located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 19, 2016 · Apt 3A

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation , 1st riser from west at north wall in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 19, 2016 · Apt 3A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ' chair rails at north wall, 1st door from east at south wall in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 19, 2016 · Apt 3A

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... .. 2nd closet from west at north wall ceiling in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 19, 2016 · Apt 3A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , 2nd closet from west at north wall wall, 2nd closet from west at north wall ceiling in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 19, 2016 · Apt 3A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from east at north located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 19, 2016 · Apt 3A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 19, 2016 · Apt 3A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 19, 2016 · Apt 3A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , 1st door frame from north at east wall in the 4th room from east at north located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 19, 2016 · Apt 3A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , ceiling in the 4th room from east at north located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 19, 2016 · Apt 3A

    Open — Nov sent out
  • B

    Arrange and make self-closing the doors fire proof self closing door. in the entrance located at apt 5b, 2nd story, 1st apartment from south at west

    Feb 20, 2016 · Apt 5B

    Open — Nov sent out
  • B

    Arrange and make self-closing the doors in the entrance located at apt 5b, 5th story, 1st apartment from south at west

    Oct 24, 2015 · Apt 5B

    Open — Nov sent out
  • A

    Refit door in the entrance located at apt 5b, 5th story, 1st apartment from south at west

    Oct 24, 2015 · Apt 5B

    Open — Nov sent out
  • B

    Properly repair the broken or defective door knob in the entrance located at apt 5b, 5th story, 1st apartment from south at west

    Oct 24, 2015 · Apt 5B

    Open — Nov sent out

DOB building violations · 11

  • Immediate emergency anythingoptional

    Erect 103' fence, 10' away from the wall, leaving 6ft wide passageway for fire egree

    Oct 2, 2023

    Dob violation - active
  • Construction other optional

    A brick retaining wall with dimensions, 80 linear feet by 6 feet in height (view from north) and 23 linear feet by 9 feet in height (view from south), at rear yard, leaning inward. the out of plumbed earth retaining wall, caused by 2 feet diameter tree, planted on 195 st. james place rear yard, has a potential for collapse.

    Sep 27, 2023

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
Show 1 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Outside building

    Roof door/hatch

    Jun 15, 2026 · Apt 5A

    Close
  • Paint/plaster

    Ceiling

    Feb 26, 2023 · Apt 1D

    Close
  • Paint/plaster

    Wall

    Oct 12, 2021 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Feb 16, 2021 · Apt 3D

    Close
  • Flooring/stairs

    Floor

    Feb 16, 2021 · Apt 3D

    Close
  • Door/window

    Window frame

    Feb 16, 2021 · Apt 3D

    Close
  • Door/window

    Door

    Feb 16, 2021 · Apt 3D

    Close
  • Plumbing

    Steam pipe/riser

    Feb 16, 2021 · Apt 3D

    Close
  • Water leak

    Heavy flow

    Feb 16, 2021 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2021 · Apt 3D

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Jan 25, 2021 · Apt 3D

    Close
  • Plumbing

    Radiator

    Jan 25, 2021 · Apt 3D

    Close
  • Unsanitary condition

    Mold

    Jan 25, 2021 · Apt 3D

    Close
  • Flooring/stairs

    Floor

    Jan 25, 2021 · Apt 3D

    Close
  • Door/window

    Window frame

    Jan 25, 2021 · Apt 3D

    Close
  • Water leak

    Slow leak

    Jan 25, 2021 · Apt 3D

    Close
  • Water leak

    Damp spot

    Jan 24, 2021 · Apt 3C

    Close
  • Plumbing

    Toilet

    Jan 24, 2021 · Apt 3C

    Close
  • Paint/plaster

    Wall

    Jan 24, 2021 · Apt 3C

    Close
  • Plumbing

    Basin/sink

    Jan 24, 2021 · Apt 3C

    Close
  • Door/window

    Window frame

    Jan 24, 2021 · Apt 3C

    Close
  • Water leak

    Damp spot

    Sep 11, 2018 · Apt 2B

    Close
  • Water leak

    Damp spot

    Jul 10, 2018 · Apt 2B

    Close
  • Plumbing

    Boiler

    Mar 12, 2018 · Apt 3A

    Close
  • Water leak

    Heavy flow

    Mar 12, 2018 · Apt 3A

    Close
  • Water leak

    Heavy flow

    Mar 12, 2018 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Feb 13, 2018 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Jan 17, 2018 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2018 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2017 · Apt 1D

    Close
  • Door/window

    Window frame

    Aug 16, 2017 · Apt 3C

    Close
  • General

    Bell/buzzer/intercom

    Aug 16, 2017 · Apt 3C

    Close
  • Door/window

    Window frame

    Aug 16, 2017 · Apt 3C

    Close
  • Plumbing

    Water supply

    Aug 16, 2017 · Apt 3C

    Close
  • Water leak

    Heavy flow

    Nov 30, 2016 · Apt 5B

    Close
  • Safety

    Outlet cover

    Nov 30, 2016 · Apt 5B

    Close
  • Electric

    Wiring

    Nov 30, 2016 · Apt 5B

    Close
  • Outside building

    Roofing

    Nov 30, 2016 · Apt 5B

    Close
  • Unsanitary condition

    Mold

    Aug 15, 2016 · Apt 3A

    Close
  • Door/window

    Door

    Jan 30, 2016 · Apt 5B

    Close
  • Door/window

    Door

    Oct 11, 2015 · Apt 5B

    Close
  • Paint/plaster

    Window/frame

    May 19, 2015 · Apt 2A

    Close
  • Paint/plaster

    Radiator

    May 19, 2015 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    May 13, 2015 · Apt 5C

    Close
  • Unsanitary condition

    Mold

    May 13, 2015 · Apt 5C

    Close
  • Paint/plaster

    Ceiling

    May 13, 2015 · Apt 3D

    Close
  • Paint/plaster

    Window/frame

    May 13, 2015 · Apt 3D

    Close
  • Paint/plaster

    Wall

    May 13, 2015 · Apt 3D

    Close
  • Unsanitary condition

    Mold

    May 13, 2015 · Apt 3D

    Close
  • Unsanitary condition

    Mold

    May 13, 2015 · Apt 3C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1914
Floors
6
Residential units
20
Building area
18,675 ft²
Lot area
5,233 ft²
Zoning
R6B
Community board
302
Council district
35
Block / lot
1980 / 48
Assessed value
$980,550
Landmark / historic district
Clinton Hill Historic District

HPD registration #317088, last renewed Jul 14, 2025.

Questions about 116 Cambridge Place

Who owns 116 Cambridge Place?

The owner of record in NYC Department of City Planning PLUTO data is Cambridge Hgts Hous Deve Fund Corp.

Does 116 Cambridge Place have violations?

Yes. NYC HPD has recorded 101 housing violations at this property.

Is 116 Cambridge Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 116 Cambridge Place built?

City records list 1914 as the year it was built.

How many apartments are in 116 Cambridge Place?

It has 20 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.