116 Cambridge Place
Brooklyn, NY 11238BBL 3-01980-0048Map
Owner of record: Cambridge Hgts Hous Deve Fund Corp
116 Cambridge Place is a walk-up apartment building built in 1914 in Brooklyn, 11238. It has 20 residential units across 6 floors. The owner of record is Cambridge Hgts Hous Deve Fund Corp. HPD has recorded 101 housing violations here, most recently on November 29, 2024. 46 of the 50 most recent violations are still open.
- HPD violations
- 101
- DOB violations
- 11
- ECB violations
- 0
- HPD complaints
- 100
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 101
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective upper sash spring balance at 1st window from north at east wall. in the 1st room from east at south located at apt 1d, 1st story, 1st apartment from west at north
Mar 7, 2023 · Apt 1D
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at south located at apt 3c, 3rd story, 2nd apartment from north at east
Feb 25, 2021 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east at south located at apt 3c, 3rd story, 2nd apartment from north at east
Feb 25, 2021 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective parquet floor tiles in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out - ANon-hazardous
Refit lower window sash 1st at east in the 1st room from east at north located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out - ANon-hazardous
Refit lower window sash 2nd at east in the 1st room from east at north located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Refit lower window sash 3rd at east in the 1st room from east at north located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out - ANon-hazardous
Refit lower window sash 1st at east in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out - ANon-hazardous
Refit lower window sash 2nd at east in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood baseboard molding at south wall in the 1st room from east at north located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood parquet floor tiles in the kitchen located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 17, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Feb 17, 2021
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east
Feb 17, 2021 · Apt 3D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 2b, 2nd story, 1st apartment from south at west
Sep 18, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 2b, 2nd story, 1st apartment from south at west
Sep 18, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at north located at apt 2b, 2nd story, 1st apartment from south at west
Jul 19, 2018 · Apt 2B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at north, the 4th room from east at south located at apt 3a, 3rd story, 1st apartment from south at west
Mar 16, 2018 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east at north located at apt 3a, 3rd story, 1st apartment from south at west
Mar 16, 2018 · Apt 3A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Mar 16, 2018 · Apt 3A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Mar 16, 2018 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Mar 16, 2018 · Apt 3A
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 27, 2017
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Dec 27, 2017
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Dec 27, 2017
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 3c, 3rd story, 2nd apartment from north at east
Aug 18, 2017 · Apt 3C
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 3c, 3rd story, 2nd apartment from north at east
Aug 18, 2017 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair the broken or defective and make operative the bell-buzzer / intercom system at east wall in the kitchen located at apt 3c, 3rd story, 2nd apartment from north at east
Aug 18, 2017 · Apt 3C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story
Jan 18, 2017
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective the fire retardant plaster ceiling at public hall, 5th story
Jan 18, 2017
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 5th story
Jan 18, 2017
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Aug 19, 2016 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st riser from west at north wall in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west
Aug 19, 2016 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ' chair rails at north wall, 1st door from east at south wall in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west
Aug 19, 2016 · Apt 3A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... .. 2nd closet from west at north wall ceiling in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west
Aug 19, 2016 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , 2nd closet from west at north wall wall, 2nd closet from west at north wall ceiling in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west
Aug 19, 2016 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from east at north located at apt 3a, 3rd story, 1st apartment from south at west
Aug 19, 2016 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west
Aug 19, 2016 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 3a, 3rd story, 1st apartment from south at west
Aug 19, 2016 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , 1st door frame from north at east wall in the 4th room from east at north located at apt 3a, 3rd story, 1st apartment from south at west
Aug 19, 2016 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , ceiling in the 4th room from east at north located at apt 3a, 3rd story, 1st apartment from south at west
Aug 19, 2016 · Apt 3A
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors fire proof self closing door. in the entrance located at apt 5b, 2nd story, 1st apartment from south at west
Feb 20, 2016 · Apt 5B
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors in the entrance located at apt 5b, 5th story, 1st apartment from south at west
Oct 24, 2015 · Apt 5B
Open — Nov sent out - ANon-hazardous
Refit door in the entrance located at apt 5b, 5th story, 1st apartment from south at west
Oct 24, 2015 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair the broken or defective door knob in the entrance located at apt 5b, 5th story, 1st apartment from south at west
Oct 24, 2015 · Apt 5B
Open — Nov sent out
DOB building violations · 11
- Immediate emergency anythingoptional
Erect 103' fence, 10' away from the wall, leaving 6ft wide passageway for fire egree
Oct 2, 2023
Dob violation - active - Construction other optional
A brick retaining wall with dimensions, 80 linear feet by 6 feet in height (view from north) and 23 linear feet by 9 feet in height (view from south), at rear yard, leaning inward. the out of plumbed earth retaining wall, caused by 2 feet diameter tree, planted on 195 st. james place rear yard, has a potential for collapse.
Sep 27, 2023
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Outside building
Roof door/hatch
Jun 15, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Feb 26, 2023 · Apt 1D
Close - Paint/plaster
Wall
Oct 12, 2021 · Apt 1A
Close - Flooring/stairs
Floor
Feb 16, 2021 · Apt 3D
Close - Flooring/stairs
Floor
Feb 16, 2021 · Apt 3D
Close - Door/window
Window frame
Feb 16, 2021 · Apt 3D
Close - Door/window
Door
Feb 16, 2021 · Apt 3D
Close - Plumbing
Steam pipe/riser
Feb 16, 2021 · Apt 3D
Close - Water leak
Heavy flow
Feb 16, 2021 · Apt 3D
Close - Heat/hot water
Apartment only
Jan 29, 2021 · Apt 3D
Close
Show 40 more ↓
- Paint/plaster
Wall
Jan 25, 2021 · Apt 3D
Close - Plumbing
Radiator
Jan 25, 2021 · Apt 3D
Close - Unsanitary condition
Mold
Jan 25, 2021 · Apt 3D
Close - Flooring/stairs
Floor
Jan 25, 2021 · Apt 3D
Close - Door/window
Window frame
Jan 25, 2021 · Apt 3D
Close - Water leak
Slow leak
Jan 25, 2021 · Apt 3D
Close - Water leak
Damp spot
Jan 24, 2021 · Apt 3C
Close - Plumbing
Toilet
Jan 24, 2021 · Apt 3C
Close - Paint/plaster
Wall
Jan 24, 2021 · Apt 3C
Close - Plumbing
Basin/sink
Jan 24, 2021 · Apt 3C
Close - Door/window
Window frame
Jan 24, 2021 · Apt 3C
Close - Water leak
Damp spot
Sep 11, 2018 · Apt 2B
Close - Water leak
Damp spot
Jul 10, 2018 · Apt 2B
Close - Plumbing
Boiler
Mar 12, 2018 · Apt 3A
Close - Water leak
Heavy flow
Mar 12, 2018 · Apt 3A
Close - Water leak
Heavy flow
Mar 12, 2018 · Apt 3A
Close - Heat/hot water
Entire building
Feb 13, 2018 · Apt 1D
Close - Heat/hot water
Entire building
Jan 17, 2018 · Apt 2B
Close - Heat/hot water
Entire building
Jan 16, 2018 · Apt 1C
Close - Heat/hot water
Entire building
Dec 26, 2017 · Apt 1D
Close - Door/window
Window frame
Aug 16, 2017 · Apt 3C
Close - General
Bell/buzzer/intercom
Aug 16, 2017 · Apt 3C
Close - Door/window
Window frame
Aug 16, 2017 · Apt 3C
Close - Plumbing
Water supply
Aug 16, 2017 · Apt 3C
Close - Water leak
Heavy flow
Nov 30, 2016 · Apt 5B
Close - Safety
Outlet cover
Nov 30, 2016 · Apt 5B
Close - Electric
Wiring
Nov 30, 2016 · Apt 5B
Close - Outside building
Roofing
Nov 30, 2016 · Apt 5B
Close - Unsanitary condition
Mold
Aug 15, 2016 · Apt 3A
Close - Door/window
Door
Jan 30, 2016 · Apt 5B
Close - Door/window
Door
Oct 11, 2015 · Apt 5B
Close - Paint/plaster
Window/frame
May 19, 2015 · Apt 2A
Close - Paint/plaster
Radiator
May 19, 2015 · Apt 2A
Close - Unsanitary condition
Mold
May 13, 2015 · Apt 5C
Close - Unsanitary condition
Mold
May 13, 2015 · Apt 5C
Close - Paint/plaster
Ceiling
May 13, 2015 · Apt 3D
Close - Paint/plaster
Window/frame
May 13, 2015 · Apt 3D
Close - Paint/plaster
Wall
May 13, 2015 · Apt 3D
Close - Unsanitary condition
Mold
May 13, 2015 · Apt 3D
Close - Unsanitary condition
Mold
May 13, 2015 · Apt 3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1914
- Floors
- 6
- Residential units
- 20
- Building area
- 18,675 ft²
- Lot area
- 5,233 ft²
- Zoning
- R6B
- Community board
- 302
- Council district
- 35
- Block / lot
- 1980 / 48
- Assessed value
- $980,550
- Landmark / historic district
- Clinton Hill Historic District
HPD registration #317088, last renewed Jul 14, 2025.
Questions about 116 Cambridge Place
Who owns 116 Cambridge Place?
The owner of record in NYC Department of City Planning PLUTO data is Cambridge Hgts Hous Deve Fund Corp.
Does 116 Cambridge Place have violations?
Yes. NYC HPD has recorded 101 housing violations at this property.
Is 116 Cambridge Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 116 Cambridge Place built?
City records list 1914 as the year it was built.
How many apartments are in 116 Cambridge Place?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.