roofy

348 Lafayette Avenue

Brooklyn, NY 11238BBL 3-01948-0018Map

Owner of record: 348 Lafayette Avenue LLC

348 Lafayette Avenue is a walk-up apartment building built in 1899 in Brooklyn, 11238. It has 3 residential units across 3 floors. The owner of record is 348 Lafayette Avenue LLC. HPD has recorded 56 housing violations here, most recently on August 4, 2026. 45 of the 50 most recent violations are still open.

HPD violations
56
DOB violations
1
ECB violations
0
HPD complaints
54

What to know

Concern
16 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 56

  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at front yard

    Aug 4, 2026

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 8, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    May 28, 2026 · Apt 3

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st room upper level from north located at apt 3 upper level, 3rd story, 1st apartment from west at north

    May 28, 2026 · Apt 3

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at wainscotting at north wall, 2nd window frame from west at north wall, 1st window frame from west at north wall, 3rd window frame from west at north wall, 1st fireplace from south at west wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from east at south

    Apr 22, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st fireplace from south at west wall in the 5th room from north at west located at apt 2, 2nd story, 1st apartment from east at south

    Apr 22, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at north wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from east at south

    Apr 22, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) wainscotting at north wall in the 1st room from north located at apt 1, 1st story, 1st apartment from east at south

    Apr 22, 2026 · Apt 1

    Open — Defect letter issued
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Apr 22, 2026 · Apt 2

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Apr 1, 2026 · Apt 2

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Apr 1, 2026 · Apt 2

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water exceeing the maximum allowable temperature of 130 degrees in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Apr 1, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jan 18, 2026 · Apt 2

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jan 18, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jan 18, 2026 · Apt 2

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Dec 19, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 19, 2025

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings that is missing

    Dec 19, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox that is missing at public hall, 1st story

    Dec 19, 2025

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor that is missing at public hall, 1st story

    Dec 19, 2025

    Open — Nov sent out
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Dec 19, 2025

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in wasteline at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Dec 19, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Dec 19, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Dec 19, 2025 · Apt 2

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Dec 19, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the 1st bathroom from north located at apt 2, 2nd story, 1st apartment from east at south

    Dec 19, 2025 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective locking device assemby at north vestibule door, at public hall, 1st story

    Sep 24, 2025

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 24, 2025

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ,missing accessable frame, at public hall, 1st story

    Sep 24, 2025

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings ,missing sign,

    Sep 24, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing sign, at public hall, 1st story

    Sep 24, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 24, 2025

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at the waste collections area, fresh rats droppings presented, court at north , section ''front''

    Sep 24, 2025

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west

    Sep 23, 2025 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective door lock in the vestibule door

    Sep 23, 2025

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats yard

    Sep 23, 2025

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Sep 23, 2025 · Apt 2

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at the south wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from south at west

    Sep 23, 2025 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective 1st and 2nd windows from north at east lower sash spring balance in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west

    Sep 23, 2025 · Apt 1

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west

    Sep 23, 2025 · Apt 1

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 10, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 10, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 22, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 23, 2023

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 14, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 25, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 25, 2022

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2021

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 9, 2021

    Closed — Violation dismissed

DOB building violations · 1

  • Unsafe buildings none

    Ub-unsafe buildings none

    May 19, 1998

    V%*-dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Paint/plaster

    Window/frame

    Jul 28, 2026 · Apt 1

    Close
  • Safety

    Window guard broken/missing

    Jul 28, 2026 · Apt 1

    Close
  • General

    Bell/buzzer/intercom

    Jul 28, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Jul 28, 2026 · Apt 1

    Close
  • Safety

    Window guard broken/missing

    Jul 11, 2026 · Apt APT1

    Close
  • General

    Bell/buzzer/intercom

    Jul 11, 2026 · Apt APT1

    Close
  • Paint/plaster

    Window/frame

    May 22, 2026 · Apt 3

    Close
  • Electric

    Lighting

    Apr 21, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Apr 21, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Apr 18, 2026 · Apt 2

    Close
Show 40 more ↓
  • Paint/plaster

    Window/frame

    Apr 14, 2026 · Apt APT1

    Close
  • Plumbing

    Water supply

    Mar 31, 2026 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Mar 31, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Mar 31, 2026 · Apt 2

    Close
  • Electric

    Lighting

    Mar 31, 2026 · Apt 2

    Close
  • Electric

    Power outage

    Feb 1, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Feb 1, 2026 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt 3

    Close
  • Safety

    Window guard broken/missing

    Feb 1, 2026 · Apt 3

    Close
  • Electric

    No lighting

    Jan 31, 2026 · Apt BLDG

    Close
  • Electric

    Wiring

    Jan 26, 2026 · Apt 2

    Close
  • Electric

    Wiring

    Jan 26, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2026 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jan 18, 2026 · Apt 3

    Close
  • Electric

    Power outage

    Jan 18, 2026 · Apt 3

    Close
  • Electric

    Power outage

    Jan 18, 2026 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 18, 2026 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Dec 19, 2025 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Dec 19, 2025 · Apt 2

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 17, 2025 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Dec 17, 2025 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Dec 17, 2025 · Apt 2

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 16, 2025 · Apt 1

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 16, 2025 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2025 · Apt 2

    Close
  • Paint/plaster

    Door/frame

    Sep 23, 2025 · Apt 3

    Close
  • Door/window

    Door

    Sep 22, 2025 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2025 · Apt 1

    Close
  • Safety

    Window guard broken/missing

    Sep 18, 2025 · Apt 1

    Close
  • Door/window

    Door

    Sep 18, 2025 · Apt 1

    Close
  • General

    Bell/buzzer/intercom

    Sep 18, 2025 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Sep 18, 2025 · Apt 1

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 18, 2025 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2025 · Apt 1

    Close
  • Door/window

    Door

    Sep 18, 2025 · Apt 2

    Close
  • General

    Ventilation system

    Sep 18, 2025 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Sep 18, 2025 · Apt 2

    Close
  • Door/window

    Window frame

    Sep 18, 2025 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2025 · Apt 1

    Close
  • Door/window

    Window frame

    Sep 18, 2025 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1899
Floors
3
Residential units
3
Building area
3,312 ft²
Lot area
1,875 ft²
Zoning
R6B
Community board
302
Council district
35
Block / lot
1948 / 18
Assessed value
$163,920
Landmark / historic district
No

HPD registration #366609, last renewed Oct 4, 2003.

Questions about 348 Lafayette Avenue

Who owns 348 Lafayette Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 348 Lafayette Avenue LLC.

Does 348 Lafayette Avenue have violations?

Yes. NYC HPD has recorded 56 housing violations at this property.

Is 348 Lafayette Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 348 Lafayette Avenue built?

City records list 1899 as the year it was built.

How many apartments are in 348 Lafayette Avenue?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.