648 Myrtle Avenue
Brooklyn, NY 11205BBL 3-01912-0034Map
Owner of record: 648 Myrtle Ave LLC
648 Myrtle Avenue is a mixed residential and retail building built in 1905 in Brooklyn, 11205. It has 4 residential units across 5 floors. The owner of record is 648 Myrtle Ave LLC. HPD has recorded 12 housing violations here, most recently on June 29, 2020.
- HPD violations
- 12
- DOB violations
- 20
- ECB violations
- 7
- HPD complaints
- 20
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 29, 2020
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 29, 2020
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items and strollers at public hall, 1st story
Jun 29, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 29, 2020
Closed — Violation closed - CImmediately hazardous
Replace with new the missing lower glass panel at building entrance door
Dec 9, 2012
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, apartment at south
Dec 9, 2012 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets hot water at bathtub in the bathroom located at apt 2l, 2nd story, apartment at north
Dec 9, 2012 · Apt 2L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the bathroom located at apt 2l, 2nd story, apartment at north
Dec 9, 2012 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... and mildew at ceiling and walls 36 square feet in the bathroom located at apt 2l, 2nd story, apartment at north
Dec 9, 2012 · Apt 2L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector that is defective in the entire apartment located at apt 2l, 2nd story, apartment at north
Dec 9, 2012 · Apt 2L
Closed — Violation closed
Show 2 more ↓
- BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2l, 2nd story, apartment at north
Dec 9, 2012 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door lock at cellar
Dec 9, 2012
Closed — Violation closed
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 10 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Construction other optional
Correct violating condition and file a certificate of correction
Jul 16, 2008
Dob violation - dismissed
ECB violations · 7
- Class - 2
Work w/o permit.atoi observed structure made out of 2x4 wood,frame aprox 10 ft width & 12 ft long & 10 ft high,attached to building at exp #1,as per dob no permit on file.for more information contact 212 393 66
Sep 26, 2023
Resolve - Class - 2
Work without a permit.note:a structure erected at exposure#1 approximately12ft long by 10ft width and 10ft high.the material used to erect the structure in plywood,2x4 wood and metal tracks.remedy:obtain permit
Oct 13, 2019 · Penalty $625
Active - Class - 2
Fail to comply w.comm order to file a certificate of correction w/dob.ecb viol # 34757169l issued 1/8/09. hearing status at time of inspection is overdue compliance with penalty imposed. violating condition rem
Oct 1, 2009 · Penalty $800
Resolve - Class - 2
Fail to comply w.comm order to file a certificate of correction with dob. ecb viol # 34573243y issued 7/6/07. hearing status at time of insis overdue compliance with penalty imposed violating condition remains
Oct 1, 2009 · Penalty $800
Resolve - Class - 2
Misc. vios at time of inspection masonry wall and or metal wire fence is erected at premises listed above is over 10high fence is on south end of lot fence has no parking active driveway painted on front
Jan 8, 2009
Resolve - Class - 3
Occupancy contrary to that allowed by the bldg dept records. rear yardof premises is being used & advertised as a private driveway. remedy: discontinue illegal use and/or amend bldg dept records.
Jan 8, 2009
Resolve - Non-hazardous
Work w/o permit. illegal work noted: at the south/east of property an approx 26'-6" curb cut w/ splays, shared w/ 158 franklin, created for vehicle access. also noted a 12'-6" high, 25 ft long metal property
Jul 6, 2007 · Penalty $500
Resolve
Complaints
- Appliance
Refrigerator
Mar 31, 2020 · Apt 2D
Close - Heating
Heat related
Dec 6, 2012 · Apt 2L
Close - Heating
Heat related
Apr 14, 2005 · Apt 2R
Close - Heating
Heat related
Feb 23, 2004 · Apt 2L
Close - Heating
Heat related
Feb 20, 2004 · Apt #2L
Close - Heating
Heat related
Feb 20, 2004 · Apt 2 L
Close - Heating
Heat related
Feb 18, 2004 · Apt 2L
Close - Heating
Heat related
Feb 16, 2004 · Apt 2L
Close - Heating
Heat related
Feb 11, 2004 · Apt 2L
Close - Heating
Heat related
Feb 10, 2004 · Apt 2L
Close
Show 10 more ↓
- Heating
Heat related
Feb 10, 2004 · Apt 2L
Close - Heating
Heat related
Feb 4, 2004 · Apt 2L
Close - Heating
Heat related
Feb 3, 2004 · Apt 2L
Close - Heating
Heat related
Feb 1, 2004 · Apt 2L
Close - Heating
Heat related
Jan 30, 2004 · Apt 2L
Close - Heating
Heat related
Jan 27, 2004 · Apt 2L
Close - Heating
Heat related
Jan 22, 2004 · Apt 2L
Close - Heating
Heat related
Jan 22, 2004 · Apt 2L
Close - Heating
Heat related
Jan 15, 2004 · Apt 2L
Close - Heating
Heat related
Jan 13, 2004 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1905
- Floors
- 5
- Residential units
- 4
- Building area
- 7,482 ft²
- Lot area
- 2,171 ft²
- Zoning
- R7A
- Community board
- 303
- Council district
- 33
- Block / lot
- 1912 / 34
- Assessed value
- $614,700
- Landmark / historic district
- No
HPD registration #366638, last renewed Jul 29, 2026.
Questions about 648 Myrtle Avenue
Who owns 648 Myrtle Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 648 Myrtle Ave LLC.
Does 648 Myrtle Avenue have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 648 Myrtle Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 648 Myrtle Avenue built?
City records list 1905 as the year it was built.
How many apartments are in 648 Myrtle Avenue?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.