161 Hall Street
Brooklyn, NY 11205BBL 3-01904-0053Map
Owner of record: 159 Willoughby I L.p.
161 Hall Street is a walk-up apartment building built in 1885 in Brooklyn, 11205. It has 12 residential units across 5 floors. The owner of record is 159 Willoughby I L.p.. HPD has recorded 232 housing violations here, most recently on May 4, 2026. 11 of the 50 most recent violations are still open.
- HPD violations
- 232
- DOB violations
- 47
- ECB violations
- 53
- HPD complaints
- 462
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 232
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing door in the private hallway located at apt 1c, 1st story, 1st apartment from north at east
Dec 30, 2023 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the kitchen located at apt 1c, 1st story, 1st apartment from north at east
Dec 30, 2023 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing radiator in the 1st room from north located at apt 1c, 1st story, 1st apartment from north at east
Dec 30, 2023 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east
Nov 22, 2023 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east
Nov 22, 2023 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 2c, 2nd story, 1st apartment from north at east
Nov 22, 2023 · Apt 2C
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles and household items at public hall, 1st story
Aug 15, 2023
Closed — Violation dismissed - BHazardous
Remove the illegal fastening hook and eye at vestibule door at public hall, 1st story
Aug 8, 2023
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Remove the illegal fastening consisting of two padlock and chain at gate providing egress from rear yard to street yard, 1st story
Apr 4, 2023
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at the 2nd story balcony of the stack at the front of the building at fire escape, 2nd story
Apr 4, 2023
Open — Violation will be reinspected - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at the 3rd story balcony of the stack at the rear of the buolding at fire escape, 3rd story
Apr 4, 2023
Open — Violation will be reinspected - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisti g of flower pot at the 4th story balcony at stack at the rear of the buolding at fire escape, 4th story
Apr 4, 2023
Open — Violation will be reinspected - CImmediately hazardous
Remove the illegal fastening key operated lock at entry door to room providing access to the fire escape in the 1st room from east at north located at apt 3b, 3rd story, 1st apartment from west at north
Apr 4, 2023 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north
Apr 4, 2023 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Apr 4, 2023 · Apt 3B
Open — Violation will be reinspected - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 4c, 4th story, 1st apartment from north at east
Apr 23, 2022 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the private hallway located at apt 4c, 4th story, 1st apartment from north at east
Apr 23, 2022 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 9, 2021
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at 1st and 2nd stories at public hall
Feb 12, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department enclosure around skylight at public hall, 4th story
Oct 26, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material around skylight enclosure at public hall, 4th story
Oct 26, 2020
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ..flower pots at 2nd story balcony at 1st fire escape from east at south
Oct 14, 2020
Closed — Violation closed - ANon-hazardous
Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also missing chain guard at door in the entrance located at apt 2b, 2nd story, 1st apartment from west at north
Sep 9, 2020 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 2nd and 3rd story balconies at south stack (front of building)
Sep 9, 2020
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 2nd and 4th story balconies at north stack (rear yard)
Sep 9, 2020
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of bicycle and wood furniture at public hall, 3rd story
Sep 9, 2020
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of ladder and bicycle at public hall, 2nd story
Sep 9, 2020
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of 5 bicycles at public hall, 1st story
Sep 9, 2020
Closed — Violation closed - ANon-hazardous
Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also missing chain guard at door in the entrance located at apt 4b, 4th story, 1st apartment from west at north
Sep 9, 2020 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to room with fire escape window in the 1st room from north at east located at apt 4b, 4th story, 1st apartment from west at north
Sep 9, 2020 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective heavy duty lockset at building entrance door at public hall, 1st story
Sep 9, 2020
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all components on all stories at north stack fire escape (rear yard)
Sep 9, 2020
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening device consisting of chain and padlock installed at east gate at fence enclosing north stack fire escape building rear
Sep 9, 2020
Closed — Violation closed - ANon-hazardous
Paint to the satisfaction of this department the exterior window frames and sashes wood frames on all stories at south exterior wall of building (front of building)
Sep 9, 2020
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing knob at door at building entrance , 1st story
Jul 16, 2020
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Jun 17, 2020
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint fire escape at front of the buildg
May 22, 2020
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 1b, 1st story, apartment at north
Jun 9, 2019 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperable located at apt 1b, 1st story, apartment at north
Mar 14, 2019 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1b, 1st story, apartment at north
Mar 14, 2019 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling at the southeast corner in the bathroom located at apt 1b, 1st story, apartment at north
Mar 14, 2019 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 1b, 1st story, apartment at north
Mar 14, 2019 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1b, 1st story, apartment at north
Mar 14, 2019 · Apt 1B
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at the ceiling at southeast corner approx. 6 sq. ft. in the bathroom located at apt 1b, 1st story, apartment at north
Mar 14, 2019 · Apt 1B
Closed — Violation closed - BHazardous
Properly secure the loose handrail at public hall stairs, 1st story
Dec 13, 2018
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of .. bicycles at floor at public hall, 1st story
Dec 13, 2018
Closed — Violation dismissed
DOB building violations · 47
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2024
Dob violation - dismissed - Construction other optional
Failure to maintain building in a code compliant manner. at time of inspection observed at exposure 2, at 4th floor, masonry bulging, degradation of mortar at windows, parapet leaning.
Dec 8, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Construction other optional
Special inspector, alberto roman, pe#95364 surrendered all filing privileges, therefore pursuant to ac 28-105.10.2. borough commissioner has ordered swo under application # 322017982.
Aug 28, 2022
Dob violation - dismissed - Construction other optional
Special inspector, alberto roman, pe#95364 surrendered all filing privileges, therefore pursuant to ac 28-105.10.2. borough commissioner has ordered swo under application # 322017982.
Aug 28, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 2, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 2, 2022
Dob violation - dismissed
Show 37 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 13, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 13, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 12, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 28, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 14, 2021
Dob violation - dismissed - Landmark none
Landmk-landmark none
Mar 11, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - dismissed - Construction other optional
Ftm bldg safe condn:extr walls state disrpr@exps 1&4,brwnstne elements spall@exp3,face brck@4fl lvl deter&bulg over rear yard of adj prop 157 willoughby.deter bulg brck@exp3 poses severe haz/risk could fall rear yrd adj prop.owner retn nys lic pe&dob reg contr to evalu entre bldg & rpr under prmt.file applic by 2/15/21.begn by 3/1/21.cmplet by 6/1/21
Jan 14, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - dismissed - Construction other optional
Failure to maintain building in a code compliant manner. observed at exposure 2, at 4th floor, masonry has bowed outward, also bricks above window has degradation of mortar and bricks do not lay plumb
Oct 16, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 24, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Landmark none
Landmk-landmark none
Nov 16, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Construction other optional
Circumstances beyond control due to circumstances beyond control fire damaged at entire bldg. all windows broken & missing on front & rear o f bldg
Mar 23, 2000
Dob violation - dismissed - Landmark none
Landmk-landmark none
Feb 29, 2000
Dob violation - dismissed - Landmark none
Landmk-landmark none
Feb 29, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Landmark none
Landmrk-landmark none
Apr 28, 1986
Dob violation - dismissed - Landmark none
Landmk-landmark none
Apr 28, 1986
Dob violation - dismissed
ECB violations · 53
- Class - 3
Peerless lc-08 boiler=laa permit expired w/out signoff+openings in boiler room doors+relief valves not piped down+mixing valve missing cold water thermal loop+combustible storage+chimney base missing cleanout;c
Sep 3, 2024 · Penalty $500
Active - Class - 1
At 4th floor level, at exposure 2, masonry wall has bulge between windows, also top of parapet wall is in disrepair., maintain exterior building wall
Dec 8, 2023
Resolve - Class - 1
Failure to maintain building in a code compliant manner masonry facade of four story building show some signs of bulging at top floor rear of building, repair and/replace
May 4, 2023
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35591796j issued on 08/28/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. for: filled a cert of correction or either related
Mar 1, 2022
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. at the time of inspection & observed at 4 sty facades missing masonry,broken stone on each floors in various locations spalling,delaminated on surface,on windows
Mar 1, 2022 · Penalty $6,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35561192l issued on 5/25/2021 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for decorative stones i
Dec 13, 2021 · Penalty $1,250
Resolve - Class - 1
Filed a certificate of correction or other related materials containing false statements.noted work to correct condition cited in nov#35561192l was completed on 8/2/2021.certificate of correction and statement
Dec 13, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to maintain building in code compliant manner.at time of inspection observed facade broken stone at exp #1 #2 loose bricks/missing pinting.remedy:repair building exterior walls.
Dec 2, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building walls or appurtenances.at the time of inspection and observed granite courses horizontally on each floor including silo also delaminated or deteriorated.window frames are peeling an
Nov 4, 2021
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35591796j issued on 08/28/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. filed a cert of correction falsley. remedy: comply
Oct 13, 2021
Resolve
Show 40 more ↓
- Class - 1
Failure to provide unobstructed passageway. noted: exp#3 at fire escape. the exit gate is locked w/a chain & lock preventing egress. remedy:comply with code.
Oct 13, 2021
Resolve - Class - 1
Failure to maintain bldg in code compliant manner: facade has broken stone/linestone which is crumbling. bricks need pointing exp#1 has brick sticking outward,out of place. remedy: comply with code.
Oct 13, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway. observed: at 1st fl basement access corridor obstructed by 5 bikes,& large cardboard box w/o enough space for circulation & evacuation in emergency case.
Sep 16, 2021
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. observed: 4 sty bldg w/bricks & terra cotta stone facades,wooden window frames,cornice at roof level. terra cotta stone w/severe condition of deterioration wear
Sep 16, 2021
Resolve - Class - 1
Failure to maintain bdlg walls or appurtenances. noted: at exp#1&4 brick facade missing mortar throughout. wood cornice shows disrepair w/holes at various locations exp#4 cracks at window sills. photo taken.
Aug 28, 2021
Resolve - Class - 1
Filed cert of correction or other related materials contained materialfalse statements. noted: respondent filed cert of correction on 01/6/21 & accepted by the bldg dept for nov#39030558j. at the time of inspec
Aug 28, 2021
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: at rear at exp#3,at 4th fl fire escape is obstructed by planters. remedy: remove obstruction. photo taken.
Aug 28, 2021
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances-noted:at exp #4 and #1 window sill ledges cracked and chipping.photo taken.remedy:maintain exterior wall.
Aug 12, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances atoi&observed,@exp1&4 decorative granite b/w bricks show sign of spalling,chipped,missing,windowsill ledge cracks&spalling maintain exterior bldg walls.
Jul 14, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway atoi&observed,4 (ilegible) bikes on 1fl entrance hallway (illegible) access to cellar for exit/entrance (pics) remove obstruction
Jul 14, 2021
Resolve - Class - 1
Failure to maintain bldg wall(s) or appurtenances.noted:atoi,observed@exp2 (left side) rear@4fl level¶pet wall:have severe bulging b/w windows&several areas on left&right side.top right corner has bricks w/
Jun 16, 2021 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v39030558j issued10/16/20&to file c/c pursuant to28-201.1&1rcny102-01.failure to maintain bldg walls or [email protected] w/commissioner's o
Jun 16, 2021
Resolve - Class - 1
Filed c/c or other related materials containing materials false statement(s).noted:respondent filed c/c on1/6/21 for nov39030558j.upon insp,observed conditions which described as having been corrected cont to e
Jun 16, 2021
Resolve - Class - 1
Failure to maintain building walls or appurtenances.note at all exposed sides of building.the exterior masonry and wood cornice shows disrepair with chipped missing brownstone.open portions in cornice in rear o
May 28, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway:noted:on 1fl,there are@least3 bikes blocking egress.comply w/code.
May 25, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to maintain bldg wall(s) &/or appurtenances.noted:decorative stones 1-3fl levels breaking up&in danger of pieces falling below.comply w/code.
May 25, 2021 · Penalty $6,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35546479n issued on 1/13/2021 and to file a certificate of correction pursuan to 28-201.1 and 1rcny 102-01.for missing bricks at ex
Mar 24, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway.note:@time of insp,found accumulation of storage of bicycle stored up@1stfl in public hallway as well as plastic bags stored in hallway.@2,3,&4fls there are stora
Feb 10, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building walls or appurtenances.noted:observed at exposure#1 and 4.around the window and on the left side next to the stairs at exp1 the wall at the bottom is loose and turning into sand.at
Feb 4, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building walls and/or appurtenances.expo1,2,3 mor/er missing in brick work throughout bricks are loose and in danger of falling.remedy:comply with code.
Jan 13, 2021 · Penalty $6,250
Resolve - Class - 1
At exp 1 and 2 brownstone around stairs and wall inlay is in an advanced stage of deterioration turning into sand can be seen by the stairs flaking away also under windows sills and inlays between bricks on eac
Dec 9, 2020 · Penalty $2,500
Resolve - Class - 1
At exposure 2, at 4th floor, masonry wall at front side window has bowed outward,also noted masonry above window has degradation of mortar and bricks also out of plumb, also noted parapet above window appears t
Oct 16, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to maintain. landmark building with defects throughout the exterior. building must be maintained in code compliant manner. remedy: maintain building
Oct 13, 2020 · Penalty $625
Resolve - Class - 1
Tampered with removed or defaced a written posted stop work order. @time of inspection, observed a stop work order. @time of inspection, observed a stop work order sticker removed from the main door.rem: comply
Jul 25, 2019
Resolve - Class - 1
Work w/o a permit.observed renovation of cellar space of an occupied multiple dwelling with the creation of approx.15 rooms,with new non-load bearing partition walls,including two 2pc bathrooms,laundry area,rec
Jul 22, 2019 · Penalty $2,500
Resolve - Class - 1
Work w/o electrical permit.observed new electric work in cellar & in rear of bld.new bx cable runs through cellar for new receptacles,lighting,switches & 12 new air handlers.in rear,there are new electric cut-o
Jul 22, 2019
Resolve - Class - 1
Work w/o a permit.(plumbing & mechanical).in cellar,observed new waterlines for 2 laundry machines & new gas lines for dryers.also,observed new hvac system(split ductless)with 2 new condensers in rear yard & 12
Jul 22, 2019
Resolve - Class - 1
Failure to maintain bld. in code compliant manner.no fire stopping pere bc 710.3;27-345.in cellar space,i observed the removal of wire lath,fire proof material from the ceiling of the cellar,exposing wood joist
Jul 22, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35248815j issued on 08-04-17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner. note all cei
Jun 23, 2018 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35244815j issued on 08/04/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for damage ceiling throu
May 19, 2018 · Penalty $625
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35244815j issued on 8/4/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for water damage to plaster & lath throughout all floors.
Apr 7, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/viola tion #35244815j issued on 08/04/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny102-01 failure to maintain building
Feb 5, 2018 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35244815j issued on 08/04/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for failure to maintain bldg in code com
Oct 30, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in sum/vio#35244815j issued on 08/04/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Sep 13, 2017 · Penalty $800
Resolve - Class - 1
Failure to maintain: noted: at apt ceilings throughout all floors water damage evident to plaster & lath of which sections fell & remaining sections were removed by fdny conditions also evident in public hallwa
Aug 4, 2017 · Penalty $1,000
Resolve - Class - 2
Fail to maintain bldg noted found interior access stair to cellar missing/removed & no fall protection in place,boiler rm @ cellar level is not protected w/a fire rated enclosure.all cellar wood joists are expo
Jun 17, 2014
Resolve - Class - 1
Failure to comply with comm order to obtain a permit per violation3474045n for replacing boiler, firch way sealed w/ cinder blocks etc without a permit. rem: correct violation 34740405n
Jun 30, 2009 · Penalty $8,000
Resolve - Class - 1
Work w.o permit. illegal work noted: boiler found to be replaced w/newone & firch way sealed w/cinder blocks to enclosed boiler w/mechanicalduct system installed w/thru window at front facade for fai. full heig
Dec 2, 2008 · Penalty $1,600
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements defects noted at cellar level found with the storage of const material debris combustible lumber joists et al at approx 4 cubic yards
Dec 2, 2008
Resolve - Hazardous
Exit passageway total obstruction.side/rear gate leading from fire escape egress is obstructed by building trash.gate leads to "safe area" (street) & occupants cannot get to area.remedy:remove all garbage forth
Jan 29, 2005 · Penalty $480
Resolve
Complaints
- General
Signage missing
Jul 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 16, 2024 · Apt 1C
Close - Plumbing
Radiator
Jan 16, 2024 · Apt 1C
Close - Electric
Power outage
Jan 16, 2024 · Apt 1C
Close - Electric
Wiring
Dec 26, 2023 · Apt 3C
Close - Electric
Power outage
Dec 26, 2023 · Apt 3C
Close - Door/window
Door
Dec 26, 2023 · Apt 1C
Close - Safety
Window guard broken/missing
Dec 26, 2023 · Apt 1C
Close - Water leak
Slow leak
Dec 26, 2023 · Apt 1C
Close
Show 40 more ↓
- Electric
Outlet/switch
Dec 26, 2023 · Apt 1C
Close - Plumbing
Radiator
Dec 26, 2023 · Apt 1C
Close - Heat/hot water
Apartment only
Nov 29, 2023 · Apt 2C
Close - Electric
Power outage
Nov 28, 2023 · Apt 1C
Close - Heat/hot water
Apartment only
Nov 28, 2023 · Apt 1C
Close - Heat/hot water
Apartment only
Nov 21, 2023 · Apt 2C
Close - Paint/plaster
Ceiling
Oct 25, 2023 · Apt 1B
Close - Unsanitary condition
Mold
Oct 25, 2023 · Apt 1B
Close - Paint/plaster
Wall
Oct 25, 2023 · Apt 1B
Close - Unsanitary condition
Pests
Sep 2, 2023 · Apt 1B
Close - Unsanitary condition
Pests
Sep 2, 2023 · Apt 1B
Close - Unsanitary condition
Pests
Apr 14, 2023 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Apr 7, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 4, 2023 · Apt 3B
Close - Unsanitary condition
Pests
Apr 4, 2023 · Apt 3B
Close - Paint/plaster
Ceiling
Nov 18, 2022 · Apt 3B
Close - Unsanitary condition
Pests
Nov 18, 2022 · Apt 3B
Close - Water leak
Damp spot
Oct 5, 2022 · Apt 3C
Close - Paint/plaster
Ceiling
Apr 20, 2022 · Apt 4C
Close - Paint/plaster
Wall
Apr 20, 2022 · Apt 4C
Close - Unsanitary condition
Mold
Apr 20, 2022 · Apt 4C
Close - Appliance
Electric/gas range
Jan 12, 2022 · Apt 4B
Close - Plumbing
Water supply
Nov 30, 2021 · Apt 4B
Close - Heat/hot water
Entire building
Nov 30, 2021 · Apt 4B
Close - Heat/hot water
Entire building
Nov 30, 2021 · Apt 3A
Close - Heat/hot water
Entire building
Nov 29, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2021 · Apt 3A
Close - Heat/hot water
Apartment only
Nov 16, 2021 · Apt APT3C
Close - Heat/hot water
Entire building
Nov 15, 2021 · Apt 4B
Close - Heat/hot water
Entire building
Nov 15, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2021 · Apt 2C
Close - Heat/hot water
Entire building
Nov 12, 2021 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 26, 2021 · Apt 4C
Close - Electric
Outlet/switch
Oct 26, 2021 · Apt 4C
Close - Water leak
Slow leak
Oct 26, 2021 · Apt 4C
Close - Appliance
Electric/gas range
Oct 26, 2021 · Apt 4C
Close - Flooring/stairs
Floor
Oct 26, 2021 · Apt 4C
Close - Heat/hot water
Apartment only
Aug 21, 2021 · Apt 3A
Close - Heat/hot water
Entire building
Feb 10, 2021 · Apt 2C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1885
- Floors
- 5
- Residential units
- 12
- Building area
- 16,000 ft²
- Lot area
- 4,400 ft²
- Zoning
- R6B
- Community board
- 302
- Council district
- 35
- Block / lot
- 1904 / 53
- Assessed value
- $683,100
- Landmark / historic district
- Clinton Hill Historic District
HPD registration #320919, last renewed Jul 21, 2025.
Questions about 161 Hall Street
Who owns 161 Hall Street?
The owner of record in NYC Department of City Planning PLUTO data is 159 Willoughby I L.p..
Does 161 Hall Street have violations?
Yes. NYC HPD has recorded 232 housing violations at this property.
Is 161 Hall Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 161 Hall Street built?
City records list 1885 as the year it was built.
How many apartments are in 161 Hall Street?
It has 12 residential units and 13 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.