92 Emerson Place
Brooklyn, NY 11205BBL 3-01894-0043Map
Owner of record: Emerson Office LLC
92 Emerson Place is an office building built in 2018 in Brooklyn, 11205. The owner of record is Emerson Office LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 6
- ECB violations
- 22
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 6
- Construction other optional
Additional information-reguarding job#b00403458-i1 for 92 emerson pl, bk. submit signed and sealed copies of all tr1 special inspection reports for struct steel(welding, detail high strength bolt)structural cold form steel, masonry and struct stability existing bldgs with associated photographs. remedy:complyw/code. submit material to ceu
Mar 16, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 13, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Construction other optional
Borough commissioner ordered all work stopped for job # 321242160 due to revocation of filing privileges of applicant on record
Mar 14, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 7, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 7, 2016
Dob violation - dismissed
ECB violations · 22
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips)report documenting the conditions of psid#b0000
Oct 1, 2024 · Penalty $625
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations.at time of inspection premises under permit#b00403458-i1-stfor enlargement vertical observed metal rod approx 8x34 has fallen fro
Mar 10, 2021 · Penalty $5,000
Active - Class - 1
Work without permit. at time of insp observed a 4 story building has been enlarged creating a 5th fl. consisting of structural steel members approximately 1/2" steel. no permits. also note: construction materia
Mar 10, 2021
Resolve - Class - 1
3301.6.1 work not according to design drawings. at time of inspectionon an active construction site, notice workers working in an elevator shaft using a platform when design drawings were requested for the pla
Apr 8, 2019
Resolve - Class - 2
Bc3309.10 no roof protection. at time of inspection observed that thebulkhead was not completed and there was no roof protection for adjoi ning proeprty at exp2 as required by code. rmdy: comply with code.
Dec 12, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to safeguard all persons and property affected.by constructionoperations.at time of inspection observed cracks at floor on the adjoining property as a result of construction activity at exposure #4.the
Dec 11, 2018
Resolve - Class - 2
Bc3301.2 no overhead protection. at time of inspection observed that there is no overhead protection at exposure #1 from the gate to the bldentrance as required by code. rem: comply with code.
Dec 3, 2018
Resolve - Class - 1
Bc3303.3/no dot permit.at time of inspection observed that the gc stored construction material at the street without dot permit as required by code.rem;comply with code.
Dec 3, 2018
Resolve - Class - 2
Bc3301.2/inadequate guardrails.at time of inspection observed that theguardrails were inadequate and gc failed to maintained them at 3rd floor set back as required by code.rem:comply with code.
Dec 3, 2018
Resolve - Class - 2
No fence viewing panels.at time of inspection observed that the construction fence has no viewing panel as required by code.rem:comply with code.
Dec 3, 2018
Resolve
Show 12 more ↓
- Class - 1
Bc3307.4/no warning sign.at time of inspection observed that there is no warning sign and traffic barricade to protect the public from vehicles at street as required by code.rem;comply with code.
Dec 3, 2018
Resolve - Class - 1
Bc3303.4.1/failure to maintain sidewalk;at time of inspection observedthat the sidewalk in front of the jobsite severly broken creating a tripping hazard to the pedestrian.rem:maintain sidewalk.
Dec 3, 2018 · Penalty $625
Resolve - Class - 1
Bc3303.3/no dot permit.at time of inspection observed that there is nodot permit for encroaching portion of the sidewalk inside the jobsite fence as required by code.rem:comply with code.
Dec 3, 2018
Resolve - Class - 1
Respondent failed to have a lift director on site as required at time of inspection respodent was unable to provide a lift director for the days crane operations. the cd12 designated ligy director moises robles
May 17, 2018 · Penalty $10,000
Resolve - Class - 1
Failed to have a lift director on site as required. respondent willing& knowing allowed crane operations to be performed w/o a lift director on site. while steel i-beams were being erected the cd12 designated
May 17, 2018 · Penalty $10,000
Resolve - Class - 1
Failed to maintain or provide documentation on site as required. respondent willing & knowing allowed crane operations to be performed w/o having the required lift director daily log onsite. before operations
May 17, 2018 · Penalty $5,000
Resolve - Class - 1
Respondent failed to maintain or provide documentation on site as required at time of inspection no one onsite could provide the required lift director signed daily logs,wthe necessary components for the days
May 17, 2018 · Penalty $1,250
Resolve - Class - 1
No fire watch. at time of inspection observe an active construction site with welding work in progress. during inspection noted that therewas no fire watch as required by code. rmdy: comply with code.
Feb 5, 2018 · Penalty $400
Resolve - Class - 2
Failure to provide approved plans at hte jobsite at time of inspectionat time of inspection observed an active construction site with welding work in progress. during inspection i requested for a full set of
Feb 5, 2018
Resolve - Class - 1
28-407.1 no welder license. at time of inspection observed an activeconstruction site with welding work in progress. during inspection ob served a 2 welder welding the stair for the 2nd floor and the other we
Feb 5, 2018 · Penalty $400
Resolve - Class - 1
Work w/out a permit. @ time of insp it was observed that work exceededthe alteration 1 permit. it was observed that the bldg was demo at allexposure. all exterior wall was removed down to grade, only a small se
Jun 8, 2016
Resolve - Class - 1
Failure to notify dob w/in 24-48 hours of the start of excavation. @ time of insp it was observed that there was no notification on file & excavation operation had started. rem: officially notify dob by calling
Jun 8, 2016
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O2)
- Year built
- 2018
- Floors
- 4
- Residential units
- —
- Building area
- 10,205 ft²
- Lot area
- 3,500 ft²
- Zoning
- M1-1
- Community board
- 302
- Council district
- 35
- Block / lot
- 1894 / 43
- Assessed value
- $1,090,350
- Landmark / historic district
- No
Questions about 92 Emerson Place
Who owns 92 Emerson Place?
The owner of record in NYC Department of City Planning PLUTO data is Emerson Office LLC.
Does 92 Emerson Place have violations?
NYC HPD has no housing violations on record for this property.
Is 92 Emerson Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 92 Emerson Place built?
City records list 2018 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.