133 Mac Donough Street
Brooklyn, NY 11216BBL 3-01852-0049Map
Owner of record: 133 Macdonough Street HDFC
133 Mac Donough Street is a walk-up apartment building built in 1903 in Brooklyn, 11216. It has 8 residential units across 4 floors. The owner of record is 133 Macdonough Street HDFC. HPD has recorded 1,155 housing violations here, most recently on September 21, 2026. 39 of the 50 most recent violations are still open.
- HPD violations
- 1,155
- DOB violations
- 26
- ECB violations
- 10
- HPD complaints
- 564
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,155
- CImmediately hazardous
Properly repair or replace the broken or defective glass at building entrance door at public hall, 1st story
Sep 21, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock mechanism at building entrance door at public hall, 1st story
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 1r, 1st story, 2nd apartment from west at north
Apr 6, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock at apartment entrance door in the entrance located at apt 1r, 1st story, 2nd apartment from west at north
Apr 6, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in clogged waste line at wash basin in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Feb 27, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Feb 27, 2026 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Feb 27, 2026 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective gauge at boiler at boiler room
Feb 19, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective coils at boiler at boiler room
Feb 19, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at basement at basement
Feb 19, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches at basement
Feb 19, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats at basement
Feb 19, 2026
Open — Nov sent out - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the basement at basement
Feb 19, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective paving uneven concrete center of cellar approx. 5 sq. ft. at basement
Feb 19, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 19, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at 1st story public hall at public hall, 1st story
Feb 19, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 1st story
Feb 19, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Feb 19, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Feb 19, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Feb 19, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 19, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Feb 19, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Feb 18, 2026 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective cold radiator in all rooms in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Feb 12, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective air release valve at supply pipe at east south wall at basement
Feb 12, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jan 30, 2026 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jan 21, 2026 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jan 13, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story, 2nd apartment from west at north
Jan 5, 2026 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1r, 1st story, 2nd apartment from west at north
Jan 5, 2026 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in wastepipe at wash basin in the bathroom located at apt 1r, 1st story, 2nd apartment from west at north
Jan 5, 2026 · Apt 1R
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations device missing in the entire apartment located at apt 1r, 1st story, 2nd apartment from west at north
Jan 5, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules device missing in the entire apartment located at apt 1r, 1st story, 2nd apartment from west at north
Jan 5, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 1r, 1st story, 2nd apartment from west at north
Jan 5, 2026 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1r, 1st story, 2nd apartment from west at north
Jan 5, 2026 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 31, 2025 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 31, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 31, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Dec 24, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Dec 24, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 24, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at the building entrance door , 1st story
Dec 24, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door hinges at public hall, 1st story
Dec 24, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door hinges , 1st story
Dec 24, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 24, 2025
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Dec 24, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Dec 24, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Dec 24, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Dec 24, 2025
Open — Nov sent out
DOB building violations · 26
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active
Show 16 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Landmark none
Landmrk-landmark none
Apr 1, 1986
Dob violation - dismissed - Landmark none
Landmk-landmark none
Apr 1, 1986
Dob violation - active
ECB violations · 10
- Class - 3
Hb smith boiler has water leaking onto the boiler flue from a broken waste pipe+there is hot water continually running in the building;correct violation+submit certificate of correction
Mar 27, 2026 · Penalty $500
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons # 39074910y., file a certificate of correction
Mar 11, 2026 · Penalty $6,250
Active - Class - 1
At exposure #1 building facade piece of stone missing, and one piece displaced., maintain exterior building wall
Dec 1, 2022 · Penalty $12,500
Active - Class - 2
As per hmc-27-2033. no sign posted in conspicuous location with available contact information for person with access to boiler/heating equipment. correct all violating conditions and submit a certificate of cor
Apr 5, 2022 · Penalty $3,125
Active - Class - 2
Failure to mantain, boiler not working. get boiler repaired
Apr 1, 2022 · Penalty $3,125
Active - Class - 2
Heat timer defective/flame defect ýon/off¨ condition;correct violation and submit the certificate of correction
Jan 20, 2022 · Penalty $3,125
Active - Class - 2
Boiler not starting automatically for heat and hot waterýoil boiler service required¨;correct violation and submit the certificate of correction
Dec 22, 2021 · Penalty $3,125
Active - Class - 2
Domestic relief valve leaking, oil leaks. repair leaks
May 8, 2019 · Penalty $3,125
Active - Class - 2
50 found h.b. smith boiler 722,000 btus model 19he-05 installed and operating on oil only. oil tank empty and boiler unable to operate. correct violating conditions and submit a certificate of correction.
Jan 2, 2018 · Penalty $2,500
Active - Class - 2
As per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.
Apr 7, 2017 · Penalty $2,500
Active
Complaints
- Door/window
Door
Jun 15, 2026 · Apt 2L
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt 2R
Close - Plumbing
Water supply
Feb 25, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
Feb 20, 2026 · Apt 2L
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt 2L
Close - Plumbing
Radiator
Feb 16, 2026 · Apt 2L
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt 2L
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt BASEME
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 12, 2026 · Apt 2L
Close - Heat/hot water
Entire building
Jan 3, 2026 · Apt 1R
Close - Heat/hot water
Apartment only
Dec 30, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt 2L
Close - Heat/hot water
Apartment only
Oct 31, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Oct 21, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt 4L
Close - Heat/hot water
Entire building
Oct 15, 2025 · Apt 2L
Close - Door/window
Window frame
Oct 10, 2025 · Apt 2L
Close - Heat/hot water
Apartment only
Oct 10, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Oct 5, 2025 · Apt 2C
Close - Electric
No lighting
Apr 10, 2024 · Apt 4R
Close - Electric
Lighting
Apr 5, 2024 · Apt 2L
Close - Electric
No lighting
Apr 5, 2024 · Apt 2L
Close - Plumbing
Water supply
Jan 3, 2024 · Apt 2L
Close - Electric
No lighting
Jan 3, 2024 · Apt 2L
Close - Plumbing
Sewer
Jul 6, 2023 · Apt 2L
Close - Door/window
Door
May 4, 2023 · Apt 1R
Close - Paint/plaster
Ceiling
May 2, 2023 · Apt 4L
Close - Heat/hot water
Entire building
Feb 22, 2023 · Apt 4R
Close - Heat/hot water
Entire building
Feb 18, 2023 · Apt 4R
Close - Unsanitary condition
Garbage/recycling storage
Feb 18, 2023 · Apt 4R
Close - Door/window
Window pane
Feb 17, 2023 · Apt 4R
Close - Heat/hot water
Entire building
Feb 17, 2023 · Apt 4R
Close - Paint/plaster
Ceiling
Feb 17, 2023 · Apt 4R
Close - Heat/hot water
Entire building
Feb 17, 2023 · Apt 2L
Close - Unsanitary condition
Pests
Feb 17, 2023 · Apt 4R
Close - Paint/plaster
Wall
Feb 17, 2023 · Apt 4R
Close - Safety
Carbon monoxide detector
Sep 28, 2022 · Apt 4R
Close - General
Bell/buzzer/intercom
Sep 28, 2022 · Apt 4R
Close - Door/window
Door
Sep 28, 2022 · Apt 4R
Close - Unsanitary condition
Pests
Sep 28, 2022 · Apt 4R
Close - Appliance
Refrigerator
Sep 28, 2022 · Apt 4R
Close - Door/window
Door
Sep 28, 2022 · Apt 4R
Close - Door/window
Window frame
Sep 28, 2022 · Apt 4R
Close - Appliance
Electric/gas range
Sep 28, 2022 · Apt 4R
Close - Door/window
Window pane
Sep 28, 2022 · Apt 4R
Close - Unsanitary condition
Mold
Sep 28, 2022 · Apt 4R
Close - Unsanitary condition
Pests
Sep 28, 2022 · Apt 4R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1903
- Floors
- 4
- Residential units
- 8
- Building area
- 9,500 ft²
- Lot area
- 2,700 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1852 / 49
- Assessed value
- $713,700
- Landmark / historic district
- Stuyvesant Heights Historic District
HPD registration #322088, last renewed Feb 14, 2008.
Questions about 133 Mac Donough Street
Who owns 133 Mac Donough Street?
The owner of record in NYC Department of City Planning PLUTO data is 133 Macdonough Street HDFC.
Does 133 Mac Donough Street have violations?
Yes. NYC HPD has recorded 1,155 housing violations at this property.
Is 133 Mac Donough Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 133 Mac Donough Street built?
City records list 1903 as the year it was built.
How many apartments are in 133 Mac Donough Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.