roofy

94 Macon Street

Brooklyn, NY 11216BBL 3-01850-0015Map

Owner of record: Homeliv Development LLC

94 Macon Street is a walk-up apartment building built in 1882 in Brooklyn, 11216. It has 3 residential units across 3 floors. The owner of record is Homeliv Development LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
16
ECB violations
12
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 16

  • Construction other optional

    Failure to maintain property in a safe/code-compliant manner.3-story bldg w/deteriorated brick walls, improperly anchored floors,&inadequat bracing.temp stabilzatn done;non-compliant elements remain. remedy: comply w code; inspect site biweekly4structural changes 'til compliant . rpts by nys pe.notify dob of significant movement

    Jun 28, 2024

    Dob violation - active
  • Construction other optional

    Fail2meet min.reqs(ac28-101.2)set in bc 1814.1 for suportofexcavation design. bc 1814.1 mandates engineer 4 protectn,underpinning sheeting & bracing. applicant doesn't meet, as registered architect. remedy: comply w code,design applicnt 4suport of excavtn to withdraw & be replaced by qualifid pe.submit replacemnt docs by 4/5/24

    Mar 22, 2024

    Dob violation - dismissed
  • Construction other optional

    Emergncy wrk:3-story wood/steel joist bldg w.deteriorated &unstable ex terior walls, compromisd lateral system, dangr of further.collapse remedy: comply w code. retain nys pe, cs &gc.stabilze ext.walls,safe grd site f/t pe,cs suprvsn rqd.submt docs & rpts

    Mar 22, 2024

    Dob violation - dismissed
  • Construction other optional

    Fail2maintain prop in safe,code compliant manner.3-sty bldg w.deterior td exterior brick masonry walls improperly anchored to fls & lacking adequate temporary bracing. remedy: hire nys pe to evaluate walls: condition & stability.document hazards + resolution.submit rprt 2 dob by 03/27/24

    Mar 22, 2024

    Dob violation - dismissed
  • Construction other optional

    Vio24-50337

    Mar 22, 2024

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Jun 21, 2023

    Dob violation - active
  • Immediate emergency anythingoptional

    1: immediately place a shed on the exp 2 - exp 3 corner approx 15' eac h side . 2. immediately seal the basement, parlour( first floor ) and door openings

    Apr 21, 2022

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Apr 13, 2022

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Apr 13, 2022

    Dob violation - active
  • Immediate emergency anythingoptional

    Immediately secure the parlor floor and the basement door with chains and or sheets of ply and resecure the existing tight board fence along macon avenue

    Aug 5, 2021

    Dob violation - dismissed
Show 6 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 6, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 11, 2020

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    Oct 22, 2020

    V%-dob violation
  • Construction other optional

    Ftm:resid bldg in state of disrpair.portico & frnt collapsed,cornce of frnt wall partly missng.stucco of east wall spallng and missng.crnr of south and east wall deterior & brick has fallen.bulging rear wall and leaning parapet.ownr to engage nyspe and contractor to repair building under permit.file for permit by 01/01/2021.start by 02/01/2021

    Oct 22, 2020

    Dob violation - active
  • Immediate emergency anythingoptional

    Install an approximate total of 20 linear feet of tight board fence to prevent unauthorized access and safeguard the public

    Oct 20, 2020

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in a code compliant manner at time of inspection it was observed that exterior wall was in state of disrepair with missing loose dislodge brick at exposure 2 and 3 corner in addition with portico in disrepair with loose leaning and missing section

    Aug 12, 2020

    Dob violation - active

ECB violations · 12

  • Class - 2

    At the time of inspection on an active job site, i observed sidewalk shed at exposure 1 and was not conform to plans as per plans eq- -102.00 page 2 show that cross bracing between vertical members shall be

    Aug 31, 2026 · Penalty $1,250

    Active
  • Class - 2

    At the time of inspection on an active job site , i observed sidewalk shed at exposure 1 and on top of shed was consisting of scaffold parts and netting as per bc 3307.6.4.2.2 plans did not show a designated ar

    Aug 31, 2026 · Penalty $2,400

    Active
  • Class - 2

    1215pm observed construction fence door open hazard created unauthorize access to permitted construction site.announcement made followed by banging of open door and fence to no response.gc was contacted,929-398

    Mar 4, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    At time of responding complaint observed: construction fence installed at expo# 1 upon reviewing on department record it appear permit # b00425859-i1-fn, was expired on 11/17/2021. creating a violating conditio

    May 5, 2023

    Resolve
  • Class - 2

    28-105.9 work w/o permit (const plywood fence permit expired).as noted:atoi 3styb closed.const plywood fence installed@exp1,observed const plywood fence permit has expired11/17/21 permit b00425859-i1-fn.comply

    Jun 2, 2022

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order contained in summons/violation # 35474975m issued on 10/16/2020 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01., file a certificate of cor

    Sep 7, 2021

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner noted at exp #1 wood frame cornice/awning above entrance door has rotted detached and fall to entry staircase repair & or replace

    Mar 22, 2021

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner exp #1 woodframe cornice in disrepair and rotted entrance door also in disrepair comply with code

    Mar 22, 2021

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order contained in summons/violation #35475467k issued on 8/12/20 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.for failure to maintain bldg in

    Nov 19, 2020

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner:@exp2 entire facade (3sty) show signs of plaster masonry crumbled/spalling,exposed brick in numerous locations @exp1.subfascia pulled away from bldg,overhead ro

    Nov 19, 2020

    Resolve
Show 2 more ↓
  • Class - 1

    Failure to maintain exterior building walls or appurtenances. at exposure 1 the wood frame cornice/awning above entrance door has rotted,detached,and fall to entry staircase and front yard due to exposure and n

    Oct 16, 2020 · Penalty $12,500

    Active
  • Class - 1

    Failure to maintain building in code compliant manner manner at the tiem fo inspection it was observed that exteiror walls was in state of disrepair with brick of exposure 2 and 3 corner missing and

    Aug 12, 2020

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1882
Floors
3
Residential units
3
Building area
3,640 ft²
Lot area
1,799 ft²
Zoning
R6B
Community board
303
Council district
36
Block / lot
1850 / 15
Assessed value
$130,860
Landmark / historic district
Bedford Historic District

Questions about 94 Macon Street

Who owns 94 Macon Street?

The owner of record in NYC Department of City Planning PLUTO data is Homeliv Development LLC.

Does 94 Macon Street have violations?

NYC HPD has no housing violations on record for this property.

Is 94 Macon Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 94 Macon Street built?

City records list 1882 as the year it was built.

How many apartments are in 94 Macon Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.