570 Greene Avenue
Brooklyn, NY 11216BBL 3-01799-0011Map
Owner of record: Renee Robinson
570 Greene Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11216. It has 4 residential units across 4 floors. The owner of record is Renee Robinson. HPD has recorded 75 housing violations here, most recently on September 19, 2026. 39 of the 50 most recent violations are still open.
- HPD violations
- 75
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 40
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 75
- BHazardous
Properly repair or replace the broken or defective electrical wall outlet at east in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Refit upper and lower sash windows at south wall in the 5th room from north located at apt 1, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 1, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical wall outlet at north wall in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Refit upper and lower sash window at north wall in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 1, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 1, 1st story, 1st apartment from north at east
Aug 28, 2026 · Apt 1
Open — Nov sent out - BHazardous
Refit lower sash window at south in the 6th room from north located at apt 1, 1st story, 1st apartment from north at east
Aug 28, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical wall outlet at north in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 28, 2026 · Apt 1
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective vinyl floor tile in the 5th room from north located at apt 1, 1st story, 1st apartment from north at east
Aug 28, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 1, 1st story, 1st apartment from north at east
Aug 28, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 1, 1st story, 1st apartment from north at east
Aug 28, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of infestation of flies in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Aug 28, 2026 · Apt 1
Open — Nov sent out - BHazardous
Refit lower sash window at north in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Aug 28, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective baseboard radiator at west in the 2nd room from north located at apt 1, 1st story, 1st apartment from north at east
Jan 30, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color baseboard radiator at east in the 3rd room from north located at apt 1, 1st story, 1st apartment from north at east
Jan 30, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective baseboard radiator at east in the 5th room from north located at apt 1, 1st story, 1st apartment from north at east
Jan 30, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective baseboard radiator at east in the 6th room from north located at apt 1, 1st story, 1st apartment from north at east
Jan 30, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 30, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 23, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Dec 23, 2024 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Dec 23, 2024 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of hotwater exceeds the maximum allowable temperature of 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Dec 23, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Dec 23, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 23, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 1, 1st story, 1st apartment from north at east
Dec 23, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Dec 23, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 23, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Dec 23, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Dec 23, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 23, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1, 1st story, 1st apartment from north at east
Dec 23, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective upper and lower sash at north window in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Dec 23, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at door in the entrance located at apt 1, 1st story, 1st apartment from north at east
Dec 23, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at north in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Dec 23, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Dec 23, 2024 · Apt 1
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2022
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Mar 1, 2022 · Apt 1
Closed — Violation closed - ANon-hazardous
Refit the lower sash at the window at north in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Mar 1, 2022 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Mar 1, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Mar 1, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and north wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from north at east
Mar 1, 2022 · Apt 1
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Heavy flow
Sep 18, 2026 · Apt 1
Close - Unsanitary condition
Pests
Sep 18, 2026 · Apt 1
Close - Door/window
Window frame
Sep 18, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Sep 18, 2026 · Apt 1
Close - Electric
Outlet/switch
Sep 18, 2026 · Apt 1
Close - Door/window
Door
Sep 18, 2026 · Apt 1
Close - Door/window
Window frame
Sep 18, 2026 · Apt 1
Close - Water leak
Heavy flow
Sep 11, 2026 · Apt 1
Close - Door/window
Window frame
Sep 11, 2026 · Apt 1
Close - Door/window
Door
Sep 11, 2026 · Apt 1
Close
Show 30 more ↓
- Electric
Outlet/switch
Sep 11, 2026 · Apt 1
Close - Water leak
Heavy flow
Aug 14, 2026 · Apt 1
Close - Unsanitary condition
Pests
Aug 14, 2026 · Apt 1
Close - Door/window
Window frame
Aug 14, 2026 · Apt 1
Close - Door/window
Window frame
Aug 14, 2026 · Apt 1
Close - Unsanitary condition
Sewage
Aug 14, 2026 · Apt BASEME
Close - Water leak
Heavy flow
Aug 10, 2026 · Apt 1
Close - Door/window
Window frame
Aug 10, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Dec 21, 2024 · Apt 1
Close - Electric
Outlet/switch
Dec 21, 2024 · Apt 1
Close - Door/window
Door
Dec 21, 2024 · Apt 1
Close - Door/window
Window frame
Dec 21, 2024 · Apt 1
Close - General
Mailbox
Dec 21, 2024 · Apt 1
Close - Plumbing
Radiator
Dec 21, 2024 · Apt 1
Close - Paint/plaster
Ceiling
Mar 1, 2022 · Apt 1ST
Close - Door/window
Window frame
Mar 1, 2022 · Apt 1ST
Close - Heat/hot water
Apartment only
Mar 1, 2022 · Apt 1ST
Close - Electric
No lighting
May 23, 2016 · Apt 1FLR
Close - Flooring/stairs
Floor
May 23, 2016 · Apt 1FLR
Close - Appliance
Electric/gas range
May 23, 2016 · Apt 1FLR
Close - Heat/hot water
Apartment only
May 23, 2016 · Apt 1FLR
Close - Plumbing
Bathtub/shower
May 23, 2016 · Apt 1FLR
Close - Heat/hot water
Apartment only
Feb 25, 2015 · Apt 1FL
Close - Heat/hot water
Apartment only
Feb 6, 2015 · Apt 1
Close - Heat/hot water
Apartment only
Jan 9, 2015 · Apt 1
Close - Plumbing
Sewer
Jun 22, 2004 · Apt 2
Close - Heating
Heat related
Jan 31, 2004 · Apt 1
Close - Heating
Heat related
Jan 15, 2004 · Apt 2
Close - Heating
Heat related
Jan 8, 2004 · Apt 1
Close - Heating
Heat related
Jan 8, 2004 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1931
- Floors
- 4
- Residential units
- 4
- Building area
- 3,293 ft²
- Lot area
- 1,544 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1799 / 11
- Assessed value
- $405,000
- Landmark / historic district
- No
HPD registration #369691, last renewed Mar 18, 2022.
Questions about 570 Greene Avenue
Who owns 570 Greene Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Renee Robinson.
Does 570 Greene Avenue have violations?
Yes. NYC HPD has recorded 75 housing violations at this property.
Is 570 Greene Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 570 Greene Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 570 Greene Avenue?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.