roofy

285 Clifton Place

Brooklyn, NY 11216BBL 3-01788-0067Map

Owner of record: Dca 1 Apartments, INC.

285 Clifton Place is a walk-up apartment building built in 1974 in Brooklyn, 11216. It has 8 residential units across 4 floors. The owner of record is Dca 1 Apartments, INC.. HPD has recorded 264 housing violations here, most recently on January 21, 2026.

HPD violations
264
DOB violations
7
ECB violations
1
HPD complaints
405

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jan 21, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 264

  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at 1st window stool from west at south in the 4th room from north located at apt 2a, 2nd story, 1st apartment from south at west

    Jan 21, 2026 · Apt 2A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 3rd room from north located at apt 4a, 4th story, 1st apartment from south at west

    Mar 26, 2025 · Apt 4A

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak at the west wall in the 3rd room from north located at apt 4a, 4th story, 1st apartment from south at west

    Mar 26, 2025 · Apt 4A

    Closed — Violation dismissed
  • B

    Replace the broken or defective washbasin in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west

    Mar 21, 2025 · Apt 3A

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Mar 21, 2025 · Apt 4A

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Mar 21, 2025 · Apt 4A

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at the east wall in the foyer located at apt 4a, 4th story, 1st apartment from south at west

    Mar 21, 2025 · Apt 4A

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west

    Mar 21, 2025 · Apt 3A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from north at west located at apt 4b, 4th story, 1st apartment from north at east

    Jul 27, 2023 · Apt 4B

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east

    Jul 27, 2023 · Apt 4B

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Replace with new the missing freezer door handle missing in the kitchen located at apt 4b, 4th story, 1st apartment from north at east

    Jul 27, 2023 · Apt 4B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the kitchen located at apt 4b, 4th story, 1st apartment from north at east

    Jul 27, 2023 · Apt 4B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from north at east located at apt 4b, 4th story, 1st apartment from north at east

    Jul 27, 2023 · Apt 4B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 4b, 4th story, 1st apartment from north at east

    Jul 27, 2023 · Apt 4B

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... .. at ceiling, approx 9 sq ft... in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west

    Jul 27, 2023 · Apt 3A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the north 3 room located at apt 3a, 3rd story, apartment at west

    May 4, 2021 · Apt 3A

    Closed — Violation dismissed
  • A

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3a, 3rd story, apartment at west

    May 4, 2021 · Apt 3A

    Closed — Violation dismissed
  • A

    Replace the broken or defective handle at water closet in the bathroom located at apt 3a, 3rd story, apartment at west

    May 4, 2021 · Apt 3A

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... ceiling and south wall (approx. 8 sq ft) in the bathroom located at apt 3a, 3rd story, apartment at west

    May 4, 2021 · Apt 3A

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 7, 2021

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt 3a, 3rd story, 1st apartment from south at west

    Jan 9, 2020 · Apt 3A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 3a, 3rd story, 1st apartment from south at west

    Jan 9, 2020 · Apt 3A

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective ceiling with fire retardant material at public hall, 4th story

    Oct 2, 2019

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling at public hall, 4th story

    Oct 2, 2019

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department bathroom ceiling located at apt 4a, 4th story, apartment at west

    Oct 2, 2019 · Apt 4A

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall, in the first room from north at east located at apt 4a, 4th story, apartment at west

    Oct 2, 2019 · Apt 4A

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at front of building on all stories at fire escape

    Sep 25, 2019

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective hasp and eye on gate at front of building at front areaway

    Sep 25, 2019

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 25, 2019

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story

    Sep 25, 2019

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 25, 2019 · Apt 1A

    Closed — Violation dismissed
  • A

    Refit low sash at south 2 window in the 4th room from north located at apt 1a, 1st story, 1st apartment from south at west

    Aug 25, 2019 · Apt 1A

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 5, 2019 · Apt 3A

    Closed — Violation closed
  • C

    Arrange and make self-closing the doors , in the entrance located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 5, 2019 · Apt 3A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the foyer located at apt 3b, 3rd story, 1st apartment from north at east

    Jul 17, 2019 · Apt 3B

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the foyer located at apt 3b, 3rd story, 1st apartment from north at east

    Jul 1, 2019 · Apt 3B

    Closed — Violation closed
  • B

    Properly repair the broken or defective counter balance on lower sash window at 2 nd window from south at west in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from north at east

    Jul 1, 2019 · Apt 3B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the foyer located at apt 3b, 3rd story, 1st apartment from north at east

    Jul 1, 2019 · Apt 3B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 4th story

    May 15, 2019

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 4th story

    May 15, 2019

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the foyer , the bathroom , the 1st room from north at east, the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from north at east

    May 2, 2019 · Apt 3B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from north at east

    May 2, 2019 · Apt 3B

    Closed — Violation closed
  • B

    Abate the infestation consisting of vermin ants in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east

    May 2, 2019 · Apt 3B

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east

    May 2, 2019 · Apt 3B

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east

    May 2, 2019 · Apt 3B

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east

    May 2, 2019 · Apt 3B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the foyer located at apt 3b, 3rd story, 1st apartment from north at east

    May 2, 2019 · Apt 3B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall in the 1st room from north at east located at apt 3b, 3rd story, 1st apartment from north at east

    May 2, 2019 · Apt 3B

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling, total 8 sq ft in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east

    May 2, 2019 · Apt 3B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east

    Apr 2, 2019 · Apt 3B

    Closed — Violation closed

DOB building violations · 7

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    May 16, 2022

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations · 1

  • Non-hazardous

    B4a/32a/19b/50a/50b/50c 50a-saftey valve is leaking 50b-saftey valve discharge pipe has been reduced and is running out fresh air vent whereit will freeze in cold weather and prevent safe discharge.50c-cap on c

    Jul 28, 2003 · Penalty $350

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Oct 20, 2026 · Apt 4B

    Open
  • Unsanitary condition

    Pests

    Oct 20, 2026 · Apt 4B

    Open
  • Plumbing

    Basin/sink

    Oct 20, 2026 · Apt 4B

    Open
  • Flooring/stairs

    Floor

    Oct 20, 2026 · Apt 4B

    Open
  • Door/window

    Door

    Oct 20, 2026 · Apt 4B

    Open
  • Paint/plaster

    Wall

    Oct 20, 2026 · Apt 4B

    Open
  • Water leak

    Heavy flow

    Oct 13, 2026 · Apt 4A

    Open
  • Unsanitary condition

    Pests

    Oct 6, 2026 · Apt 4B

    Open
  • Unsanitary condition

    Pests

    Oct 6, 2026 · Apt 4B

    Open
  • Flooring/stairs

    Floor

    Oct 6, 2026 · Apt 4B

    Open
Show 40 more ↓
  • General

    Cabinet

    Oct 6, 2026 · Apt 4B

    Open
  • Unsanitary condition

    Pests

    Sep 18, 2026 · Apt 4B

    Close
  • General

    Cabinet

    Sep 18, 2026 · Apt 4B

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2026 · Apt 4B

    Close
  • Door/window

    Door

    Sep 18, 2026 · Apt 4B

    Close
  • Paint/plaster

    Wall

    Sep 18, 2026 · Apt 4B

    Close
  • Paint/plaster

    Wall

    Sep 18, 2026 · Apt 4B

    Close
  • Appliance

    Electric/gas range

    Sep 18, 2026 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Aug 12, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Aug 12, 2026 · Apt 2A

    Close
  • Appliance

    Electric/gas range

    Aug 12, 2026 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jan 18, 2026 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Dec 20, 2022 · Apt 4A

    Close
  • Water leak

    Slow leak

    Oct 21, 2021 · Apt 1B

    Close
  • Door/window

    Door

    Oct 21, 2021 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Oct 21, 2021 · Apt 1B

    Close
  • Plumbing

    Toilet

    Feb 28, 2021 · Apt 1B

    Close
  • Water leak

    Heavy flow

    Sep 23, 2019 · Apt 4A

    Close
  • Plumbing

    Basin/sink

    Aug 10, 2019 · Apt 1A

    Close
  • General

    Ventilation system

    Aug 10, 2019 · Apt 1A

    Close
  • Plumbing

    Water supply

    Aug 10, 2019 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 10, 2019 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 10, 2019 · Apt 1A

    Close
  • Door/window

    Door

    Aug 10, 2019 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Aug 10, 2019 · Apt 1A

    Close
  • Plumbing

    Toilet

    Aug 10, 2019 · Apt 1A

    Close
  • Appliance

    Electric/gas range

    Apr 27, 2019 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Apr 27, 2019 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Apr 23, 2019 · Apt 3B

    Close
  • Water leak

    Slow leak

    Mar 28, 2019 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Mar 4, 2019 · Apt 3B

    Close
  • Unsanitary condition

    Sewage

    Mar 4, 2019 · Apt 3B

    Close
  • Plumbing

    Toilet

    Mar 4, 2019 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Feb 14, 2019 · Apt 3B

    Close
  • Electric

    Lighting

    Feb 14, 2019 · Apt 3B

    Close
  • General

    Cooking gas

    Feb 14, 2019 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Feb 14, 2019 · Apt 3B

    Close
  • Water leak

    Damp spot

    Dec 16, 2018 · Apt 3B

    Close
  • Water leak

    Damp spot

    Dec 16, 2018 · Apt 3B

    Close
  • Water leak

    Damp spot

    Dec 16, 2018 · Apt 3B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1974
Floors
4
Residential units
8
Building area
7,940 ft²
Lot area
5,000 ft²
Zoning
R6B
Community board
303
Council district
36
Block / lot
1788 / 67
Assessed value
$729,000
Landmark / historic district
No

HPD registration #374486, last renewed Aug 14, 2025.

Questions about 285 Clifton Place

Who owns 285 Clifton Place?

The owner of record in NYC Department of City Planning PLUTO data is Dca 1 Apartments, INC..

Does 285 Clifton Place have violations?

Yes. NYC HPD has recorded 264 housing violations at this property.

Is 285 Clifton Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 285 Clifton Place built?

City records list 1974 as the year it was built.

How many apartments are in 285 Clifton Place?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.