724 Dekalb Avenue
Brooklyn, NY 11216BBL 3-01780-0024Map
Owner of record: 724-726 Dekalb LLC
724 Dekalb Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11216. It has 14 residential units across 5 floors. The owner of record is 724-726 Dekalb LLC. HPD has recorded 130 housing violations here, most recently on September 14, 2026. 18 of the 50 most recent violations are still open.
- HPD violations
- 130
- DOB violations
- 10
- ECB violations
- 1
- HPD complaints
- 201
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 130
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Sep 14, 2026 · Apt 1G
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Sep 14, 2026 · Apt 1G
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the kitchen located at apt 1g, 1st story, 1st apartment from east at south
Sep 14, 2026 · Apt 1G
Open — Civ14 mailed - BHazardous
Replace with new the missing cover plate at electric outlet, at west wall in the kitchen located at apt 1g, 1st story, 1st apartment from east at south
Sep 14, 2026 · Apt 1G
Open — Civ14 mailed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wiring, electrical outlet at west wall in the kitchen located at apt 1g, 1st story, 1st apartment from east at south
Sep 14, 2026 · Apt 1G
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective drawer at sink base cabinet, at north wall in the kitchen located at apt 1g, 1st story, 1st apartment from east at south
Sep 14, 2026 · Apt 1G
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Sep 14, 2026 · Apt 1G
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Sep 14, 2026 · Apt 1G
Open — Civ14 mailed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 1g, 1st story, 1st apartment from east at south
Jan 5, 2025 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 1g, 1st story, 1st apartment from east at south
Jan 5, 2025 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal door in the entrance located at apt 1g, 1st story, 1st apartment from east at south
Jan 5, 2025 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Jan 5, 2025 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Jan 5, 2025 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Jan 5, 2025 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at window sill at window at east in the 2nd room from north located at apt 1g, 1st story, 1st apartment from east at south
Sep 4, 2024 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft around window frame at 1st window from east at south in the 5th room from north located at apt 1g, 1st story, 1st apartment from east at south
Sep 4, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Aug 18, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 6th room from north located at apt 1g, 1st story, 1st apartment from east at south
Aug 18, 2024 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Aug 18, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 1g, 1st story, 1st apartment from east at south
Aug 18, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Aug 15, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Replace with new the missing electrical light switch plate at north wall in the 5th room from north located at apt 1g, 1st story, 1st apartment from east at south
Aug 15, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at north wall in the 5th room from north located at apt 1g, 1st story, 1st apartment from east at south
Aug 15, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 5th room from north located at apt 1g, 1st story, 1st apartment from east at south
Aug 15, 2024 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Aug 15, 2024 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Aug 15, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 1g, 1st story, 1st apartment from east at south
Aug 15, 2024 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 7, 2024 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 7, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Refit upper and lower sashes, window in the 3rd room from north at west located at apt 1g, 1st story, 1st apartment from east at south
Jul 7, 2024 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Jul 7, 2024 · Apt 1G
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 1st room from north located at apt 1g, 1st story, 1st apartment from east at south
Jul 7, 2024 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1g, 1st story, 1st apartment from east at south
Jul 7, 2024 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 1st apartment from east at south
Jul 7, 2024 · Apt 1G
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceilings in the entire apartment located at apt 5g, 5th story, 1st apartment from east at south
Apr 23, 2023 · Apt 5G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 1st room from north located at apt 1g, 1st story, 1st apartment from east at south
Apr 23, 2023 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden floor at radiator. in the 2nd room from north located at apt 1g, 1st story, 1st apartment from east at south
Apr 23, 2023 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood saddle at door in the 1st room from east located at apt 1g, 2nd story, 1st apartment from east at south
Aug 28, 2022 · Apt 1G
Open — Nov certified late - BHazardous
Replace with new the broken or defective door at closet in the 1st room from east located at apt 1g, 2nd story, 1st apartment from east at south
Aug 28, 2022 · Apt 1G
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles throughout in the 1st room from east located at apt 1g, 2nd story, 1st apartment from east at south
Aug 28, 2022 · Apt 1G
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at window recess in the 1st room from north located at apt 1g, 2nd story, 1st apartment from east at south
Aug 28, 2022 · Apt 1G
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective wood floor throughout in the 1st room from north located at apt 1g, 2nd story, 1st apartment from east at south
Aug 28, 2022 · Apt 1G
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at window recess in the 3rd room from north located at apt 1g, 2nd story, 1st apartment from east at south
Aug 28, 2022 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at base cabinet in the kitchen located at apt 1g, 2nd story, 1st apartment from east at south
Aug 28, 2022 · Apt 1G
Open — Nov certified late - BHazardous
Replace with new the broken or defective rubber gasket at door refrigerator in the kitchen located at apt 1g, 2nd story, 1st apartment from east at south
Aug 28, 2022 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 2nd story, 1st apartment from east at south
Aug 28, 2022 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical outlet at west wall in the entrance located at apt 1g, 2nd story, 1st apartment from east at south
Aug 28, 2022 · Apt 1G
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Aug 1, 2022 · Apt 1G
Closed — Violation dismissed
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 1
- Class - 3
Violation issue for failure to maintain facade. at time of inspection observed ac units without brackets on floor 2, and ac units obstruction on fire escape at exposure #1., repair and or replace
Jan 2, 2024 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Pests
Sep 10, 2026 · Apt 1G
Close - Paint/plaster
Wall
Sep 10, 2026 · Apt 1G
Close - General
Cabinet
Sep 10, 2026 · Apt 1G
Close - Plumbing
Radiator
Sep 10, 2026 · Apt 1G
Close - Unsanitary condition
Pests
Mar 20, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Mar 20, 2025 · Apt 1B
Close - Door/window
Door frame
Jan 28, 2025 · Apt 1G
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 1G
Close - Door/window
Door
Jan 22, 2025 · Apt 1G
Close - Door/window
Door frame
Jan 8, 2025 · Apt 1G
Close
Show 40 more ↓
- Door/window
Door
Jan 3, 2025 · Apt 1G
Close - Heat/hot water
Apartment only
Jan 3, 2025 · Apt 1G
Close - Door/window
Window frame
Aug 13, 2024 · Apt 1G
Close - Safety
Window guard broken/missing
Aug 13, 2024 · Apt 1G
Close - Paint/plaster
Wall
Aug 13, 2024 · Apt 1G
Close - Unsanitary condition
Pests
Aug 13, 2024 · Apt 1G
Close - General
Cabinet
Aug 5, 2024 · Apt 5G
Close - Flooring/stairs
Floor
Aug 5, 2024 · Apt 5G
Close - Unsanitary condition
Pests
Aug 5, 2024 · Apt 5G
Close - Unsanitary condition
Pests
Aug 5, 2024 · Apt 5G
Close - Door/window
Window frame
Jul 1, 2024 · Apt 1G
Close - Unsanitary condition
Pests
Jul 1, 2024 · Apt 1G
Close - Flooring/stairs
Floor
Jul 1, 2024 · Apt 1G
Close - Unsanitary condition
Pests
Jul 1, 2024 · Apt 1G
Close - Unsanitary condition
Pests
Jun 20, 2024 · Apt 5G
Close - Appliance
Electric/gas range
Jun 20, 2024 · Apt 5G
Close - Appliance
Electric/gas range
Jun 20, 2024 · Apt 5G
Close - Unsanitary condition
Pests
Jun 20, 2024 · Apt 5G
Close - Flooring/stairs
Floor
Dec 23, 2022 · Apt 5G
Close - Paint/plaster
Wall
Dec 23, 2022 · Apt 5G
Close - Plumbing
Basin/sink
Dec 23, 2022 · Apt 5G
Close - Appliance
Electric/gas range
Dec 23, 2022 · Apt 5G
Close - Appliance
Electric/gas range
Sep 28, 2022 · Apt 1G
Close - Unsanitary condition
Pests
Aug 26, 2022 · Apt 1G
Close - Door/window
Window frame
Aug 26, 2022 · Apt 1G
Close - Plumbing
Steam pipe/riser
Aug 26, 2022 · Apt 1G
Close - Flooring/stairs
Floor
Aug 26, 2022 · Apt 1G
Close - Appliance
Refrigerator
Aug 26, 2022 · Apt 1G
Close - Electric
Outlet/switch
Aug 26, 2022 · Apt 1G
Close - Paint/plaster
Wall
Aug 26, 2022 · Apt 1G
Close - Flooring/stairs
Floor
Aug 26, 2022 · Apt 1G
Close - Paint/plaster
Ceiling
Jul 28, 2022 · Apt 1G
Close - Flooring/stairs
Floor
Jul 28, 2022 · Apt 1G
Close - Flooring/stairs
Floor
Jul 28, 2022 · Apt 1G
Close - Unsanitary condition
Pests
Jul 28, 2022 · Apt 1G
Close - Door/window
Window frame
Jul 28, 2022 · Apt 1G
Close - Heat/hot water
Apartment only
Nov 8, 2019 · Apt 1E
Close - Flooring/stairs
Floor
Jan 29, 2019 · Apt 5G
Close - Paint/plaster
Wall
Jan 29, 2019 · Apt 5G
Close - Door/window
Window frame
Jan 29, 2019 · Apt 5G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 5
- Residential units
- 14
- Building area
- 16,312 ft²
- Lot area
- 3,750 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1780 / 24
- Assessed value
- $937,800
- Landmark / historic district
- No
HPD registration #301610, last renewed Jul 16, 2025.
Questions about 724 Dekalb Avenue
Who owns 724 Dekalb Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 724-726 Dekalb LLC.
Does 724 Dekalb Avenue have violations?
Yes. NYC HPD has recorded 130 housing violations at this property.
Is 724 Dekalb Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 724 Dekalb Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 724 Dekalb Avenue?
It has 14 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.