80 Vernon Avenue
Brooklyn, NY 11206BBL 3-01759-0010Map
Owner of record: 80 Vernon Gardens LLC
80 Vernon Avenue is an elevator apartment building built in 2025 in Brooklyn, 11206. It has 8 residential units. The owner of record is 80 Vernon Gardens LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 1
- ECB violations
- 16
- HPD complaints
- 4
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 1
- Construction other optional
Failure to maintain bldg in safe condition.the rear bldg extension approx 6ft,had partially cllpsd.the rear exp2 & exp4 brickwalls,approx 10"tall,are partially unbraced.full demo application.bldg to be demo undr prmt strtng 5/19/25 and completed/sgnd off by 6/30/2025
May 12, 2025
Dob violation - dismissed
ECB violations · 16
- Class - 2
Some of the windows were installed with u-factor 0.30 contrary to en drawing that indicate u-factor 0.25., conform work to approved construction documents/amendments; please go to https://www1.nyc.gov/site/buil
Mar 19, 2026
Resolve - Class - 2
At time of inspection observed active after hours construction activity (working on scaffold and framing work) where no ahv permit on file for today date construction work. only for delivery. stop all ahv const
Mar 15, 2026 · Penalty $1,250
Resolve - Class - 2
Atoi observed jersey barriers at exp#1 not as per manufactures specification. jersey barriers not interlocked neither fill with water/sand which poses a potential hazard by allowing unintended movement of the
Jan 24, 2026 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed work not in conformance to the approveddrawings at exp# 2 and #4. brace connection at exp# 2 adjacent property wall not reflecting approved drawings and exp#4 brace connections n
Dec 22, 2025
Resolve - Class - 2
Proposed 6 story building. observed heavy machinery @ leading edge on excavated soil, when requested for the superimposed loads letter for soil as per code 3304.4.5 none was provided, after reviewing the cs log
Dec 12, 2025 · Penalty $1,250
Resolve - Class - 1
Proposed 6 story building. observed obstructed egress from materials & machinery, inadequate protection @ excavation edges, heavy machinery @ leading edge on excavated soil with workers close to it without acce
Dec 12, 2025 · Penalty $5,000
Resolve - Class - 2
Inactive demo site observed construction fence installed at exp1. both view panels appear to be painted from inside. this obstructs the view into the site. view panels must provide a clear view into site. as pe
Aug 7, 2025 · Penalty $1,000
Resolve - Class - 1
Observed on second floor removal of sheetrock. permit not obtained., obtain permit; obtain permit
May 9, 2025 · Penalty $2,500
Resolve - Class - 1
Observed at setback on ground floor partial collapse of roof right as setback starts. approximately 8 roof joists have collapsed. no visible structural damage to exposure #2, 3 or 4 walls observed at setback.,
May 9, 2025 · Penalty $2,530
Resolve - Class - 2
Failure to maintain building and all parts thereof in a code-compliantmanner.at time of my inspection observed sidewalk curb at front of property(exp1)illegally cut so that portion of the sidewalk is lowered en
May 25, 2021
Resolve
Show 6 more ↓
- Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#39008099z issued on 8/20/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commissio
Oct 11, 2019
Resolve - Class - 1
Observed bldg has 2 stories + one mezzanine on ground floor, obtain permit
Aug 20, 2019
Resolve - Class - 2
Observed bathroom on ground floor; however, no plumbing permit filed to install bathroom in dob records, obtain all permits
Aug 20, 2019
Resolve - Class - 2
Observed work in progress in preparation of hvac installation with no permit having been filed, obtain all permits
Aug 20, 2019
Resolve - Class - 2
Observed large container with stairs and door/ ford van with no front or rear plates parked/garaged in front of premises, conform to parking regulations
Aug 20, 2019
Resolve - Class - 2
Failed to obtain a temporary construction permit prior to installationuse of sidewalk shed. noted: at east side of bldg sidewalk shed erected apprx 55ft length 8ft wide and 10ft ht also noted no permit/filed at
Jul 9, 2008
Resolve
Complaints
- Plumbing
Water supply
May 24, 2024 · Apt 2
Close - Plumbing
Water supply
May 24, 2024 · Apt 2
Close - Unsanitary condition
Sewage
May 4, 2024 · Apt 2
Close - Water leak
Slow leak
May 4, 2024 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2025
- Floors
- —
- Residential units
- 8
- Building area
- 14,998 ft²
- Lot area
- 5,000 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1759 / 10
- Assessed value
- $87,300
- Landmark / historic district
- No
Questions about 80 Vernon Avenue
Who owns 80 Vernon Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 80 Vernon Gardens LLC.
Does 80 Vernon Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 80 Vernon Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 80 Vernon Avenue built?
City records list 2025 as the year it was built.
How many apartments are in 80 Vernon Avenue?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.