68 Vernon Avenue
Brooklyn, NY 11206BBL 3-01758-0046Map
Owner of record: Simon Brucha LLC
68 Vernon Avenue is a mixed residential and retail building built in 1931 in Brooklyn, 11206. It has 1 residential unit across 4 floors. The owner of record is Simon Brucha LLC. HPD has recorded 3 housing violations here, most recently on November 30, 1999. 3 of the 3 most recent violations are still open.
- HPD violations
- 3
- DOB violations
- 32
- ECB violations
- 23
- HPD complaints
- 18
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3
- BHazardous
Abate the nuisance consisting of vermin roaches. in the 1st entire apartment from north located at apt 2, 2nd story
Nov 30, 1999 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective refrigerator gasket. in the 1st kitchen from north at east located at apt 2, 2nd story
Nov 30, 1999 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit windows. in the 1st entire apartment from north located at apt 2, 2nd story, apartment at north
Nov 30, 1999 · Apt 2
Open — Nov sent out
DOB building violations · 32
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
Structure rendered non compliant- at time of inspection observed shoring system inplace on 1st, 2nd , 3rd floors. no approved drawings onsite.
Jan 29, 2023
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Jan 29, 2021
Dob violation - dismissed - Construction other optional
Ftm bldg safe condn:exp1 siding bulg out&prtly detch'd @ 4fl-roof.exp4 siding @ 1/4 crnr prtly delaminatd@2fl lvl.there is approx a 1 sf roof opng @ roof ridge near exp4 wall.intr frmg not inspct to verify stabil due fire on/arnd 11/23/19.ownr to retn nyspe to eval entre bldg & prep rpr dwgs.bldg to be rpr'd undr prmt strt by 3/1/21 & cmpltd by 4/16/21
Jan 22, 2021
Dob violation - dismissed - Construction other optional
.due to fire
Nov 23, 2019
Dob violation - dismissed
Show 22 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 23
- Class - 1
Failure to comply with the commissioner's order in dob violation vio23-00263, dated 1/29/2023. respondent was required to submit an engineer's report concerning structurally deficient conditions. as of 10/11/20
Oct 11, 2023 · Penalty $2,500
Resolve - Class - 2
Atoi, building erected up to 3rd floor work deck with no ohp in place on site presenting a hazard for workers. provide over head protection.
Feb 16, 2023 · Penalty $625
Resolve - Class - 1
Atoi, structural beams erected above 40ft at exposure 3 and no side walk shed was installed. maintain pedestrian protection.
Feb 16, 2023 · Penalty $10,000
Resolve - Class - 2
At time of inspection upon request for shop drawings, shoring details, and logbooks, ssp, architectural drawings none where provided of made available. stop all construction work entire jobsite. =provide constr
Jan 29, 2023 · Penalty $312
Resolve - Class - 2
Work after hours without a variance permit- at time of inspection of building under alteration observed 2 workers welding at rear of 1st floor. upon review of dept records no after hours variance had been issue
Jan 29, 2023 · Penalty $1,250
Resolve - Class - 1
No guardrails- at time of inspection no guardrail system in place at leading edges the at rear and entryway area of 1st floor creating a hazardous fall condition from a height greater then 6' ft, provide guard
Jan 29, 2023 · Penalty $2,500
Resolve - Class - 1
Construction superintendent failed to perfom duties- at time of inspection observed 1. no daily jobsite logbook 2. no guardrail system in place at location on 1st floor. 3. no approved drawings onsite 4. worker
Jan 29, 2023 · Penalty $10,000
Resolve - Class - 1
At time of inspection on an active job site performing soe work at exp. 2 and 3. - after reviewing the site safety plan - i observed no soe phase only superstructure and facade phase. when asking for the orient
Aug 23, 2022 · Penalty $1,250
Resolve - Class - 1
At time of inspection observed active soe work at exp.2 and 3 - upon review of soe drawings on site i observed the following contrary conditions - rakers installed with a cut out - not shown on approved drawing
Aug 23, 2022 · Penalty $625
Resolve - Class - 2
At time of inspection on an active 4 story alt jobsite performing soe work at exp. 2 and 3 - i observed c.s. logbook not maintained - c.s. did not sign in and out daily as work took place and no designated comp
Aug 23, 2022 · Penalty $2,500
Resolve
Show 13 more ↓
- Class - 1
Failure to maintain sidewalk: noted at time of inspection of an active observed at exp # 1 sidewalk driveway entrance leading to the jobsite has large crack's/1 inch drop which can create a trip and fall hazard
Jun 29, 2022 · Penalty $625
Resolve - Class - 2
Noted: observed at the east elevation (marcy avenue side) of the building, loose and missing aluminum siding above third floor windows., maintain exterior building wall
Jul 30, 2020 · Penalty $3,125
Resolve - Class - 2
Illegal use in residential district @time of inspection observed a vehicle parking illegaly @backyard @the property w/o plate & current sticker registration @front vehicle operate with gasoline storage in
Jul 18, 2019
Resolve - Class - 1
Work without pemrit at time of inspection observed partial demolition in progress without permit observed also demolished the car garage at rear yard and the roof of garage is not secure "stop all construction
Jul 18, 2019
Resolve - Class - 2
Failure to safeguard all persons & property affected by const operations. @time of inspection observe @backyard a lot const rubbish accomulated & observed combustible material storaged @rear yard.rem: safeguard
Jul 18, 2019
Resolve - Class - 2
Work w/o a permit. note:above 1st fl front extension new 2"x4" wood studs w/new windows erected around open porch w/metal covering enclosingporch.also new rolldown gate erected @ front of 1st fl. stop all work
Apr 28, 2012 · Penalty $800
Resolve - Class - 3
Failure to maintain bldg wall.noted:at north elevation (vernon ave) btwn 2nd & 4th floors sections of siding material missing,loose & in danger of falling in various locations throughout.remedy:make safe immedi
Jan 21, 2009 · Penalty $500
Resolve - Class - 1
Failure tto maintain bldg wall(s) or appurtenances. noted: siding at north section of bldg has its siding peeling off. remedy: maintain exterior bldg wall.
Sep 30, 2008 · Penalty $5,000
Resolve - Non-hazardous
Failure to maintain: at side of ( ) siding and asphalt sheeting in a state of disrepair at various locations & hanging. remedy: make all repairs in a safe and lawful manner.
May 28, 2008 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior bldg wall. note: the side wall of bldg at vernon ave side missing an approx. 7ft x 20ft area of venal siding at 2nd flr level + 6ft x 15ft area of venal siding at 4th flr and roof
Apr 7, 2008 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain defect is: stairs leaning loose and defective threads and risers , and pullig away from wall , between 2nd and 3rd floors . remedy: make all necessary repairs to the satisfaction of this dep
Nov 24, 1999 · Penalty $180
Resolve - Hazardous
Failure to maintain building /hazardous defect is/at 2nd to 3rd flr stair loose treads in various locations/ loose hand rail at same fright of stairs. remedy; make all necessary repairs immediately.
Apr 29, 1997 · Penalty $1,000
Resolve - Hazardous
Failure to provide required mean of egress from all sro rooms at 4th flr. locked (total obstructdd room door ajoining fire escape.) denies 2nd means of egress to 3 remaining sro rooms at forth flr. 2 at 1st fl
Apr 29, 1997 · Penalty $500
Resolve
Complaints
- Heat/hot water
Entire building
Jan 23, 2016 · Apt BLDG
Close - Electric
Bell-buzzer/intercom
Apr 12, 2010 · Apt 2
Close - General
Doors
Apr 12, 2010 · Apt 2
Close - General
Mailbox
Apr 12, 2010 · Apt 2
Close - Plumbing
Water-leaks
Apr 12, 2010 · Apt 2
Close - General
Windows
Apr 12, 2010 · Apt 2
Close - Heating
Heat related
Mar 10, 2010 · Apt 2
Close - Heating
Heat related
Feb 14, 2010 · Apt 2
Close - Heating
Heat related
Nov 8, 2009 · Apt 2
Close - Heating
Heat related
Mar 15, 2009 · Apt 2
Close
Show 8 more ↓
- Heating
Heat related
Mar 15, 2009 · Apt 2
Close - Heating
Heat related
Dec 13, 2008 · Apt 2
Close - General
Cabinet
Apr 7, 2008 · Apt 2
Close - Plumbing
Toilet
Apr 7, 2008 · Apt 2
Close - General
Doors
Apr 7, 2008 · Apt 2
Close - General
Windows
Apr 7, 2008 · Apt 2
Close - General
Doors
Apr 3, 2008 · Apt 2
Close - Heating
Heat related
Feb 11, 2008 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 1
- Building area
- 7,313 ft²
- Lot area
- 1,750 ft²
- Zoning
- R7A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1758 / 46
- Assessed value
- $68,520
- Landmark / historic district
- No
Questions about 68 Vernon Avenue
Who owns 68 Vernon Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Simon Brucha LLC.
Does 68 Vernon Avenue have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is 68 Vernon Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 68 Vernon Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 68 Vernon Avenue?
It has 1 residential units and 2 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.