178 Throop Avenue is an elevator apartment building built in 2025 in Brooklyn, 11206. It has 7 residential units across 7 floors. The owner of record is 178 Throop Avenue Trust. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 0
- ECB violations
- 13
- HPD complaints
- 6
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 0
No DOB violations on record
ECB violations · 13
- Class - 1
Upon inspection i observed a excavation in progress approx.. 7ft deep with inadequate soe (support of excavation) missing lagging boards and bracing. this improper protection can lead to a trench collapse. i al
Jun 2, 2026 · Penalty $5,000
Resolve - Class - 2
Upon inspection i observed a fence installed at expos 1&2 not constructed or maintained according to code. protruding objects (nails, screws, wood panels). fence not 8ft above fence entry door at expos 2. fence
Jun 2, 2026 · Penalty $1,000
Resolve - Class - 2
Upon inspection i observed a fence installed at expos 1&2 with not fence project info panel installed at expos 2 contrary to code 3301.9.1.2 posting of project information panels.a project information panel sha
Jun 2, 2026 · Penalty $1,250
Resolve - Class - 2
Upon inspection i observed inadequate pedestrian protection around a excavator stored within the barricades at expos 2. the excavator was not located, guarded, shielded, or barricaded so as to prevent contact
Jun 2, 2026 · Penalty $2,500
Resolve - Class - 2
At the time of reinspection of a class 1 summons ending in 0372k has not filled for certificate of correction after reviewing the department records comply with code and file for certificate of correction as
Apr 15, 2026 · Penalty $1,250
Resolve - Class - 1
Miscellaneous violations. 3314.1. at the time of inspection of a seven-story new building with active construction, stucco operations were in progress. the pipe scaffold at exp #1, 2, 3, and 4 was not maintaine
Feb 13, 2026 · Penalty $5,000
Resolve - Class - 2
Failure to safeguard the public and property affected by construction operations. at the time of inspection of a seven-story new building, workers were observed on a pipe scaffold at the seventh-floor level wit
Feb 13, 2026 · Penalty $5,000
Resolve - Class - 2
At expo#2 and #3 the debris netting is not installed as per b.c 3314.8.2. netting is flapping in the wind and starting to become undone and can blow onto the street and neighboring property due to the high wind
Feb 1, 2026 · Penalty $2,500
Resolve - Class - 2
The adjacent building to site has an active driveway and a construction fence installed on the pedestrian pathway in a way that the driver cannot see who is crossing infront the driveway. the drive way has no b
Feb 1, 2026 · Penalty $625
Resolve - Class - 1
Bc 3303.11.2. failure to maintain one permanent stair on construction site. as noted at time of my inspection on an active construction site. 6 story new building rebar placement work 5th to 6th columns. i obse
Nov 26, 2025 · Penalty $2,500
Resolve
Show 3 more ↓
- Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guard rails. as noted at time of inspection on an active construction site 6 story new building rebar placement work 5th to 6
Nov 26, 2025
Resolve - Class - 1
No guard rails at platform of concret formwork.
Oct 20, 2025 · Penalty $5,000
Resolve - Class - 2
Failure to comply with dot rules & regulations at the time of inspection on an active job site currently at excavation phase , i observed yodock system at exposure 2 roadway not not as per bc 3307.2.1 of five
Mar 17, 2025 · Penalty $625
Resolve
Complaints
- Water leak
Heavy flow
Jan 3, 2023 · Apt A6C
Close - Unsanitary condition
Mold
Jan 3, 2023 · Apt A6C
Close - Construction
Roof
Jan 14, 2005 · Apt TOPFL
Close - Plumbing
Water-leaks
Jan 14, 2005 · Apt TOPFL
Close - Paint/plaster
Ceiling
Jan 14, 2005 · Apt TOPFL
Close - Heating
Heat related
Dec 16, 2004 · Apt TOPFL
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 14, 2026 | Non-market transfer | Rentals - elevator apartments | 7 |
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2025
- Floors
- 7
- Residential units
- 7
- Building area
- 13,045 ft²
- Lot area
- 2,917 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1726 / 132
- Assessed value
- $161,100
- Landmark / historic district
- No
Questions about 178 Throop Avenue
Who owns 178 Throop Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 178 Throop Avenue Trust.
Does 178 Throop Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 178 Throop Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 178 Throop Avenue built?
City records list 2025 as the year it was built.
How many apartments are in 178 Throop Avenue?
It has 7 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.