roofy

280 Patchen Avenue

Brooklyn, NY 11233BBL 3-01687-0050Map

Owner of record: 280 Patchen Ave., LLC

280 Patchen Avenue is a two-family home built in 2017 in Brooklyn, 11233. It has 2 residential units across 3 floors. The owner of record is 280 Patchen Ave., LLC. HPD has recorded 17 housing violations here, most recently on March 22, 2010.

HPD violations
17
DOB violations
4
ECB violations
6
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 22, 2010

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 17

  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story

    Mar 22, 2010 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair the broken or defective bell and intercommunication system in the entire apartment located at apt 1fl, 1st story

    Mar 22, 2010 · Apt 1FL

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ,, in the bathroom located at apt 1fl, 1st story

    Mar 22, 2010 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair the broken or defective mortise lock at entrance door to apt. located at apt 1fl, 1st story

    Mar 22, 2010 · Apt 1FL

    Closed — Violation closed
  • A

    Refit door at entrance to apartment located at apt 1fl, 1st story

    Mar 22, 2010 · Apt 1FL

    Closed — Violation closed
  • A

    Refit window in the 1st room from east at south located at apt 1fl, 1st story

    Mar 22, 2010 · Apt 1FL

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and walls in the entire apartment located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed
  • B

    Properly repair the broken or defective electric light fixture at the ceiling in the 1st room from north at west located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed
  • B

    Properly repair the broken or defective electric light fixture at the ceiling in the kitchen located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed
Show 7 more ↓
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd private hallway from east located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed
  • A

    Repair the broken or defective connection sink waste line in the kitchen located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood base cabinet in the kitchen located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tile wall at the bathtub enclosure in the bathroom located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed
  • B

    Replace with new the broken or defective saddle at the threshold in the bathroom located at apt 1-fl, 1st story, apartment at south

    Jul 27, 2004 · Apt 1-FL

    Closed — Violation closed

DOB building violations · 4

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 9, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 9, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 9, 2018

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 11, 1992

    Vp*-violation unserved ecb- dismissed

ECB violations · 6

  • Class - 2

    Failure to meet interior lighting power requirement. nb #321233125 in an energy compliance inspection, i observed interior lighting installed is excessive and contrary to the plans page (en-001.00) at time of i

    May 31, 2018

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. attime of inspection observed an active construction site with interior work in progress. during inspection noted an excessive amount of debri

    May 9, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    No guardrails. at time of inspection observed an active construction site with interior work in progress. during inspection noted that there is no guardrails at the 2nd floor deck at exposure #3 as required by

    May 9, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to post permit for work at premises at time of inspection observed an active construction site with interior work in progress. during inspection noted that the contractor failed to post permit for work

    May 9, 2018

    Resolve
  • Class - 2

    Job site fence not painted hunter green. at time of inspection observ ed an active construction site with interior work in progress. during inspection noted that the jobsite fence not painted hunter green as re

    May 9, 2018

    Resolve
  • Class - 1

    No handrails. at time of inspection observed an active construction site with interior work in progress. during inspection noted that there is no handrails from the basement to the 2nd floor as required by

    May 9, 2018 · Penalty $2,500

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

DatePriceTypeUnits
Oct 30, 2025Non-market transferTwo family dwellings2

Building details

Building type
Two-family home (B1)
Year built
2017
Floors
3
Residential units
2
Building area
2,412 ft²
Lot area
1,242 ft²
Zoning
R6B
Community board
303
Council district
36
Block / lot
1687 / 50
Assessed value
$153,300
Landmark / historic district
No

Questions about 280 Patchen Avenue

Who owns 280 Patchen Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 280 Patchen Ave., LLC.

Does 280 Patchen Avenue have violations?

Yes. NYC HPD has recorded 17 housing violations at this property.

Is 280 Patchen Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 280 Patchen Avenue built?

City records list 2017 as the year it was built.

How many apartments are in 280 Patchen Avenue?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.