roofy

266 Malcolm X Boulevard

Brooklyn, NY 11233BBL 3-01666-0043Map

Owner of record: Fc 266 LLC

266 Malcolm X Boulevard is a walk-up apartment building built in 1892 in Brooklyn, 11233. It has 9 residential units across 4 floors. The owner of record is Fc 266 LLC. HPD has recorded 103 housing violations here, most recently on December 4, 2025. 2 of the 50 most recent violations are still open.

HPD violations
103
DOB violations
19
ECB violations
13
HPD complaints
336

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Dec 4, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 103

  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall in the 2nd room from east located at apt 6, 3rd story, 1st apartment from north at east

    Dec 4, 2025 · Apt 6

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall in the 1st room from east located at apt 6, 3rd story, 1st apartment from north at east

    Dec 4, 2025 · Apt 6

    Open — Notice of issuance sent to tenant
  • C

    Remove the illegal fastening padlockable eyes at bldg entrance metal door , 1st story

    Nov 26, 2017

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector ''defective'' in the entire apartment located at apt 7, 3rd story, 1st apartment from west at north

    Oct 5, 2017 · Apt 7

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). ''defective'' in the entire apartment located at apt 7, 3rd story, 1st apartment from west at north

    Oct 5, 2017 · Apt 7

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 21, 2017

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 21, 2017

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Sep 21, 2017

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 21, 2017

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Sep 21, 2017

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 21, 2017

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Sep 21, 2017

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 21, 2017

    Closed — Violation dismissed
  • B

    Provide adequate lighting for ceiling light fixtue 60 watts at public hall, 2nd story

    Jan 10, 2016

    Closed — Violation closed
  • C

    Replace with new the missing stair case between 2nd sty 3rd sty at public hall stairs

    Jan 10, 2016

    Closed — Violation closed
  • B

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north

    Jan 10, 2016 · Apt 2F

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system boiler room door locked at basement

    Jan 10, 2016

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north

    Jan 10, 2016 · Apt 2F

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door to cellar locked, at public hall, 1st story

    Nov 20, 2014

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of scalding hot water to apartment fixtures, in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 20, 2014 · Apt 2L

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 20, 2014 · Apt 2L

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 13, 2014 · Apt 2L

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of 170 degrees of scalding hot water in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 13, 2014 · Apt 2L

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 13, 2014 · Apt 2L

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 3f, 3rd story, 2nd apartment from west at north

    Nov 12, 2014 · Apt 3F

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 2f, 2nd story, 1st apartment from west at north

    Nov 12, 2014 · Apt 2F

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling ceiling in the kitchen located at apt 3f, 3rd story, 2nd apartment from west at north

    Nov 12, 2014 · Apt 3F

    Closed — Violation closed
  • B

    Replace with new the broken or defective ceramic tile floor in the kitchen located at apt 3f, 3rd story, 2nd apartment from west at north

    Nov 12, 2014 · Apt 3F

    Closed — Violation closed
  • B

    Properly repair the broken or defective inter com system. in the entire apartment located at apt 3f, 3rd story, 2nd apartment from west at north

    Nov 12, 2014 · Apt 3F

    Closed — Violation closed
  • B

    Replace with new the missing radiator shut off valve. in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 12, 2014 · Apt 2L

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Nov 12, 2014 · Apt 2L

    Closed — Violation closed
  • A

    Refit west door in the entrance located at apt 2l, 2nd story, 1st apartment from west at north

    Nov 12, 2014 · Apt 2L

    Closed — Violation closed
  • C

    Repair the broken or defective connection waste line at sink in the kitchen located at apt 2l, 2nd story, apartment at south

    Nov 12, 2014 · Apt 2L

    Closed — Violation dismissed
  • A

    Refit base cabinet door at sink in the kitchen located at apt 2l, 2nd story, apartment at south

    Nov 12, 2014 · Apt 2L

    Closed — Violation closed
  • A

    Refit windows in the 1st room from east located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 12, 2014 · Apt 2L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 2f, 2nd story, 1st apartment from west at north

    Nov 12, 2014 · Apt 2F

    Closed — Violation closed
  • C

    Repair the broken or defective connection at radiator in the 1st room from east located at apt 2f, 2nd story, 1st apartment from west at north

    Nov 12, 2014 · Apt 2F

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 2nd room from east located at apt 2f, 2nd story, 1st apartment from west at north

    Nov 12, 2014 · Apt 2F

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 3f, 3rd story, 2nd apartment from west at north

    Nov 12, 2014 · Apt 3F

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 2f, 2nd story, 1st apartment from west at north

    Nov 12, 2014 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, west wall in the kitchen located at apt 3f, 3rd story, 2nd apartment from west at north

    Nov 12, 2014 · Apt 3F

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed at ceiling in the 2nd room from east located at apt 2f, 2nd story, 1st apartment from west at north

    Nov 12, 2014 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire rated ceiling at public hall, 1st story

    Nov 12, 2014

    Closed — Violation closed
  • B

    Replace with new the missing vestibule door. at public hall, 1st story

    Nov 12, 2014

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire rated material south wall at public hall, 3rd story

    Nov 12, 2014

    Closed — Violation closed
  • B

    Properly secure the loose loose treads 5 and 6 up from at public hall stairs, 2nd story

    Nov 12, 2014

    Closed — Violation closed
  • B

    Properly secure the loose wood tread 5 and 6 up from bottom at public hall, 2nd story

    Nov 12, 2014

    Closed — Violation closed
  • B

    Replace with new the missing newel post cap at public hall stairs, 1st story

    Nov 12, 2014

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north

    Nov 12, 2014 · Apt 2F

    Closed — Violation closed
  • B

    Replace with new the broken or defective ceramic tile floor in the bathroom located at apt 3f, 3rd story, 2nd apartment from west at north

    Nov 12, 2014 · Apt 3F

    Closed — Violation closed

DOB building violations · 19

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
Show 9 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 13

  • Class - 3

    Failure to maintain building in a code compliant manner: public facility signage per pc 403.4 noted: at establishment (trad room) located on the ground floor, has (2) public single occupant restrooms that are n

    Aug 26, 2019

    Resolve
  • Class - 2

    Failure to maintain bldg walls.noted at exp1 front along malcolm x blvd. masonry brick between 1st and 2nd flr. exterior has become deteriorated and now starting to bulge outward mortar is missing and section

    Dec 5, 2014 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to obtain a shed permit.note:a sidewalk shop approx 32"long installed at front of bldg w/o permit.remedy:obtain permit

    Dec 6, 2006 · Penalty $400

    Resolve
  • Hazardous

    Failure to maintain:wood cornice at front of bldg 1st fl is in disrepair w/ loose unsecured wood sections. remedy:maintain bldg.

    Aug 8, 2006 · Penalty $2,000

    Resolve
  • Hazardous

    Failure to maintain note: 1. excessive debris, old plaster metal sinksapprox 10 cu yds of debris dumped at rear yard at base of fire escape 2.1st fl wood cornice is in disrepair with loose unsecured sections

    Apr 14, 2006 · Penalty $2,000

    Resolve
  • Hazardous

    Exit passageway or corridor: total obstruction. secondary egress at 1st fl & fire escape ladder is totaly obstructed by trash & other debris that encompasses the entire rear yd approx. 30'ft long by 20'ft wide

    Feb 3, 2006 · Penalty $500

    Resolve
  • Hazardous

    Failure to maintain noted: the rear yard consist of piles of rubish, including construction debris same debris, obstructing the use of fire escape in the event of an emergency. noted: this building is present

    Dec 5, 2005 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain. noted defect: accumulation of construction debris and rubbish,lumber,light fixtures,plastic pails, household rubbish, compiled in approx. 12w x 10l x 5 ht. mound form. noted location:rear y

    Apr 20, 2005

    Resolve
  • Hazardous

    Failure to maintain adequate housekeeping: large amount of debris being stored at rear yard and 1st floor store: debris includes but not limited to wood, garbage bags, lumber, metal studs, compound camsters,

    Jan 10, 2005

    Resolve
  • Hazardous

    Failure to maintain adequate housekeeping: large amount of debris being stored at rear yard and 1st floor store. debris includes but not limited to wood, garbage bags, lumber, metal studs, compound canisters

    Jan 10, 2005 · Penalty $500

    Resolve
Show 3 more ↓
  • Hazardous

    Work w/out a permit hazardous work noted:having illegally removed and erected full partition walls,new plumbing installation also observed work is being performed in apts on 2nd thru 4th fours while bldg is sti

    Jul 13, 2004

    Resolve
  • Hazardous

    Failuere to maintain adequate housekeeping: note a large amount of conbustable construction debris plywood, cardboard large black garbage bags of garbage lumber & wood with protruding nails stored in rear yard

    Jul 13, 2004

    Resolve
  • Hazardous

    Failure to safeguard public & property affected by construction operation: noted large partitions of fire-stopping illegally removed from walls & ceiling at various locations in apt on 2nd, 3rd & 4th fl leaving

    Jul 13, 2004

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Feb 3, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Nov 28, 2025 · Apt 6

    Close
  • Unsanitary condition

    Mold

    Nov 1, 2025 · Apt 6

    Close
  • Plumbing

    Water supply

    Mar 13, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 10, 2022 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    Jan 6, 2018 · Apt 2

    Close
  • Appliance

    Refrigerator

    Nov 7, 2017 · Apt 8

    Close
  • Unsanitary condition

    Pests

    Nov 7, 2017 · Apt 8

    Close
  • Unsanitary condition

    Pests

    Nov 7, 2017 · Apt 8

    Close
  • Unsanitary condition

    Mold

    Sep 26, 2017 · Apt 7

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Sep 19, 2017 · Apt 8

    Close
  • Unsanitary condition

    Mold

    Sep 18, 2017 · Apt 8

    Close
  • Unsanitary condition

    Mold

    Sep 18, 2017 · Apt 8

    Close
  • Appliance

    Refrigerator

    Jul 9, 2017 · Apt 8

    Close
  • Heat/hot water

    Apartment only

    Jul 9, 2017 · Apt 8

    Close
  • Heat/hot water

    Apartment only

    Feb 16, 2016 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Jan 6, 2016 · Apt 2F

    Close
  • Plumbing

    Water supply

    Jan 6, 2016 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Jan 5, 2016 · Apt 2F

    Close
  • Plumbing

    Water supply

    Jan 5, 2016 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Dec 17, 2015 · Apt 2F

    Close
  • Plumbing

    Water supply

    Dec 17, 2015 · Apt 2F

    Close
  • Plumbing

    Toilet

    Dec 17, 2015 · Apt 2F

    Close
  • Plumbing

    Water supply

    Dec 17, 2015 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Sep 25, 2015 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2015 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Dec 26, 2014 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Dec 26, 2014 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2014 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2014 · Apt 2F

    Close
  • General

    Bell/buzzer/intercom

    Nov 13, 2014 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Nov 9, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 8, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 8, 2014 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Nov 7, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2014 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2014 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 2, 2014 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Oct 23, 2014 · Apt 2F

    Close
  • Electric

    Lighting

    Oct 23, 2014 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Oct 23, 2014 · Apt 2F

    Close
  • Plumbing

    Radiator

    Oct 23, 2014 · Apt 2F

    Close
  • Plumbing

    Radiator

    Oct 23, 2014 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Oct 23, 2014 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Oct 23, 2014 · Apt 2F

    Close
  • Door/window

    Window frame

    Oct 23, 2014 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Oct 23, 2014 · Apt 2F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1892
Floors
4
Residential units
9
Building area
6,320 ft²
Lot area
2,107 ft²
Zoning
R6A
Community board
303
Council district
36
Block / lot
1666 / 43
Assessed value
$849,600
Landmark / historic district
Bedford Stuyvesant / Expanded Stuyvesant Heights Historic District

HPD registration #306197, last renewed Sep 24, 2025.

Questions about 266 Malcolm X Boulevard

Who owns 266 Malcolm X Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Fc 266 LLC.

Does 266 Malcolm X Boulevard have violations?

Yes. NYC HPD has recorded 103 housing violations at this property.

Is 266 Malcolm X Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 266 Malcolm X Boulevard built?

City records list 1892 as the year it was built.

How many apartments are in 266 Malcolm X Boulevard?

It has 9 residential units and 10 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.