266 Malcolm X Boulevard
Brooklyn, NY 11233BBL 3-01666-0043Map
Owner of record: Fc 266 LLC
266 Malcolm X Boulevard is a walk-up apartment building built in 1892 in Brooklyn, 11233. It has 9 residential units across 4 floors. The owner of record is Fc 266 LLC. HPD has recorded 103 housing violations here, most recently on December 4, 2025. 2 of the 50 most recent violations are still open.
- HPD violations
- 103
- DOB violations
- 19
- ECB violations
- 13
- HPD complaints
- 336
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 103
- BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall in the 2nd room from east located at apt 6, 3rd story, 1st apartment from north at east
Dec 4, 2025 · Apt 6
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall in the 1st room from east located at apt 6, 3rd story, 1st apartment from north at east
Dec 4, 2025 · Apt 6
Open — Notice of issuance sent to tenant - CImmediately hazardous
Remove the illegal fastening padlockable eyes at bldg entrance metal door , 1st story
Nov 26, 2017
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector ''defective'' in the entire apartment located at apt 7, 3rd story, 1st apartment from west at north
Oct 5, 2017 · Apt 7
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). ''defective'' in the entire apartment located at apt 7, 3rd story, 1st apartment from west at north
Oct 5, 2017 · Apt 7
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 21, 2017
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 21, 2017
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Sep 21, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 21, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Sep 21, 2017
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 21, 2017
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 21, 2017
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 21, 2017
Closed — Violation dismissed - BHazardous
Provide adequate lighting for ceiling light fixtue 60 watts at public hall, 2nd story
Jan 10, 2016
Closed — Violation closed - CImmediately hazardous
Replace with new the missing stair case between 2nd sty 3rd sty at public hall stairs
Jan 10, 2016
Closed — Violation closed - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north
Jan 10, 2016 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Jan 10, 2016
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Jan 10, 2016 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door to cellar locked, at public hall, 1st story
Nov 20, 2014
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water to apartment fixtures, in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Nov 20, 2014 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Nov 20, 2014 · Apt 2L
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2l, 2nd story, 1st apartment from east at south
Nov 13, 2014 · Apt 2L
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of 170 degrees of scalding hot water in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Nov 13, 2014 · Apt 2L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 2l, 2nd story, 1st apartment from east at south
Nov 13, 2014 · Apt 2L
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3f, 3rd story, 2nd apartment from west at north
Nov 12, 2014 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 2f, 2nd story, 1st apartment from west at north
Nov 12, 2014 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling ceiling in the kitchen located at apt 3f, 3rd story, 2nd apartment from west at north
Nov 12, 2014 · Apt 3F
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceramic tile floor in the kitchen located at apt 3f, 3rd story, 2nd apartment from west at north
Nov 12, 2014 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the broken or defective inter com system. in the entire apartment located at apt 3f, 3rd story, 2nd apartment from west at north
Nov 12, 2014 · Apt 3F
Closed — Violation closed - BHazardous
Replace with new the missing radiator shut off valve. in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from east at south
Nov 12, 2014 · Apt 2L
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Nov 12, 2014 · Apt 2L
Closed — Violation closed - ANon-hazardous
Refit west door in the entrance located at apt 2l, 2nd story, 1st apartment from west at north
Nov 12, 2014 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 2l, 2nd story, apartment at south
Nov 12, 2014 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Refit base cabinet door at sink in the kitchen located at apt 2l, 2nd story, apartment at south
Nov 12, 2014 · Apt 2L
Closed — Violation closed - ANon-hazardous
Refit windows in the 1st room from east located at apt 2l, 2nd story, 1st apartment from east at south
Nov 12, 2014 · Apt 2L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 2f, 2nd story, 1st apartment from west at north
Nov 12, 2014 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection at radiator in the 1st room from east located at apt 2f, 2nd story, 1st apartment from west at north
Nov 12, 2014 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 2nd room from east located at apt 2f, 2nd story, 1st apartment from west at north
Nov 12, 2014 · Apt 2F
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 3f, 3rd story, 2nd apartment from west at north
Nov 12, 2014 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 2f, 2nd story, 1st apartment from west at north
Nov 12, 2014 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, west wall in the kitchen located at apt 3f, 3rd story, 2nd apartment from west at north
Nov 12, 2014 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed at ceiling in the 2nd room from east located at apt 2f, 2nd story, 1st apartment from west at north
Nov 12, 2014 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire rated ceiling at public hall, 1st story
Nov 12, 2014
Closed — Violation closed - BHazardous
Replace with new the missing vestibule door. at public hall, 1st story
Nov 12, 2014
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire rated material south wall at public hall, 3rd story
Nov 12, 2014
Closed — Violation closed - BHazardous
Properly secure the loose loose treads 5 and 6 up from at public hall stairs, 2nd story
Nov 12, 2014
Closed — Violation closed - BHazardous
Properly secure the loose wood tread 5 and 6 up from bottom at public hall, 2nd story
Nov 12, 2014
Closed — Violation closed - BHazardous
Replace with new the missing newel post cap at public hall stairs, 1st story
Nov 12, 2014
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north
Nov 12, 2014 · Apt 2F
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceramic tile floor in the bathroom located at apt 3f, 3rd story, 2nd apartment from west at north
Nov 12, 2014 · Apt 3F
Closed — Violation closed
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 13
- Class - 3
Failure to maintain building in a code compliant manner: public facility signage per pc 403.4 noted: at establishment (trad room) located on the ground floor, has (2) public single occupant restrooms that are n
Aug 26, 2019
Resolve - Class - 2
Failure to maintain bldg walls.noted at exp1 front along malcolm x blvd. masonry brick between 1st and 2nd flr. exterior has become deteriorated and now starting to bulge outward mortar is missing and section
Dec 5, 2014 · Penalty $500
Resolve - Non-hazardous
Failure to obtain a shed permit.note:a sidewalk shop approx 32"long installed at front of bldg w/o permit.remedy:obtain permit
Dec 6, 2006 · Penalty $400
Resolve - Hazardous
Failure to maintain:wood cornice at front of bldg 1st fl is in disrepair w/ loose unsecured wood sections. remedy:maintain bldg.
Aug 8, 2006 · Penalty $2,000
Resolve - Hazardous
Failure to maintain note: 1. excessive debris, old plaster metal sinksapprox 10 cu yds of debris dumped at rear yard at base of fire escape 2.1st fl wood cornice is in disrepair with loose unsecured sections
Apr 14, 2006 · Penalty $2,000
Resolve - Hazardous
Exit passageway or corridor: total obstruction. secondary egress at 1st fl & fire escape ladder is totaly obstructed by trash & other debris that encompasses the entire rear yd approx. 30'ft long by 20'ft wide
Feb 3, 2006 · Penalty $500
Resolve - Hazardous
Failure to maintain noted: the rear yard consist of piles of rubish, including construction debris same debris, obstructing the use of fire escape in the event of an emergency. noted: this building is present
Dec 5, 2005 · Penalty $2,500
Resolve - Hazardous
Failure to maintain. noted defect: accumulation of construction debris and rubbish,lumber,light fixtures,plastic pails, household rubbish, compiled in approx. 12w x 10l x 5 ht. mound form. noted location:rear y
Apr 20, 2005
Resolve - Hazardous
Failure to maintain adequate housekeeping: large amount of debris being stored at rear yard and 1st floor store: debris includes but not limited to wood, garbage bags, lumber, metal studs, compound camsters,
Jan 10, 2005
Resolve - Hazardous
Failure to maintain adequate housekeeping: large amount of debris being stored at rear yard and 1st floor store. debris includes but not limited to wood, garbage bags, lumber, metal studs, compound canisters
Jan 10, 2005 · Penalty $500
Resolve
Show 3 more ↓
- Hazardous
Work w/out a permit hazardous work noted:having illegally removed and erected full partition walls,new plumbing installation also observed work is being performed in apts on 2nd thru 4th fours while bldg is sti
Jul 13, 2004
Resolve - Hazardous
Failuere to maintain adequate housekeeping: note a large amount of conbustable construction debris plywood, cardboard large black garbage bags of garbage lumber & wood with protruding nails stored in rear yard
Jul 13, 2004
Resolve - Hazardous
Failure to safeguard public & property affected by construction operation: noted large partitions of fire-stopping illegally removed from walls & ceiling at various locations in apt on 2nd, 3rd & 4th fl leaving
Jul 13, 2004
Resolve
Complaints
- Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Nov 28, 2025 · Apt 6
Close - Unsanitary condition
Mold
Nov 1, 2025 · Apt 6
Close - Plumbing
Water supply
Mar 13, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 10, 2022 · Apt 9
Close - Heat/hot water
Apartment only
Jan 6, 2018 · Apt 2
Close - Appliance
Refrigerator
Nov 7, 2017 · Apt 8
Close - Unsanitary condition
Pests
Nov 7, 2017 · Apt 8
Close - Unsanitary condition
Pests
Nov 7, 2017 · Apt 8
Close - Unsanitary condition
Mold
Sep 26, 2017 · Apt 7
Close
Show 40 more ↓
- Unsanitary condition
Mold
Sep 19, 2017 · Apt 8
Close - Unsanitary condition
Mold
Sep 18, 2017 · Apt 8
Close - Unsanitary condition
Mold
Sep 18, 2017 · Apt 8
Close - Appliance
Refrigerator
Jul 9, 2017 · Apt 8
Close - Heat/hot water
Apartment only
Jul 9, 2017 · Apt 8
Close - Heat/hot water
Apartment only
Feb 16, 2016 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 6, 2016 · Apt 2F
Close - Plumbing
Water supply
Jan 6, 2016 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 5, 2016 · Apt 2F
Close - Plumbing
Water supply
Jan 5, 2016 · Apt 2F
Close - Plumbing
Basin/sink
Dec 17, 2015 · Apt 2F
Close - Plumbing
Water supply
Dec 17, 2015 · Apt 2F
Close - Plumbing
Toilet
Dec 17, 2015 · Apt 2F
Close - Plumbing
Water supply
Dec 17, 2015 · Apt 2F
Close - Paint/plaster
Ceiling
Sep 25, 2015 · Apt 2F
Close - Heat/hot water
Entire building
Feb 20, 2015 · Apt 2F
Close - Unsanitary condition
Pests
Dec 26, 2014 · Apt 3L
Close - Unsanitary condition
Pests
Dec 26, 2014 · Apt 3L
Close - Heat/hot water
Entire building
Nov 19, 2014 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 13, 2014 · Apt 2F
Close - General
Bell/buzzer/intercom
Nov 13, 2014 · Apt 2F
Close - Heat/hot water
Entire building
Nov 9, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2014 · Apt 3L
Close - Heat/hot water
Entire building
Nov 7, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2014 · Apt 2F
Close - Heat/hot water
Entire building
Nov 4, 2014 · Apt 2L
Close - Heat/hot water
Entire building
Nov 3, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2014 · Apt BLDG
Close - General
Bell/buzzer/intercom
Oct 23, 2014 · Apt 2F
Close - Electric
Lighting
Oct 23, 2014 · Apt 2F
Close - Heat/hot water
Entire building
Oct 23, 2014 · Apt 2F
Close - Plumbing
Radiator
Oct 23, 2014 · Apt 2F
Close - Plumbing
Radiator
Oct 23, 2014 · Apt 2F
Close - Unsanitary condition
Pests
Oct 23, 2014 · Apt 2F
Close - Unsanitary condition
Pests
Oct 23, 2014 · Apt 2F
Close - Door/window
Window frame
Oct 23, 2014 · Apt 2F
Close - Paint/plaster
Ceiling
Oct 23, 2014 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1892
- Floors
- 4
- Residential units
- 9
- Building area
- 6,320 ft²
- Lot area
- 2,107 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1666 / 43
- Assessed value
- $849,600
- Landmark / historic district
- Bedford Stuyvesant / Expanded Stuyvesant Heights Historic District
HPD registration #306197, last renewed Sep 24, 2025.
Questions about 266 Malcolm X Boulevard
Who owns 266 Malcolm X Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Fc 266 LLC.
Does 266 Malcolm X Boulevard have violations?
Yes. NYC HPD has recorded 103 housing violations at this property.
Is 266 Malcolm X Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 266 Malcolm X Boulevard built?
City records list 1892 as the year it was built.
How many apartments are in 266 Malcolm X Boulevard?
It has 9 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.