233 Malcolm X Boulevard
Brooklyn, NY 11233BBL 3-01662-0010Map
Owner of record: Fc 656 LLC
233 Malcolm X Boulevard is a walk-up apartment building built in 1910 in Brooklyn, 11233. It has 9 residential units across 4 floors. The owner of record is Fc 656 LLC. HPD has recorded 18 housing violations here, most recently on September 2, 2026. 13 of the 18 most recent violations are still open.
- HPD violations
- 18
- DOB violations
- 11
- ECB violations
- 6
- HPD complaints
- 22
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at cellar
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft observed at ceiling at laundry room, at cellar
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the soffit at public hall stairs, 1st story
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing frame at public hall, 1st story
Sep 2, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar
Sep 2, 2026
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at cellar
Sep 2, 2026
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Sep 2, 2026 · Apt 1
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Sep 2, 2026 · Apt 1
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Sep 2, 2026 · Apt 1
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Sep 2, 2026 · Apt 1
Open — Civ14 mailed
Show 8 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak the soffit at public hall stairs, 1st story
Sep 2, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant material at soffit at public hall stairs, 1st story
Sep 2, 2026
Open — Nov certified on time - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 28, 2016
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 28, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 28, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.
May 28, 2016
Closed — Violation dismissed
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Construction other optional
Hazardous
Aug 31, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 6
- Class - 2
Sec. 3314.6.1 supported scaffold not tied into the bldg. noted: at time of my inspection the supported scaffold erected at exp#3 was approx 26 feet in height. this scaffold was not tied into the bldg at all.
Jun 13, 2015 · Penalty $400
Resolve - Class - 1
Sec. 3314.8.1 pswo(supported scaffold)guardrail systems. noted: at time of inspection supported scaffold on exp#3 is missing the following 1)end rails 2)mid rails 3)top rails 4)toe boards. remedy: comply w/cod
Jun 13, 2015 · Penalty $400
Resolve - Class - 2
Sec. 3314.5 platform construction. platforms on all working levels of a scaffold shall be fully planked or decked. noted: at time of inspeciton supported scaffold is missing planking on all working levels.
Jun 13, 2015 · Penalty $400
Resolve - Class - 2
Sec. 3314.13.1 supported scaffold missing bracing(cross bracing). frames shall be braced by cross,horizontal or diagonal braces or a combination(thruout)which secure vertical members together laterally. noted:
Jun 13, 2015 · Penalty $400
Resolve - Hazardous
Failure to maintain defect is stairway between 1st and 3rd floor landing is pulling away out of plumb area sagging.(treads and resets)remdedy:make safe immediately obtain necessary permits maintain building.
Aug 31, 2000 · Penalty $800
Resolve - Non-hazardous
Altered building occupied without a valid cofo for alteration type i# 3p0007246. first floor commercial space as well as several of the upper floor apartments are occupied. remedy:obtain a valid cofo.
Dec 17, 1993 · Penalty $350
Resolve
Complaints
- Unsanitary condition
Mold
Aug 16, 2026 · Apt 1
Close - Water leak
Damp spot
Aug 16, 2026 · Apt 1
Close - Water leak
Slow leak
Aug 16, 2026 · Apt 1
Close - Unsanitary condition
Mold
Aug 16, 2026 · Apt 1
Close - Unsanitary condition
Mold
Feb 9, 2026 · Apt 9
Close - Door/window
Door
Feb 9, 2026 · Apt 9
Close - General
Bell/buzzer/intercom
Feb 9, 2026 · Apt 9
Close - General
Ventilation system
Feb 9, 2026 · Apt 9
Close - Door/window
Window frame
Feb 9, 2026 · Apt 9
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt 3J
Close
Show 12 more ↓
- Unsanitary condition
Sewage
Mar 24, 2022 · Apt 6
Close - Plumbing
Water supply
Mar 24, 2022 · Apt 6
Close - Heat/hot water
Entire building
Mar 13, 2017 · Apt 1A
Close - Heat/hot water
Entire building
May 26, 2016 · Apt 2
Close - Heat/hot water
Entire building
Apr 5, 2016 · Apt 8
Close - Door/window
Door
May 21, 2014 · Apt 3
Close - Plumbing
Water supply
May 21, 2014 · Apt 3
Close - Door/window
Window frame
May 21, 2014 · Apt 3
Close - Heating
Heat related
Jan 25, 2014 · Apt 2
Close - Plumbing
Water supply
Aug 11, 2011 · Apt 1C
Close - Heating
Heat related
Jan 15, 2009 · Apt 3
Close - Heating
Heat related
Oct 24, 2006 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 4
- Residential units
- 9
- Building area
- 5,720 ft²
- Lot area
- 1,760 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1662 / 10
- Assessed value
- $466,200
- Landmark / historic district
- No
HPD registration #348064, last renewed Oct 31, 2025.
Questions about 233 Malcolm X Boulevard
Who owns 233 Malcolm X Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Fc 656 LLC.
Does 233 Malcolm X Boulevard have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 233 Malcolm X Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 233 Malcolm X Boulevard built?
City records list 1910 as the year it was built.
How many apartments are in 233 Malcolm X Boulevard?
It has 9 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.