906 Gates Avenue
Brooklyn, NY 11221BBL 3-01637-0027Map
Owner of record: Fajeza Industries LLC
906 Gates Avenue is a mixed residential and retail building built in 1931 in Brooklyn, 11221. It has 2 residential units across 3 floors. The owner of record is Fajeza Industries LLC. HPD has recorded 11 housing violations here, most recently on September 15, 2005.
- HPD violations
- 11
- DOB violations
- 12
- ECB violations
- 30
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- BHazardous
Make safe by properly repairing the structural defect. wood beams replacing lolly columns supporting main horizontal floor beam in cellar
Sep 15, 2005
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood cornice at rear east side bldg.
Sep 15, 2005
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective loose stairs rear, all stys.
Sep 15, 2005
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective loose & bulging brick wall at 1st sty. eastside.
Sep 15, 2005
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective masonary wall at exterior east throughout.
Sep 15, 2005
Closed — Violation closed - CImmediately hazardous
Provide temporary reseal all accessible openings.
Sep 15, 2005
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective cement wash over front entrance door to bldg
May 6, 2004
Closed — Violation closed - BHazardous
Replace with new the missing drain pipe front of bldg
May 6, 2004
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective stucco, rear wall of bldg throughout.
May 6, 2004
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of refrigerator household articles, 1st sty. public hall.
May 6, 2004
Closed — Violation closed
Show 1 more ↓
- BHazardous
Make safe by properly repairing the structural defect. bulging brick work rear east exterior wall.
May 6, 2004
Closed — Violation closed
DOB building violations · 12
- Immediate emergency anythingoptional
Fully demolish the remainder of the building
Jan 6, 2023
Dob violation - dismissed - Construction other optional
Work w/o permit served for owner failed to submit an application for a permit within 2 business days after the commencement of the emergency work per ac 28-105.4.1.
Nov 10, 2022
Dob violation - dismissed - Immediate emergency anythingoptional
.fully demolish the building
Oct 26, 2022
Dob violation - dismissed - Construction other optional
At time of inspection observed building has multiple structural defects which now fail to maintained building & protect adjacent properties in code complaint manner, and is issued ied by fed to be full demo base on foundation is bowing into adjacent property 908 gates ave.
Oct 13, 2022
Dob violation - dismissed - Construction other optional
Emergency work-bldg in state of disrepair.front wall partial collapsed remainder of front wall severly rotted & displaced.east wall severly bowing @ 1fl.bldg shifted/racked.severe water damage thruout immed demo bldg under direct & continuous pe supervision.pe sbmt means/method by eod 10/14/22.file prmt w/i 48hrs of wrk
Oct 13, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 29, 2017
Dob violation - active - Unsafe buildings none
Ub-unsafe buildings none
Oct 5, 2017
Dob violation - dismissed - Immediate emergency anythingoptional
Erect tight board at exposure 1(approx 25'linear)ft, erect sidewalk shed at exposure 1 (approx.25' linear ft)
Sep 13, 2017
Dob violation - dismissed - Plumbing none
P-plumbing none
May 23, 2000
Dob violation - active - Construction other optional
C-construction other optional
Jun 24, 1998
Vw-violation work without permit - active
Show 2 more ↓
- Emergency none
Egncy-emergency none
Jun 10, 1998
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Aug 30, 1996
V%*-dob violation - dismissed
ECB violations · 30
- Class - 1
At the time of my inspection, i observed 4 workers doing water proving to adjacent properties at exposure #2 and 4, with a mechanical man lift, commissioner order declare full demolition on 01-06-2022 and 0rde
Feb 7, 2023 · Penalty $2,500
Resolve - Class - 1
At the time of my inspection i observed unsafe building. no construction activity on the site. failure to comply with commissioner's order. stop all interior and demolition work.
Jan 4, 2023 · Penalty $12,500
Active - Class - 1
At the time of my inspection i observed no construction activity on the site during immediate emergency demolition which contrary to commissioner's order.
Dec 12, 2022 · Penalty $25,000
Active - Class - 1
At the time of my inspection i observed no construction work during immediate emergency demolition. unlawful act. failure to comply commissioner's order.stop all work on entire site.
Nov 29, 2022 · Penalty $12,500
Active - Class - 2
Work without permit.upon inspection of compliant #3672371 i noticed a construction fence on site without a permit.there isnt a permit in thedob system or posted on site.non compliant to code.rem:obtain all perm
Oct 23, 2018 · Penalty $6,250
Active - Class - 2
Jobsite fence not constructed or maintained pursuant to subsection.upon inspection of compliant #3672371.i noted the side panel on the rightside of the construction fence is damaged and not properly enclose the
Oct 23, 2018 · Penalty $2,000
Resolve - Class - 2
Sec. 1101.2 failure to comply w/storm water drainage requirement roof paved area or yard. roof leader or downspout running from roof to grade is not connected to any dry well or drainage system. observed discon
Sep 6, 2018 · Penalty $6,250
Active - Class - 3
Failure to maintain builidng in a code compliant manner.observed greenplywood construction fence at exposure 1 with a panel broken open and disconnected.also observed a 2nd panel at front of expo 4 side broken
May 19, 2018 · Penalty $250
Resolve - Class - 2
Failure to post permit or properly post permit for work at premises note: at time of inspection sidewalk shed on site no permit posted in any conspicuous place. rmdy: post permit.
Apr 17, 2018 · Penalty $3,125
Active - Class - 2
Project information panel/sidewalk shed parapet panel sign not provided. noted: at time of inspection on sign on sidewalk shed parapet panelat all. rmdy: comply with code.
Apr 17, 2018 · Penalty $3,125
Resolve
Show 20 more ↓
- Class - 2
Work w/o a permit. noted: at time of inspection construction fence on site w/o a permit. rmdy: obtain all required permits.
Apr 17, 2018 · Penalty $6,250
Active - Class - 2
Failure to post permit or properly post permit for work at premises.noted:at time of inspection sidewalk shed on site no permits posted in any conspicuous place at site.rem:post/properly post permit.
Mar 6, 2018 · Penalty $8,000
Active - Class - 2
Project information panel/sidewalk shed parapet panel sign not provided.noted:at time of inspection no sign on sidewalk shed parapet panel at all.rem:comply with code.
Mar 6, 2018 · Penalty $2,000
Resolve - Class - 2
Work without a permit.noted:at time of inspection construction fence on site without a permit.rem:obtain all required permits.
Mar 6, 2018 · Penalty $8,000
Active - Class - 2
Failure to maintain building in code compliant manner. at exp#1, building front facade is bulging with section pulling away from the struc ture. bldg condition is safeguard by sidewalk shed erected under job #
Dec 12, 2017 · Penalty $1,250
Resolve - Class - 2
Failure to provide parapet sign panel. note: at time of inspection observed sidewalk shed in place w/o project information panel sidewalk shed parapet panel/construction sign not provided. remedy: comply w/code
Dec 8, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to post of properly post permit for temporary equipment on site. note: at time of inspection observed sidewalk shed in place,no permit posted in any conspicuous place at construction site. remedy: post
Dec 8, 2017 · Penalty $4,000
Active - Class - 2
Pedestrian protection does not meet code specs. note: at time of inspection observed sidewalk shed in place w/the following violating conditions-cross braces rotting away & some horizonal as well-mud sill in de
Dec 8, 2017 · Penalty $5,000
Resolve - Class - 2
Pedestrian protection does not meet code specification.note:observed sidewalk shed lights are not operating at time of inspection 9:15pm that does not meet code specification #3307.6.4.8.rem:comply with code.
Nov 24, 2017 · Penalty $5,000
Resolve - Class - 2
Work without a permit.temp.construction equipment on site without a permit.note:observed construction site fence is in place.no permit on file.rem:obtain permit.
Nov 24, 2017 · Penalty $4,000
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35264054m issued on 08/29/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner. note at exp#
Nov 3, 2017 · Penalty $4,000
Resolve - Class - 2
Pedestrian protection does not meet code specification. noted: observed sidewalk shed lights are not operating at time of inspection 9pm. that does not meet code specification # 3307.6.4.8. rem: comply with cod
Oct 16, 2017 · Penalty $5,000
Resolve - Class - 1
Failure to maintain building in code-compliant manner. at the time of inspection it was observed and that section of the facade at exposure 1 bulge with section pulling away from the structure. rem: repair and/
Aug 29, 2017 · Penalty $5,000
Active - Class - 3
Failure to maintain bldg in code compliant manner.defects exterior front exp#2 leader a side wall hole in pipe.rem:repair &/or replace.
Jul 20, 2016 · Penalty $250
Resolve - Class - 3
Failure to maintain building in code compliant manner. note:at the north side of premises the leader coming from the roof gutter does not terminate in a storm drainage system as required by ll103/89. rem:repair
Feb 11, 2012 · Penalty $500
Resolve - Non-hazardous
Work w/o a permit: as noted: at a three storied brick framed structurewood structural members were erected to form a roof approx. 10' x 15' and 8' in height horizontally connected to the rear of adjacent proper
Mar 17, 2006 · Penalty $2,500
Active - Non-hazardous
Failure to maintain plumbing(non hazardous)storm water not being disposed of properly roof leaders not connected to bldg.house drain.remedy:maintain plumbing,connect leaders as per n.y.c.code.
May 23, 2000 · Penalty $2,500
Active - Hazardous
Failure to maintain. defect is: building leaning our of plumb to the east also the exterior siding is rotted and pulling away allowing fire stopping bricks to fall on adjoining property. (908 gates). remedy: ma
Jun 26, 1998 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit.(work noted) new partitions are being erected at 3rd story rear. and re location of door entrance to rear bedroom. new sheet rock ceiling are being installed on the entire 3rd floor. remed
Jun 4, 1998
Resolve - Non-hazardous
Occupancy contrary to that allowed by building dept records aka hpd occupancy and arrangement record two family dwelling now occupied as a singles room occupancy at 2 3 floors remedy: discontinue illegal use or
Aug 30, 1996 · Penalty $400
Resolve
Complaints
No HPD complaints in our records
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 25, 2026 | Non-market transfer | Tax class 1 vacant land | — |
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 2
- Building area
- 2,780 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1637 / 27
- Assessed value
- $90,840
- Landmark / historic district
- No
Questions about 906 Gates Avenue
Who owns 906 Gates Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Fajeza Industries LLC.
Does 906 Gates Avenue have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 906 Gates Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 906 Gates Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 906 Gates Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.