561 Lexington Avenue
Brooklyn, NY 11221BBL 3-01619-0184Map
Owner of record: James Robinson
561 Lexington Avenue is a two-family home built in 2002 in Brooklyn, 11221. It has 2 residential units across 2 floors. The owner of record is James Robinson. HPD has recorded 69 housing violations here, most recently on April 16, 2021. 20 of the 50 most recent violations are still open.
- HPD violations
- 69
- DOB violations
- 1
- ECB violations
- 4
- HPD complaints
- 122
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 69
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 16, 2021
Open — Info nov sent out - CImmediately hazardous
Abate the nuisance consisting of stoop separating from building
Apr 13, 2021
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective concrete treshold at stoop building front
Apr 13, 2021
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections wash basin, water closet, shower stall and kitchen sink installed in the basement.
Aug 23, 2016
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range in the basement
Aug 23, 2016
Open — Nov sent out - ANon-hazardous
Abate the nuisance consisting of partitions erected creating kitchen in the basement
Aug 23, 2016
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible located at bsmt-apt bsmt lower level
Aug 23, 2016 · Apt BSMT
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet at the east wall in the 1st room from north at east located at apt bsmt lower level
Aug 23, 2016 · Apt BSMT
Open — Nov sent out - BHazardous
Properly secure the loose electrical outlet on the west wall , in the 1st room from north at east located at apt bsmt lower level
Aug 23, 2016 · Apt BSMT
Open — Nov sent out - BHazardous
Properly secure the loose electrical outlet at the east wall, in the 1st room from north at west located at apt bsmt lower level
Aug 23, 2016 · Apt BSMT
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly secure the loose cover at the base board radiator at north in the 1st room from north at west located at apt bsmt lower level
Aug 23, 2016 · Apt BSMT
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at the north wall in the 1st room from north at west located at apt bsmt lower level
Aug 23, 2016 · Apt BSMT
Open — Nov sent out - ANon-hazardous
Replace with new the missing closet at south in the 1st room from north at west located at apt bsmt lower level
Aug 23, 2016 · Apt BSMT
Open — Nov sent out - BHazardous
Replace with new the missing cover to base board radiator at north in the 1st room from north at east located at apt bsmt lower level
Aug 23, 2016 · Apt BSMT
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections located at bsmt-apt bsmt lower level
Aug 23, 2016 · Apt BSMT
Closed — Violation closed - ANon-hazardous
Abate the nuisance consisting of partitions erected creating bathroom in the basement
Aug 23, 2016
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 2, 2nd story
Feb 17, 2016 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell buzzer in the foyer located at apt 2, 2nd story
Feb 17, 2016 · Apt 2
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at east located at apt 2, 2nd story
Feb 17, 2016 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 2, 2nd story
Feb 17, 2016 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 3rd room from north at east located at apt 2, 2nd story
Jan 12, 2016 · Apt 2
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 2, 2nd story
Jan 12, 2016 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood door in the 1st room from north at east located at apt 2, 2nd story
Jan 12, 2016 · Apt 2
Open — Not complied with - BHazardous
Repair the roof so that it will not leak at ceiling, north and east walls in the 1st room from north at east located at apt 2, 2nd story
Jan 12, 2016 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling, north, and east walls in the 1st room from north at east located at apt 2, 2nd story
Jan 12, 2016 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at metal security door at entrance at public hall, 1st story
Nov 26, 2015
Open — Nov sent out - BHazardous
Replace with new the broken or defective cracked glass pane upper window sash in the 2nd room from east at south located at apt 2, 2nd story
Nov 26, 2015 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective cracked glass pane upper window sash in the 1st room from east at south located at apt 2, 2nd story
Nov 26, 2015 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling, north and east wall in the 1st room from north at east located at apt 2, 2nd story
Nov 26, 2015 · Apt 2
Open — Not complied with - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 2, 2nd story
Nov 26, 2015 · Apt 2
Closed — Violation closed - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2, 2nd story
Nov 7, 2015 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north at east located at apt 2, 2nd story
Nov 7, 2015 · Apt 2
Open — Not complied with - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 2, 2nd story
Nov 7, 2015 · Apt 2
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2, 2nd story
Nov 7, 2015 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the entire apartment located at apt 2, 2nd story
Nov 7, 2015 · Apt 2
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 2nd story
Nov 7, 2015 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from west at north
Oct 20, 2015 · Apt 2
Closed — Violation closed - BHazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 2, 2nd story
Oct 20, 2015 · Apt 2
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2, 2nd story, 1st apartment from west at north
Oct 20, 2015 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the smoke detector ..... located at apt 2, 2nd story, 1st apartment from west at north
Oct 20, 2015 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective upper glass pane at window in the 4th room from north at west located at apt 2, 2nd story
Oct 20, 2015 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Oct 20, 2015 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective upper glass pane at window in the 4th room from north at east located at apt 2, 2nd story, 1st apartment from west at north
Oct 20, 2015 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood door frame in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Oct 20, 2015 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Oct 20, 2015 · Apt 2
Closed — Violation closed - BHazardous
Properly secure the loose wood door, in the 1st room from north at east located at apt 2, 2nd story, apartment at north
Sep 25, 2015 · Apt 2
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2, 2nd story, apartment at north
Sep 25, 2015 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling, in the bathroom located at apt 2, 2nd story, apartment at north
Sep 25, 2015 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, apartment at north
Sep 25, 2015 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective window upper sash interior glass pane, in the 4th room from north located at apt 2, 2nd story, apartment at north
Sep 25, 2015 · Apt 2
Closed — Violation closed
DOB building violations · 1
- Construction other optional
Observed front exterior platform & steps is slope, sinking & pulling away front the building.
Mar 7, 2024
Dob violation - active
ECB violations · 4
- Class - 1
Failure to maintain building wall(s) or appurtenances. rca not corrected and past due 60 days issued 3/07/24 by #2701 who noted: front exterior platform & steps are sloped, sinking and pulling away front the bu
Aug 20, 2024 · Penalty $12,500
Active - Class - 2
Occupancy contrary to that allowed by cofo and dob records. partitionserected creating illegal use of rooms for living at basement. unlawfulcooking range and kitchen sink prsent. also full bathroom present comp
Aug 23, 2016 · Penalty $6,000
Active - Class - 2
Failure to maintain bldg in code complaint manner. note at front of bldg the concrete stoop is displaced leaning out of plumb & the front yard is sinking. remedy: repair &/or replace.
Sep 27, 2015 · Penalty $2,500
Active - Non-hazardous
Occupancy contrary to that allowed by the c of o note c of o 300244741 dated 5/8/95 indicated that the 1st fl and 2nd fl is 2 family apt (one on each fl) at time of inspection the entrance hall and one room at
Feb 25, 2008
Resolve
Complaints
- Door/window
Door
Sep 11, 2021 · Apt 2FLOOR
Close - Unsanitary condition
Mold
Sep 11, 2021 · Apt 2FLOOR
Close - Plumbing
Toilet
Sep 11, 2021 · Apt 2FLOOR
Close - Paint/plaster
Wall
Sep 11, 2021 · Apt 2FLOOR
Close - Paint/plaster
Ceiling
Sep 11, 2021 · Apt 2FLOOR
Close - Plumbing
Water supply
Sep 11, 2021 · Apt 2FLOOR
Close - Unsanitary condition
Pests
Sep 11, 2021 · Apt 2FLOOR
Close - Unsanitary condition
Mold
Aug 23, 2021 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 23, 2021 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Aug 23, 2021 · Apt 2NDFLO
Close
Show 40 more ↓
- Door/window
Door frame
Aug 23, 2021 · Apt 2NDFLO
Close - Door/window
Door
Aug 23, 2021 · Apt 2NDFLO
Close - Paint/plaster
Wall
Aug 23, 2021 · Apt 2NDFLO
Close - Plumbing
Toilet
Aug 23, 2021 · Apt 2NDFLO
Close - General
Signage missing
Apr 9, 2021 · Apt BLDG
Close - Water leak
Heavy flow
Dec 30, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Dec 30, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Dec 30, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Dec 30, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Dec 30, 2016 · Apt 2
Close - Water leak
Heavy flow
Dec 29, 2016 · Apt 2
Close - Safety
Carbon monoxide detector
Dec 29, 2016 · Apt 2
Close - Safety
Smoke detector
Dec 29, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Dec 29, 2016 · Apt 2
Close - Heat/hot water
Apartment only
Dec 29, 2016 · Apt 2
Close - Door/window
Door
Dec 29, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Dec 29, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Dec 29, 2016 · Apt 2
Close - Unsanitary condition
Mold
Dec 29, 2016 · Apt 2
Close - Heat/hot water
Apartment only
Dec 28, 2016 · Apt BSMT
Close - General
Cabinet
Aug 18, 2016 · Apt BSMT
Close - Door/window
Door
Aug 18, 2016 · Apt BSMT
Close - Plumbing
Toilet
Aug 18, 2016 · Apt BSMT
Close - Paint/plaster
Ceiling
Aug 18, 2016 · Apt BSMT
Close - Water leak
Slow leak
Aug 18, 2016 · Apt BSMT
Close - Door/window
Door
Aug 18, 2016 · Apt BSMT
Close - Unsanitary condition
Mold
Aug 18, 2016 · Apt BSMT
Close - Plumbing
Radiator
Aug 18, 2016 · Apt BSMT
Close - Flooring/stairs
Floor
Aug 18, 2016 · Apt BSMT
Close - Electric
Outlet/switch
Aug 18, 2016 · Apt BSMT
Close - Heat/hot water
Apartment only
Feb 23, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Feb 23, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Feb 23, 2016 · Apt 2
Close - Safety
Smoke detector
Feb 23, 2016 · Apt 2
Close - Door/window
Door
Feb 23, 2016 · Apt 2
Close - Water leak
Slow leak
Feb 23, 2016 · Apt 2
Close - General
Bell/buzzer/intercom
Feb 23, 2016 · Apt 2
Close - Heat/hot water
Apartment only
Feb 23, 2016 · Apt 2
Close - Water leak
Slow leak
Feb 23, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Feb 16, 2016 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 2002
- Floors
- 2
- Residential units
- 2
- Building area
- 2,805 ft²
- Lot area
- 1,983 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1619 / 184
- Assessed value
- $73,500
- Landmark / historic district
- No
Questions about 561 Lexington Avenue
Who owns 561 Lexington Avenue?
The owner of record in NYC Department of City Planning PLUTO data is James Robinson.
Does 561 Lexington Avenue have violations?
Yes. NYC HPD has recorded 69 housing violations at this property.
Is 561 Lexington Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 561 Lexington Avenue built?
City records list 2002 as the year it was built.
How many apartments are in 561 Lexington Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.