roofy

1198 Broadway

Brooklyn, NY 11221BBL 3-01613-0016Map

Owner of record: 1200 Nyllc

1198 Broadway is a hotel built in 2017 in Brooklyn, 11221. The owner of record is 1200 Nyllc. HPD has recorded 51 housing violations here, most recently on May 11, 2026. 45 of the 50 most recent violations are still open.

HPD violations
51
DOB violations
10
ECB violations
36
HPD complaints
33

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 51

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 11, 2026

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 24, 2025

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 16, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 4, 2024

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 18, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 28, 2023

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2022

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 17, 2022

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 21, 2021

    Open — Info nov sent out
Show 40 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 8, 2019

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Jan 10, 2018

    Open — Info nov sent out
  • B

    Properly repair the broken or defective electrical outlet at south wall in the 2nd room from north located at apt 1fl, 1st story

    Sep 25, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story

    Sep 25, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling apprx 4 square feet in the kitchen located at apt 1fl, 1st story

    Sep 25, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1fl, 1st story

    Sep 25, 2013 · Apt 1FL

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1fl, 1st story

    Sep 25, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the bathroom located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • C

    Replace with new the missing 4 balusters at public hall stairs, 1st story

    Sep 1, 2013

    Closed — Violation closed
  • B

    Properly repair the broken or defective ceiling light fixture in the kitchen located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair the broken or defective electrical switch at west wall at public hall, 1st story

    Sep 1, 2013

    Open — Nov sent out
  • C

    Remove all obstructions from water closet .. in the bathroom located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin flies in the entire apartment located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 2 sq.ft. in the bathroom located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 2 sq.ft. in the kitchen located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Replace with new the missing door knob at front entrance door to building at public hall, 1st story

    Sep 1, 2013

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the kitchen located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair the broken or defective wall and base cabinets in the kitchen located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    § 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy in the entire apartment located at apt 1fl, 1st story, apartment at west

    Sep 1, 2013 · Apt 1FL

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2fl, 2nd story

    Aug 3, 2012 · Apt 2FL

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color at west wall in the 2nd room from north located at apt 2fl, 2nd story, 1st apartment from west at north

    Aug 3, 2012 · Apt 2FL

    Open — Nov sent out
  • A

    Replace with new the missing electrical outlet cover at east wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from west at north

    Aug 3, 2012 · Apt 2FL

    Open — Nov sent out
  • C

    Remove the illegal fastening lockable slide bolt in the entrance located at apt 2fl, 2nd story, 1st apartment from west at north

    Aug 3, 2012 · Apt 2FL

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the 1st room from north located at apt 2fl, 2nd story, 1st apartment from west at north

    Aug 3, 2012 · Apt 2FL

    Open — Nov sent out
  • B

    Properly repair the broken or defective counterbalance at upper window sash at north wall in the 1st room from north located at apt 2fl, 2nd story

    Aug 3, 2012 · Apt 2FL

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 2fl, 2nd story, 1st apartment from west at north

    Aug 3, 2012 · Apt 2FL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north

    Aug 3, 2012 · Apt 2FL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north

    Aug 3, 2012 · Apt 2FL

    Open — Nov sent out
  • A

    Replace with new the missing balluster from 1st to 2nd story at public hall stairs

    Jul 18, 2012

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at public hall, 2nd story

    Jul 18, 2012

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color walls at public hall, 1st story

    Jul 18, 2012

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls at public hall, 2nd story

    Jul 18, 2012

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets washbasin cold water bathroom 1st story apt.

    Oct 7, 2005

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed wires bathroom 1st story apt.

    Oct 7, 2005

    Open — Nov sent out
  • B

    Replace with new the missing switch plate covers kitchen 1st story apt.

    Oct 7, 2005

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed bx cable ceiling kitchen 1st story apt.

    Oct 7, 2005

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin mice and roaches throughout 1st story apt.

    Oct 7, 2005

    Open — Nov sent out
  • A

    Replace with new the missing door knobs bathroom 1st story apt.

    Oct 7, 2005

    Open — Nov sent out

DOB building violations · 10

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2022

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 27, 2021

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 19, 2019

    Vp*-violation unserved ecb- dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 7, 2019

    Dob violation - dismissed

ECB violations · 36

  • Class - 1

    Failure to maintain adequate housekeeping per section requirements.at time of inspection of a 6 story new building under construction, i observed the following conditions:large amount of loose debris+moderate l

    Mar 26, 2020 · Penalty $6,250

    Resolve
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection.attime of my inspection of a 6 story new building under construction i observed the following conditions:fence covered in graffiti at expo 1&2

    Mar 26, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain/display on site documents required by chapter 33.at time of inspection of a 6 story new building under construction,i observed exposed c-joists at the burried roof, as work as exposed stairc

    Mar 26, 2020 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction.at time of inspection of a 6 story new building under construction i observed the following conditions:openings for garage chute

    Mar 26, 2020 · Penalty $12,500

    Resolve
  • Class - 1

    Provision of law:bc3314.1.supported scaffold not constructed/maintained in code-compliance.at time of inspection of a 6 story new building under construction,i observed a supported scaffold at the rear expo.4 y

    Mar 26, 2020 · Penalty $6,250

    Resolve
  • Class - 2

    Provision of law:bc3301.1.2.failure to comply with the nyc fire code.at time of inspection of a 6 story new building under constructio,observed multiple floors with missing fire extinguishers at srair landings

    Mar 26, 2020 · Penalty $625

    Resolve
  • Class - 1

    Bc3307.4=work and storage zone note at the time fo my inspection of a 7 story building at 5th floor level construction work in progress i observed a work and stroage zone at exp 1 ground level adjacent to side

    Feb 18, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard all persons and properties at the time of my inspection 6 story nb at roof level.site active competent person at site.observed at ground floor elevator shaft open to use leaded materials on

    Feb 18, 2020 · Penalty $12,500

    Resolve
  • Class - 1

    Illegally engaging in any busines or occupation without a required license.note at the time of my inspection of a 7 story building at 5th floor level construction work in progress review the department records

    Feb 18, 2020

    Resolve
  • Class - 1

    Failure to safeguard all public and property affected by construction uperation.note;at time of inspection of a 6 story new building work inprogress i observed on expo#2,cracked sidewalk,uneven and planks with

    Dec 12, 2019 · Penalty $2,500

    Resolve
Show 26 more ↓
  • Class - 2

    Logs note at time of inspection on ana ctiev jobsite i asked of teh superinetdnet the competent person applied that he was in place on his behave up on further review of the logs i observed that there was inade

    Dec 12, 2019

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications. at the time of my inspection at a 6 sty new bldg,i observed material storage on thesidewalk shed(that was not being used at the time)at exp#1&2. upon my

    Aug 19, 2019 · Penalty $2,400

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments. at the time of my inspection;of a 6 story new building,i observed sidewalk shed installed at exposures 1&2. upon my review of

    Aug 19, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Erected or installed supported scaffold 40ft or higher no drawings on site approved at the time of my inspection,of a 6 sty new bldg,i observed a supported scaffold installed at eexp#1 on top of a 14 feet sws,

    Aug 19, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Unqualified worker performing work on scaffold. at the time of my inspection of a 6 sty new bldg. i observed supported scaffolds being installed @ exxp#1,3&4. upon my review drawings & office personal personall

    Aug 19, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Sec. 3303.16 failure to construct shanty/shed using fire retardent wood at the time of my inspection i observed 2 shaties installed at the 1st & 2nd sty levels. upon my inspection it was revealed that these

    Aug 19, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary,construction-no guardrails-6 sty new bldg roof level. at the time of myiunspection,i observed areas w/no or inadequate guardrails sys. at the

    Aug 19, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide pedestrian protection for sidewalk & walkways. at the time of my inspection,of a 6 sty new bldg,i observed the pedestrian walkway have been obstructed by the jobsites trailor stairs at exp#2

    Aug 19, 2019 · Penalty $10,000

    Resolve
  • Class - 1

    Sec. 3303.7.2 failure to perform fire extinguisher installed throughout the bldg. upon inspection the tags for monthly inspection it was revealed that such inspection was not being conducted as required,i also

    Aug 19, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operation. at the time of my inspection,of a 6 sty new bldg,i observed a(2+)inch hole in the floor where a worker was seen working on a ladde

    Aug 19, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Sec. 3307.4.3 failure to provide barriers for staging area. @ the timeof my inspection,of a 6 sty new bldg,i observed a delivery truck at exp#2 w/the outriggers extended & on the pavement ready to(boom)material

    Aug 19, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to institute/maintain safety equipment measures or temporary construction-door swing. at the time of my inspection,of a 6 sty bldg i observed the jobsite door swing was directly toward the public area

    Aug 19, 2019 · Penalty $625

    Resolve
  • Class - 1

    Construction superintendent failed to per duties. at the time of my inspection,i observed a numerous amount of violation(safety)that include public safety that should have been inspected area addressed by the

    Aug 19, 2019

    Resolve
  • Class - 1

    Sec. 3301.2 failure to safeguard/maintain safety equipment measures ortemp construction supported scaffold-sound & secure footing. at the time of my inspection i observed(9)supported scaffold installed at exp#3

    Aug 19, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3307.6.5.8 ailed to provide proof of conducting a scaffold inspection. at the time of inspection on an active jobsite of 6 sty bldg observed scaffold being erected on the sws,upon request for the 6 months

    Aug 19, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failed to maintain adequate housekeeping per section requirements. at the time of inspection,i observed in adequate housekeeping throughout the bldg can cause tripping & falling unsafe hazard condition for any

    Aug 19, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. attime of my inspection on an active jobsite,i observed large amounts ofdebris on 1st fl & rooif. create a tripping hazard for worker & dob in

    Jul 3, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide adequate handrails in stairways 1 thru 6. at time of inspection,of active construction of nb,6 story building,i observed no handrails on stairways leading from floors 1 thru 6. the method of

    May 15, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard all persons/workers. at time of inspection of active construction site of nb,6 story building,i observed uncapped rebaron the 2nd,3rd and rooftop while construction was occurring. remedy:pr

    May 15, 2019

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping. at time of inspection,of nb,6 story;i observed active construction site that was poorly maintained. on floors 3 and 4 many debris in the passageway for egress. on expo

    May 15, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    3307.6.4.8 failure to maintain sidewalk shed lighting fixtures for protection of pedestrians and workers. at time of inspection,it was observed that the shed lighting wire was not encased within a code complian

    May 15, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Jobsite fence not constructed or maintained pursuant to subsection. at the time of my inspection it was observed at construction fence not maintained covered with sprayed grafitti wording also viewing

    Mar 16, 2019

    Resolve
  • Class - 1

    3301.4.1 maintenance of areas used by public.observed sevely uneven sidewalk with cracks posing tripping hazard.swo issued purusant to 28-207.7 and posted at premises.rem:stop all work comly with the code call

    Jun 4, 2015 · Penalty $8,000

    Active
  • Class - 1

    Maintenance of areas used by public.observed serverly cracked sidewalk posing tripping hazard.swo issued pursuant to 28-207.2 & posted at premises.rem:stop all work.fix sidewalk:call best squad for reinspectio

    Jun 4, 2015 · Penalty $8,000

    Active
  • Class - 1

    Maintenance of areas used by public.cracked sidewalk creating uneven surface,posing tripping hazard.swo issued pursuant to 28-207.2 and posted at premises.rem:stop all work.fix sidewalk as per code.call best sq

    Jun 4, 2015 · Penalty $8,000

    Active
  • Class - 2

    Occupancy contraty to that allowed by cofo and dob records, 1story class"a"apt subdivided into 2 class"a"apartments. 1st story front has bedroom bathroom with water closet wash basin and stall shower also full

    Sep 1, 2013

    Resolve

Complaints

  • General

    Mold

    Sep 18, 2013 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Sep 18, 2013 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Sep 18, 2013 · Apt 1FL

    Close
  • Electric

    Wiring

    Aug 22, 2013 · Apt 1FL

    Close
  • Nonconst

    Smoke detector

    Aug 22, 2013 · Apt 1FL

    Close
  • Nonconst

    Carbon monoxide

    Aug 22, 2013 · Apt 1FL

    Close
  • Nonconst

    Smoke detector

    Aug 22, 2013 · Apt 1FL

    Close
  • Nonconst

    Carbon monoxide

    Aug 22, 2013 · Apt 1FL

    Close
  • General

    Cabinet

    Aug 22, 2013 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Aug 22, 2013 · Apt 1FL

    Close
Show 23 more ↓
  • Paint/plaster

    Wall

    Aug 22, 2013 · Apt 1FL

    Close
  • General

    Mold

    Aug 22, 2013 · Apt 1FL

    Close
  • General

    Mold

    Aug 22, 2013 · Apt 1FL

    Close
  • Nonconst

    Vermin

    Aug 22, 2013 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Aug 22, 2013 · Apt 1FL

    Close
  • Plumbing

    Toilet

    Aug 22, 2013 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Aug 1, 2012 · Apt 2FL

    Close
  • General

    Window guards

    Aug 1, 2012 · Apt 2FL

    Close
  • General

    Window guards

    Aug 1, 2012 · Apt 2FL

    Close
  • Nonconst

    Smoke detector

    Aug 1, 2012 · Apt 2FL

    Close
  • General

    Windows

    Aug 1, 2012 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Aug 1, 2012 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Aug 1, 2012 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Aug 1, 2012 · Apt 2FL

    Close
  • Paint/plaster

    Wall

    Jul 8, 2012 · Apt 2FL

    Close
  • General

    Stairs

    Jul 8, 2012 · Apt 2FL

    Close
  • Plumbing

    Bathtub/shower

    Jul 8, 2012 · Apt 2FL

    Close
  • Plumbing

    Water-leaks

    Jul 8, 2012 · Apt 2FL

    Close
  • Paint/plaster

    Wall

    Jul 8, 2012 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Jul 8, 2012 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Jul 8, 2012 · Apt 2FL

    Close
  • General

    Windows

    Jul 8, 2012 · Apt 2FL

    Close
  • Heating

    Heat related

    Oct 30, 2011 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H3)
Year built
2017
Floors
—
Residential units
—
Building area
46,219 ft²
Lot area
9,356 ft²
Zoning
C4-4L
Community board
303
Council district
41
Block / lot
1613 / 16
Assessed value
$5,010,750
Landmark / historic district
No

HPD registration #813691, last renewed Jun 16, 2014.

Questions about 1198 Broadway

Who owns 1198 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is 1200 Nyllc.

Does 1198 Broadway have violations?

Yes. NYC HPD has recorded 51 housing violations at this property.

Is 1198 Broadway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1198 Broadway built?

City records list 2017 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.