roofy

1072 Dekalb Avenue

Brooklyn, NY 11221BBL 3-01603-0032Map

Owner of record: Chen Linda LLC

1072 Dekalb Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 3 residential units across 3 floors. The owner of record is Chen Linda LLC. HPD has recorded 66 housing violations here, most recently on August 30, 2019. 47 of the 50 most recent violations are still open.

HPD violations
66
DOB violations
15
ECB violations
6
HPD complaints
150

What to know

Concern
19 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 30, 2019

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 66

  • A

    Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.

    Aug 30, 2019

    Open — Nov sent out
  • C

    Arrange and make self-closing the doors at the building entrance

    Aug 30, 2019

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak at the ceiling in the entire apartment located at apt 2, 3rd story

    Jan 24, 2013 · Apt 2

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 3rd story

    Jan 24, 2013 · Apt 2

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at light switch at east wall at public hall, 1st story

    Jan 24, 2013

    Closed — Violation closed
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at light switch at east wall at public hall, 1st story

    Jan 24, 2013

    Closed — Violation closed
  • B

    Provide an adequate supply of gas to the fixtures cooking range in the entire apartment located at apt 2, 1st story

    Jan 24, 2013 · Apt 2

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 1st story

    Jan 24, 2013 · Apt 2

    Open — Nov sent out
  • C

    Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2, 1st story

    Jan 24, 2013 · Apt 2

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked to boiler room at cellar

    Nov 12, 2012

    Open — Nov sent out
Show 40 more ↓
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story

    Nov 12, 2012 · Apt 3

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures in bathroom and kitchen in the entire apartment located at apt 3, 1st story

    Sep 10, 2012 · Apt 3

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures to gas range stove in the kitchen located at apt 3, 3rd story

    Sep 10, 2012 · Apt 3

    Open — Nov sent out
  • C

    Replace with new the broken or defective wood tread, 15 from bottom at public hall stairs, 1st story

    Apr 10, 2012

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 3rd story

    Apr 10, 2012 · Apt 3

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures stove. in the kitchen located at apt 3, 3rd story

    Apr 10, 2012 · Apt 3

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story

    Apr 10, 2012 · Apt 3

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures at the gas range in the kitchen located at apt 3, 3rd story

    Mar 23, 2012 · Apt 3

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 3rd story

    Mar 23, 2012 · Apt 3

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story

    Mar 23, 2012 · Apt 3

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3fl, 3rd story

    Apr 21, 2010 · Apt 3FL

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 3fl, 3rd story

    Apr 21, 2010 · Apt 3FL

    Open — Nov sent out
  • B

    Replace with new the broken or defective bell system at street to in the entire apartment located at apt 3fl, 3rd story

    Apr 21, 2010 · Apt 3FL

    Open — Nov sent out
  • B

    Replace with new the missing plate cover at electrical outletat south wall at public hall, 3rd story

    Apr 21, 2010

    Open — Nov sent out
  • B

    Replace with new the missing plate cover at electrical outlet at east wall at public hall, 1st story

    Apr 21, 2010

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures .. in the kitchen located at apt 3fl, 3rd story

    Apr 21, 2010 · Apt 3FL

    Open — Nov sent out
  • B

    Properly repair the broken or defective 15th tread up at public hall stairs, 1st story

    Apr 21, 2010

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed electrical wires at the ceiling at public hall, 1st story

    Apr 21, 2010

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed electrical wires at the ceiling at public hall, 2nd story

    Apr 21, 2010

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 3fl, 3rd story

    Apr 21, 2010 · Apt 3FL

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak over the ceiling in the kitchen located at apt 3fl, 3rd story

    Apr 21, 2010 · Apt 3FL

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures .. in the entire apartment located at apt 3fl, 3rd story, apartment at east

    Sep 8, 2009 · Apt 3FL

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of electrical wires expoused at ceiling, all sty at public hall

    Sep 8, 2009

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 3fl, 3rd story

    Sep 8, 2009 · Apt 3FL

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of construction material and garbage. at public hall, 1st story

    Sep 4, 2009

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retarding material at ceiling and walls all story. at public hall

    Sep 4, 2009

    Open — Nov sent out
  • C

    Replace with new the missing thirty six balusters at all story public hall. at public hall

    Sep 4, 2009

    Open — Nov sent out
  • C

    Properly secure the loose balustrade all story.. at public hall

    Sep 4, 2009

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed electrical wires at ceiling and walls.all story. at public hall

    Sep 4, 2009

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures at gas range in kitchen. in the entire apartment located at apt 3fl, 3rd story, 1st apartment from north at east

    Sep 4, 2009 · Apt 3FL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed electrical wires at south wall at public hall, 2nd story

    Aug 21, 2009

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed wire at east wall at public hall, 1st story

    Aug 21, 2009

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures ... in the kitchen located at apt 3fl, 2nd story

    Aug 21, 2009 · Apt 3FL

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling center room 3rd story apt 2 er-1

    Sep 17, 2005

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling of front room, 2nd sty apt

    Sep 17, 2005

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor, 2nd sty public hall

    Sep 17, 2005

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceilings, 3rd sty apt #2 entire apt

    Sep 17, 2005

    Open — Nov sent out
  • B

    Properly secure the loose electrical outlet, 2nd room from rear , 3rd story apartment 2

    Sep 17, 2005

    Open — Nov sent out
  • B

    Properly repair the broken or defective lock assembly front entrance door, 3rd story apartment 2

    Sep 17, 2005

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective tin ceiling water damage front east room, 3rd story apt

    Sep 17, 2005

    Open — Nov sent out

DOB building violations · 15

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
Show 5 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed

ECB violations · 6

  • Class - 2

    As per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.

    Feb 22, 2017 · Penalty $2,500

    Active
  • Class - 2

    Sec 28-408.1 (a) plumbing work performed by unlicensed plumber. noted:mr. o'neal admitted to making plumbing repairs to water lines at cellar level. work in progress at time of inspection. mr.o'neal is not a re

    Apr 30, 2010 · Penalty $4,000

    Resolve
  • Class - 1

    Work w/o permit. observed in cellar w/o permit altered gas line (new line to hwh) used illegal flexible gas connection. also observe leak from ceiling 3rd flr apt (rain water from roof) failure to maintain buil

    Mar 3, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to have new or altered plumbing system tested. observed in cellar w/o permit altered gas line (new line to hwh) used illegal flexible gas connection. no inspections,test done for this alteration.

    Mar 3, 2010 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to comply w/comm's order to correct vio #34553920y for work w/o permit out (rehab) of 1st fl comm. premises & rear yard extension norecord of correction. remedy: comply w/comm's order & obtain permit na

    Dec 1, 2007 · Penalty $5,000

    Resolve
  • Non-hazardous

    Work w/o permit(s) at 1 fl entire gut rehab of commercial premises. also at rear yard block extensions 14'x20' onto existing 1 fl. remedy: stop all work & obtain permits.

    Jul 9, 2007 · Penalty $800

    Resolve

Complaints

  • Water leak

    Slow leak

    Sep 15, 2021 · Apt 2

    Close
  • General

    Ventilation system

    Sep 15, 2021 · Apt 2

    Close
  • Water leak

    Damp spot

    Sep 15, 2021 · Apt 2

    Close
  • Electric

    Outlet/switch

    Sep 15, 2021 · Apt 2

    Close
  • Safety

    Fire escape

    Feb 26, 2021 · Apt 3F

    Close
  • General

    Janitor/super

    Feb 26, 2021 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2021 · Apt 3F

    Close
  • Electric

    Outlet/switch

    Sep 12, 2019 · Apt 3

    Close
  • Electric

    Lighting

    Sep 12, 2019 · Apt 3

    Close
  • Electric

    No lighting

    Sep 12, 2019 · Apt 3

    Close
Show 40 more ↓
  • Electric

    Lighting

    Aug 25, 2019 · Apt 2

    Close
  • Water leak

    Slow leak

    Aug 25, 2019 · Apt 2

    Close
  • Paint/plaster

    Wall

    Aug 25, 2019 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Aug 25, 2019 · Apt 2

    Close
  • Heating

    Heat related

    Jan 22, 2013 · Apt 2

    Close
  • Heating

    Heat related

    Nov 12, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Nov 8, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Oct 27, 2012 · Apt TOP

    Close
  • General

    Cooking gas

    Oct 11, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Oct 11, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Oct 11, 2012 · Apt 3

    Close
  • Plumbing

    Bathtub/shower

    Sep 6, 2012 · Apt 3

    Close
  • Plumbing

    Toilet

    Sep 6, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Sep 6, 2012 · Apt 3

    Close
  • Plumbing

    Water-leaks

    Sep 6, 2012 · Apt 3

    Close
  • Plumbing

    Water-leaks

    Sep 6, 2012 · Apt 3

    Close
  • General

    Cooking gas

    Sep 6, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Sep 6, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Jun 21, 2012 · Apt 3

    Close
  • General

    Cooking gas

    Apr 8, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Apr 8, 2012 · Apt 3

    Close
  • Nonconst

    Janitor/super

    Mar 23, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Mar 23, 2012 · Apt 3

    Close
  • General

    Cooking gas

    Mar 23, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Mar 23, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Dec 30, 2010 · Apt 3FL

    Close
  • General

    Stairs

    Dec 29, 2010 · Apt 3FL

    Close
  • Plumbing

    Water supply

    Dec 29, 2010 · Apt 3FL

    Close
  • Paint/plaster

    Wall

    Dec 29, 2010 · Apt 3FL

    Close
  • Electric

    Wiring

    Dec 29, 2010 · Apt 3FL

    Close
  • Plumbing

    Water supply

    Dec 28, 2010 · Apt 3FL

    Close
  • Plumbing

    Water supply

    Dec 28, 2010 · Apt 3FL

    Close
  • General

    Cooking gas

    Dec 28, 2010 · Apt 3FL

    Close
  • Plumbing

    Water-leaks

    Dec 28, 2010 · Apt 3FL

    Close
  • Electric

    Wiring

    Dec 28, 2010 · Apt 3FL

    Close
  • General

    Stairs

    Dec 28, 2010 · Apt 3FL

    Close
  • Plumbing

    Water supply

    Dec 27, 2010 · Apt 3FL

    Close
  • General

    Cooking gas

    Dec 27, 2010 · Apt 3FL

    Close
  • Plumbing

    Water supply

    Dec 27, 2010 · Apt 3FL

    Close
  • Plumbing

    Water-leaks

    Dec 27, 2010 · Apt 3FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1931
Floors
3
Residential units
3
Building area
2,340 ft²
Lot area
1,950 ft²
Zoning
R6B
Community board
303
Council district
36
Block / lot
1603 / 32
Assessed value
$98,340
Landmark / historic district
No

Questions about 1072 Dekalb Avenue

Who owns 1072 Dekalb Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Chen Linda LLC.

Does 1072 Dekalb Avenue have violations?

Yes. NYC HPD has recorded 66 housing violations at this property.

Is 1072 Dekalb Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1072 Dekalb Avenue built?

City records list 1931 as the year it was built.

How many apartments are in 1072 Dekalb Avenue?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.