roofy

1079 Dekalb Avenue

Brooklyn, NY 11221BBL 3-01599-0056Map

Owner of record: Ar Royal Management 3 INC.

1079 Dekalb Avenue is a two-family home built in 1899 in Brooklyn, 11221. It has 2 residential units across 2 floors. The owner of record is Ar Royal Management 3 INC.. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
12
ECB violations
17
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 12

  • Construction other optional

    Failure to maintain bldg in a safe condition.feu obsrvd 1wrk contrary to apprvd dwgs,2.bldg roof leaks&not properly weathrproof,3.some of the bldg strctre elements were damaged,rotted,&strctrlly cmprmsd immediately comply with commissioner's order 343553(040524feu30303zt) to repair the building under permit

    May 14, 2024

    Dob violation - dismissed
  • Construction other optional

    Emergency work.1story&partial cellar detachd masonry walls w/steel trosses&wood joists commercial bldg that sustaind severe strctrl damage due to fire on 4/7/24.roof prtlly cllspd.exterior walls.immed fully demo bldg undr drct&cntinuous supervision of pe submt means& methods to feu by 4/1/24.coordinate demo w/fdny

    Apr 5, 2024

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain bldg in a safe condition.feu obsrvd 1.wrk contrary to apprvd dwgs,2.bldg roof leaks,&not properly weatherproof,3.some of tge bldg strctre elements were damaged,rotted,&strctrlly cmprmsd.ownr to immed rtaib nyspe to eval the ent bldg,determine the strctrl stability&prepare/file rpair dwgs.bldg to be rpaird prmt strtng4/22/24

    Apr 5, 2024

    Dob violation - dismissed
  • Construction other optional

    Emergency work order.feu obsrvd the exp was bulgd outward the window frame had dislodged,leaned inward&deemed unstable.bricks were missing on the interior wythe,leavng exp1wythe.ownr to install sidewalk shed on exp1,full width

    Apr 3, 2024

    Dob violation - dismissed
  • Construction other optional

    A 3 story nfp bldg with exterior walls on exp 1, 3 & 4 sides has struc trual cracks. exp 4 side wall is severely deteriorated & leaning sligh tly to the right. a section of 2nd & 3rd fl has been cut & improperly shored & braced; lacking safety measures. no permit has been filed wit h dob for full gut renovation

    Nov 14, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 16, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 5, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 27, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 18, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 23, 2021

    Dob violation - dismissed
Show 2 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 14, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 23, 2020

    Dob violation - dismissed

ECB violations · 17

  • Class - 2

    Observed a sidewalk shed installed not as per code. upon checking department records shed permit was never issued to respondent. b01030539-i1 permit was withdrawn obtain sidewalk shed permit

    Jan 7, 2026 · Penalty $6,250

    Active
  • Class - 2

    Construction fence viewing panel inadequate b.c 3307.7.3 openings are way to small and are too high, making it difficult for anyone 6' or shorter to view into the site. fence panels are dislodged not standing u

    Jan 7, 2026 · Penalty $5,000

    Active
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection. noted: at time of inspection - construction fence observed erected under permit # b00983226-i1-fn observed unstable with loose boards through

    Oct 2, 2025 · Penalty $5,000

    Active
  • Class - 2

    Failure to obtain a temporary construction permit prior to installation/use of temporary construction equipment. noted: at time of inspection - apprx. a 19' x 8' sidewalk shed was observed erected at front of p

    Oct 2, 2025 · Penalty $6,250

    Active
  • Class - 1

    The facades on exposures 1, 3, and 4 were entirely removed and replaced with temporary plywood sheathing. the stair stoop on exposure1 was removed entirely. contrary to stop work order issued on 11/132023. stop

    Jun 7, 2024 · Penalty $5,000

    Active
  • Class - 1

    Work without a permit. note: access granted by neighbors at time of inspection observed full gut renovation being performed by workers in multible levels of above premises. framing work is being performed. sect

    Nov 14, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner. at time of inspection observed through two holes, aprx. 2'x3' and 3'x7' at expo. 4 ofabove building, section in 2nd and 3rd floors are improperly cut, shor

    Nov 14, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner: at the time of inspection & observed at vacant 2 sty structure at exp#4 stucco walls collapsed & exposed original brick work. bulging spalling cracks & fallen

    Mar 10, 2022 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner.2 story house.severe cracks in mortar at multipl locations detached cornice loose.exp3facade seperating from building "in danger" of falling below!remedy.re

    Nov 22, 2021 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to mainain building in code compliant manner.noted:2 story home front stair case has collapsed.decorative elements over windows in disrepair.cornice detached.remedy:comply with code.

    Nov 22, 2021 · Penalty $3,125

    Resolve
Show 7 more ↓
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation#35631693m issued on 10/08/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain.remed

    Nov 22, 2021 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.observed two story house wooden walls covered in concrete,mortar with several cracks in different locations at exp1,3,and 4.cornice with detachment of secti

    Oct 8, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. noted: at time of inspection,observed at exp#1(front of bldg)& exp#4(right sidfe)have running cracks,missing & spalling masonry & areas that are bulging in var

    Jul 29, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. note: at exp#1 the brick facade is in disrepair w/running cracks,spalling & cracked bricks & signs of bulging & displacement. remedy: repair/replace & maintain

    May 19, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner.noted:observed at expo.#1 at front of bldg the arc vertical cracks on the facade wall,alsobetween the 1st & 2nd floors part of the wall is bulging outward.at ex

    Mar 25, 2021 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to maintain bldg walls or aappurtenances. noted: exp#4 stucco is in disrepair. a bis chunck is missing-more stucco in danger of breaking off could cause a big chuck to depart from wall. remedy: maintain

    Jan 21, 2021 · Penalty $12,500

    Resolve
  • Class - 1

    At exposure 4, stucco finish has detached, section approximately 20' x 5' and now exposes plywood sheathing to the elements,also noted at exposure 3 at corner large hole in wall at 1st floor and at 2nd floor an

    Sep 22, 2020 · Penalty $6,250

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B3)
Year built
1899
Floors
2
Residential units
2
Building area
2,052 ft²
Lot area
1,250 ft²
Zoning
R6B
Community board
303
Council district
36
Block / lot
1599 / 56
Assessed value
$69,480
Landmark / historic district
No

Questions about 1079 Dekalb Avenue

Who owns 1079 Dekalb Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Ar Royal Management 3 INC..

Does 1079 Dekalb Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 1079 Dekalb Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1079 Dekalb Avenue built?

City records list 1899 as the year it was built.

How many apartments are in 1079 Dekalb Avenue?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.