421 Hart Street
Brooklyn, NY 11221BBL 3-01593-0048Map
Owner of record: 421 Hart St LLC
421 Hart Street is a two-family home built in 1899 in Brooklyn, 11221. It has 2 residential units across 2 floors. The owner of record is 421 Hart St LLC. HPD has recorded 45 housing violations here, most recently on July 31, 2017. 43 of the 45 most recent violations are still open.
- HPD violations
- 45
- DOB violations
- 10
- ECB violations
- 43
- HPD complaints
- 71
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 45
- IInformation / order
Above premises have been vacant and untenanted except for caretaker for 60 days or more, and cannot be reoccupied until a new certificate of occupancy has been obtained. premises have been vacant since 12\1\2014 and still vacant on 7/31/2017
Jul 31, 2017
Open — Info nov sent out - CImmediately hazardous
Provide temporary seal at all accessible openings erp install slide bolt and pad lock at 2 doors
Dec 19, 2014
Closed — Violation closed - CImmediately hazardous
Provide a temporary seal to all accessible openings
Dec 17, 2014
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts #3, 2nd story (vacate order #120204)
Dec 1, 2014
Open — Not complied with - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ...
Nov 12, 2014
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass pane at lower window sash at building front at east , 1st story
Nov 9, 2014
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling at public hall, 2nd story
Oct 2, 2014
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3f, 2nd story
Oct 2, 2014 · Apt 3F
Open — Nov sent out - BHazardous
Replace with new the missing balusters, two, at public hall stairs, 1st story
Oct 2, 2014
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ; in the entire apartment located at apt 3f, 2nd story
Oct 2, 2014 · Apt 3F
Open — Nov sent out
Show 35 more ↓
- BHazardous
Discontinue the rooming unit krook tery in the 2nd room from north at west located at apt 2, 1st story
Mar 7, 2012 · Apt 2
Open — Nov sent out - BHazardous
Discontinue the rooming unit jhon doe in the 1st room from north at west located at apt 2, 1st story
Mar 7, 2012 · Apt 2
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or gates from window to fire escape in the 1st room from north located at apt 2, 1st story
Mar 7, 2012 · Apt 2
Open — Nov sent out - BHazardous
Discontinue the rooming unit michale freeman. in the 1st room from north located at apt 2, 1st story
Mar 7, 2012 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story
Mar 6, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1fl, 1st story
Mar 6, 2012 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked
Nov 4, 2011
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3f, 2nd story
Nov 4, 2011 · Apt 3F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 3f, 2nd story
Nov 4, 2011 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisiting of hasp at entrance door capable of being padlocked located at apt 3f, 2nd story
Nov 4, 2011 · Apt 3F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 3f, 2nd story
Sep 28, 2011 · Apt 3F
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1f, 1st story
Mar 31, 2009 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story
Mar 31, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt bsmt, 1st apartment from south at west
Apr 25, 2008 · Apt BSMT
Open — Nov sent out - BHazardous
Properly repair the broken or defective concealed water leak at ceiling in the 1st room from north located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Apr 25, 2008 · Apt BSMT
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Apr 25, 2008 · Apt BSMT
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt bsmt, 1st apartment from south at west
Apr 25, 2008 · Apt BSMT
Open — Nov sent out - BHazardous
Discontinue the rooming unit ..... in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Apr 25, 2008 · Apt 1
Open — Nov sent out - BHazardous
Discontinue the rooming unit ...... in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Apr 25, 2008 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective door vestibule
Apr 10, 2008
Open — Nov sent out - BHazardous
Replace with new the missing baluster 1st and 2nd story public hall stairs
Apr 10, 2008
Open — Nov sent out - BHazardous
Discontinue the rooming unit 1st and 2nd story apartments
Apr 10, 2008
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the 1st room from north at west located at b-room 1f, 1st story
Feb 19, 2008 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .... in the 1st room from north at west located at apt 1f, 1st story
Feb 19, 2008 · Apt 1F
Open — Nov sent out - BHazardous
Properly secure the loose metal handrail at west side of stoop
Jan 12, 2008
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving cement floor at basement exit to front areaway
Jan 12, 2008
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at cellar
Jan 12, 2008
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt base
Oct 29, 2007 · Apt BASE
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires ceiling in the kitchen located at apt base
Oct 29, 2007 · Apt BASE
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt base
Oct 29, 2007 · Apt BASE
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 1st story
Apr 7, 2007 · Apt 2F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1f, 1st story
Mar 12, 2007 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective all wood treads basement story to cellar
Feb 15, 2007
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving concrete floor at cellar
Feb 15, 2007
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1f, 1st story
Feb 15, 2007 · Apt 1F
Open — Nov sent out
DOB building violations · 10
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 13, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 14, 2019
Dob violation - active - Construction other optional
C-construction other optional
Nov 14, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2012
Dob violation - active
ECB violations · 43
- Class - 2
At time of inspection of a inactive 5 story building i observed an expired construction fence permit. upon researching on bis and dob now fence permit was expired on 01/08/2020. construction fence permit needs
Apr 11, 2023 · Penalty $6,250
Active - Class - 1
Failure to provide sidewalk shed where required. at the time of inspection of inactive jobsite w/structural steel in place for the 4th sty framing at exp#1 observed no sidewalk shed in place at exp#1. upon revi
Jan 11, 2022 · Penalty $25,000
Active - Class - 2
Job site fence not constructed or maintained pursuant to subsection. at time of inspection construction fence missing 3 panels missing door to construction fence. access to construction site is unmitigated.
Apr 17, 2020 · Penalty $5,000
Active - Class - 1
Failure to file a special inspection statement of responsibility priorto permit issurance and/or prior to start of work under special inspection/requirements(no tr1 for structural & cold formed steel)at time of
Dec 2, 2019
Resolve - Class - 1
Failure to provide/maintain sidewalk shed as per code.at time of inspection on an inactive 5 story alt construction side.notice at exposure#1 of the construction site which had steel work on what is to be the 4
Dec 2, 2019 · Penalty $2,400
Active - Class - 2
Job site fence not maintained pursuant to subsection-missing plexiglass. at time of inspection at an alteration 5 story construction site,i observed three(3) plexiglass missing at viewing panel at exp.#1. remed
Aug 3, 2019 · Penalty $800
Active - Class - 1
Unlawfully continued work while on notice of a stop work order.note:attime of inspection responding to a compliant of an active jobsite under a stop work order dated 01-28-19 which is still in effect,i observed
Feb 26, 2019 · Penalty $5,000
Active - Class - 1
Failure to maintain/institute safety measures no guardrails. at the time of my inspection 5 sty planned bulding at work in progress at 4sty deck level. observed guardrails misisng/inadequate throughout the site
Jan 28, 2019 · Penalty $5,000
Active - Class - 2
Failure to maintain adequate housekeeping. at the time of my inspection 5sty building, alt work in progress at 4sty deck level, observe inadequate housekeeping. constr materials and debris created tripped hazar
Jan 28, 2019
Resolve - Class - 2
Failure to provide safeguard for all persons and properties. at time of my inspeciton 5sty building, alt work in progress at 4sty deck levelobseved no rebar caps provided at cellar and 4sty deck level. any one
Jan 28, 2019 · Penalty $5,000
Active
Show 33 more ↓
- Class - 2
Const superintendent failed to perform his duties as per code. at the time of my inspection,5 sty bldg alt work in progress at 4 sty deck level. at the time of my inspection,wrote violations for #(1)ssp(2)guard
Jan 28, 2019 · Penalty $5,000
Active - Class - 2
3301.7 failure to provide approved dd (drawing design) at the time ofmy inspection, 5 sty building, alt work in progress at 4 story deck level. observed a wood and steel frame made platform at 15th level. open
Jan 28, 2019 · Penalty $1,250
Active - Class - 1
3301.2 failure to provide fall protection system. at time of inspect tion 5 story building alt work i progress at 4sty level. observed worker working at 4sty deck, but no harness or fall protection system
Jan 28, 2019 · Penalty $2,500
Active - Class - 1
3303.9 failure to provide means of egress. at the time of my inspec tion 5 sty building, alt work in progress at 4 sty deck level.observedconst work in progress at cellar level but not safe means of egress
Jan 28, 2019 · Penalty $1,250
Active - Class - 1
3301.13.1 failure to provide aprpoved const documetns at site. no ssp (site safety plan) at the time of my inspeciton, 5 sty building, alt work in progress at hsty deck level. upon my arrival request for ssp.
Jan 28, 2019 · Penalty $1,250
Active - Class - 1
3309.1 failure to provide roof protection for adj at the time of my inspection 5sty building, alt work in progress at 4sty deck level. ob served const work in progress 4' deck level. observed const work in
Jan 28, 2019 · Penalty $2,500
Active - Class - 2
Jobsite fence not constructed persuant to subsection.defective metal josite from gate are push up and falling off.rem:repair and or replace fence.
Sep 26, 2018 · Penalty $830
Active - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34952809y issued on 6/11/12 pursuant to 28-204.4 & 1rcny 102-01. for residence altered.
Oct 19, 2012 · Penalty $8,000
Resolve - Class - 1
Residence altered for occupancy as a dwelling from a 2 family to a 4 or more families. note:the legal occupancy of 1st flr is a one family now first flr arranged for occupancy as a 3 sro space. second flr legal
Jun 11, 2012 · Penalty $24,000
Active - Class - 2
Occupancy contrary to that allowed by c/o and dob's records. class 'a'apt at 1 sty has been converted into 3 class 'b' rooms. partitions erected w/lockable doors intact. discontinue use of sro rooms. inadequate
Mar 7, 2012 · Penalty $6,000
Active - Class - 2
Sec. 28-201.1 failure to comply with the commissioner's order to remedy the violating conditions described as "work w/o permit" as citied in nov #34652024j,issued 6/30/08. remedy: comply with commissioners orde
Feb 26, 2009 · Penalty $4,000
Active - Class - 2
Failure to comply with the commissioner's order to remedy the violating conditions described as "use of illegal hardware" as citied in nov #34658237k,issued 6/30/08 & nov #34537353r,issued 9/13/06.
Feb 26, 2009 · Penalty $4,000
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for nov #34716153x issued 11/6/08. remedy: file certificate of correction.
Feb 26, 2009 · Penalty $4,000
Resolve - Class - 2
Hazardous-as noted- failure to maintain building in code-complaint manner 1- at the interior 2nd to 3rd floor levels, riser & threads are pulling away from each other leaving a space approx. 3' to 4" creating a
Nov 6, 2008 · Penalty $2,500
Active - Non-hazardous
Work w/o a permit! illegal work noted: illegal partitions erected to create sro's on the 2nd flr, 1st flr and partition erected at basement level in order to seal rough opening for door. leading to private hall
Jun 30, 2008 · Penalty $2,500
Active - Hazardous
Failure to maintain exterior bldg. hazardous defects noted: at primarymeans of egress stair stoop entry to bldg found w/broken & defective stair tread & riser w/cracks 9th from bottom front yard setback.
Jun 30, 2008 · Penalty $2,500
Active - Hazardous
Failure to maintain interior bldg wall hazardous defects noted exposedceiling joists @ ktcn bsmt lvl missing drywall at public hall ceiling & vestibule walls (67 al) bsmt lvl rear of bldg missing balusters at
Jun 30, 2008 · Penalty $2,500
Active - Non-hazardous
Use of illegal hardware! noted: sro room @ ne found w/padlock installed iron gate for window 1 sty. & rear sro room @ nw 1st sty found w/iron fixed gate installed at windows t/o. remedy: remove illegal hardware
Jun 30, 2008 · Penalty $2,500
Active - Hazardous
Failure to provide at least 2 means of egress from rooms or space where required. hazardous defects noted: 1st story rear sros at northwest & northeast found w/illegal hardwares installed i.e. fixed gates and
Jun 30, 2008 · Penalty $2,500
Active - Hazardous
Occupancy contrary to that allowed by c of o and dept of bldgs records 2 stys-2apts private dwelling occupied as-b-rooms. rem: restore premises to legal occupancy.
Apr 10, 2008 · Penalty $2,500
Active - Non-hazardous
Failure to maintain bldg rear 1st fl and basement water pipes severe leak when water turned on basement rear ceiling platser approx 10x10 missing flrs at rear spongy from water leak cellar stairs in disrepair c
Mar 31, 2008 · Penalty $2,500
Active - Non-hazardous
Occupancy contrary to that allowed by bldg dept records 2 family dwelling now used as sro 1st fl 3 tenants all rooms have windows remedy: discontinue illegal use
Mar 31, 2008 · Penalty $2,500
Active - Hazardous
Failure to comply with comm's order to correct vio # 34537358y for work w/o permit. no permit.remedy comply with comm's order& obtain permit
Sep 21, 2007 · Penalty $5,000
Active - Hazardous
Failure to comply w/ an order of the dept to correct vio # 34537358y for work w/o permit. remedy:comply w/ dept order & obtain permit.
May 5, 2007 · Penalty $5,000
Active - Hazardous
Failure to maintain:note:columns & joints rotted in cellar.flooding & garbage thru-out cellar.concrete cellar slab broken thru-out.remedy:maintain bldg.
May 5, 2007 · Penalty $10,000
Active - Hazardous
Residence alt for occupancy by more then the legally approved # of families.dob records indicates legal 2 family residence now alt into 7 sros. by adding partitions & door w/ locks w/ common kitchens 3 pc bath
May 5, 2007 · Penalty $46,500
Active - Hazardous
Failure to maintain.noted:columns & joist rotted & in disrepair in cellar.debris & rubber & garbage scattered in cellar & rear yard.remedy:maintain bldg.
Jan 20, 2007 · Penalty $10,000
Active - Hazardous
Residence alt for occupancy by more than the legally approved # of famdob records indicate legal 2 fam now alt by adding locks ( partitions)on each room door & creating 7 sros w/ common kitchen in basement & 3p
Jan 20, 2007 · Penalty $37,500
Active - Hazardous
Failure to comply w/ an order of the dept. to correct vio. # 34537358xfor work w/o permit illegal partitions & sros built w/o permit. remedycomply w/ dept. order & obtain permits & certify correction
Jan 20, 2007 · Penalty $5,000
Active - Hazardous
Work w/o permit. illegal work noted: full height sheetrock partitions removed & erected at various locations altering bldg from a legal 2 fam dwelling to a multiple sro's 7 total sro's. 1 at basement, 3 at 1st
Sep 18, 2006 · Penalty $2,500
Active - Hazardous
Failure to maintain bldg. defects noted: at cellar level large pcs of concrete scattered thru-out. brick columns west side have loose bricks& deteriorated mortar joints. basement fl joists rotted & deteriorated
Sep 18, 2006 · Penalty $2,500
Active - Hazardous
Residence alt for occupancy as a dwelling for more than the legally approved # of families. note. d.o.b computer property profile over view records indicates a 2 fam. dwelling. now @ time of insp. osberved bldg
Sep 18, 2006 · Penalty $34,000
Active - Non-hazardous
Use of illegal hardware note:@ 2nd flr level 2 drs @ rear & 1 dr @ front are padlocked @ 1st flr level 2 drs @ rear of hallway padlocked @ bsmt level @ center by stairs 1 dr padlocked.remedy:remove illegal hard
Sep 13, 2006 · Penalty $2,500
Active
Complaints
- Plumbing
Radiator
Nov 6, 2014 · Apt 3F
Close - Plumbing
Radiator
Nov 6, 2014 · Apt 3F
Close - Plumbing
Radiator
Nov 6, 2014 · Apt 3F
Close - Heat/hot water
Entire building
Oct 20, 2014 · Apt 3F
Close - Heat/hot water
Entire building
Sep 25, 2014 · Apt 3F
Close - Heating
Heat related
Feb 4, 2014 · Apt 1FL
Close - General
Stairs
Dec 7, 2012 · Apt 3FLR
Close - Heating
Heat related
Mar 9, 2012 · Apt 3
Close - Electric
Electric-supply
Mar 9, 2012 · Apt 3
Close - Electric
Electric-supply
Mar 9, 2012 · Apt 3
Close
Show 40 more ↓
- Electric
Electric-supply
Mar 6, 2012 · Apt 2
Close - Electric
Electric-supply
Mar 6, 2012 · Apt 2
Close - Heating
Heat related
Mar 6, 2012 · Apt 1
Close - Heating
Heat related
Mar 6, 2012 · Apt 2
Close - Electric
Electric-supply
Mar 5, 2012 · Apt 1FL
Close - Heating
Heat related
Mar 5, 2012 · Apt 1FL
Close - Electric
Electric-supply
Mar 5, 2012 · Apt 1FL
Close - Heating
Heat related
Mar 5, 2012 · Apt 1FL
Close - General
Stairs
Feb 4, 2012 · Apt 3F
Close - Construction
Pavement
Jan 6, 2012 · Apt 2
Close - Heating
Heat related
Nov 21, 2011 · Apt 3F
Close - Plumbing
Bathtub/shower
Oct 30, 2011 · Apt 3F
Close - Heating
Heat related
Oct 30, 2011 · Apt 3F
Close - Heating
Heat related
Sep 26, 2011 · Apt 3F
Close - Heating
Heat related
Sep 26, 2011 · Apt 3F
Close - Plumbing
Water supply
Sep 14, 2011 · Apt 3F
Close - Plumbing
Water supply
Jan 2, 2010 · Apt 3F
Close - Heating
Heat related
Jun 10, 2009 · Apt 1F
Close - Heating
Heat related
Apr 9, 2009 · Apt 1
Close - Heating
Heat related
Mar 27, 2009 · Apt 1F
Close - Heating
Heat related
Mar 13, 2009 · Apt 3FL
Close - Heating
Heat related
Mar 11, 2009 · Apt BSMNT
Close - Electric
Electric-supply
Jan 17, 2009 · Apt 1
Close - Electric
Electric-supply
Jan 17, 2009 · Apt 1
Close - Heating
Heat related
Jan 17, 2009 · Apt 1
Close - Plumbing
Water supply
Jun 10, 2008 · Apt BASE
Close - Plumbing
Toilet
Jun 10, 2008 · Apt BASE
Close - Plumbing
Water-leaks
Mar 21, 2008 · Apt 1FL
Close - Plumbing
Water-leaks
Mar 21, 2008 · Apt 1FL
Close - Plumbing
Water-leaks
Mar 21, 2008 · Apt 1FL
Close - Paint/plaster
Wall
Feb 18, 2008 · Apt 1F
Close - Heating
Heat related
Feb 18, 2008 · Apt 1F
Close - Plumbing
Water supply
Feb 18, 2008 · Apt 1F
Close - Paint/plaster
Wall
Feb 12, 2008 · Apt 1F
Close - Plumbing
Water-leaks
Feb 12, 2008 · Apt 1F
Close - Heating
Heat related
Jan 10, 2008 · Apt 1F
Close - Plumbing
Water-leaks
Jan 7, 2008 · Apt 1F
Close - Heating
Heat related
Jan 7, 2008 · Apt 1F
Close - Heating
Heat related
Jan 5, 2008 · Apt 1F
Close - Heating
Heat related
Jan 5, 2008 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1899
- Floors
- 2
- Residential units
- 2
- Building area
- 2,160 ft²
- Lot area
- 2,000 ft²
- Zoning
- C4-4L
- Community board
- 303
- Council district
- 36
- Block / lot
- 1593 / 48
- Assessed value
- $65,280
- Landmark / historic district
- No
Questions about 421 Hart Street
Who owns 421 Hart Street?
The owner of record in NYC Department of City Planning PLUTO data is 421 Hart St LLC.
Does 421 Hart Street have violations?
Yes. NYC HPD has recorded 45 housing violations at this property.
Is 421 Hart Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 421 Hart Street built?
City records list 1899 as the year it was built.
How many apartments are in 421 Hart Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.