1000 Broadway
Brooklyn, NY 11221BBL 3-01590-0017Map
Owner of record: 1000 Broadway LLC
1000 Broadway is an elevator apartment building built in 2015 in Brooklyn, 11221. It has 35 residential units across 6 floors. The owner of record is 1000 Broadway LLC. HPD has recorded 56 housing violations here, most recently on May 8, 2026. 2 of the 50 most recent violations are still open.
- HPD violations
- 56
- DOB violations
- 10
- ECB violations
- 15
- HPD complaints
- 83
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 56
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the electrical room door
Mar 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire stairs, 2nd story, section ''stair b'', 2nd from north at east
Mar 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the door leading to the terrace at the north wall at public hall, 2nd story
Mar 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 2nd story
Mar 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges. at compactor closet, 3rd story
Mar 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 5th story
Mar 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at 1st fire stairs from east, 6th story, section ''stair b''
Mar 2, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of sprinkler head paint and plaster at 2nd fire stairs from east, 1st story, section ''stairs b''
Mar 2, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hopper door latch at compactor closet, 3rd story
Mar 2, 2026
Closed — Violation closed
Show 40 more ↓
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entire area. at compactor closet, 2nd story
Mar 2, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerators with door intact at public hall
Mar 2, 2026
Closed — Violation dismissed - BHazardous
§ 185, 240 m/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling at the mechanical/sprinkler room
Mar 2, 2026
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the electrical room
Mar 2, 2026
Closed — Violation dismissed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the public hall.
Mar 2, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of construction material at 1st public hall bulkhead from east
Mar 2, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 2, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of sprinkler head painted on the west wall at 2nd fire stairs from east, 6th story, section '' stair a''
Mar 2, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at 1st fire stairs from east, 6th story, section ''stair b''
Mar 2, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at 1st public hall bulkhead from east
Mar 2, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at 1st public hall bulkhead from east
Mar 2, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at 2nd public hall bulkhead from east
Mar 2, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at compactor closet, 5th story
Mar 2, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of sprinkler head painted. at fire stairs, 2nd story, section ''stair b'', 2nd from north at east
Mar 2, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at 2nd public hall bulkhead from east
Mar 2, 2026
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of sprinkler head missing at ceiling (close to apartments 4g and 4f, north-east section) at public hall, 4th story
Mar 2, 2026
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line under washbasin in the bathroom located at apt 4e, 4th story, 2nd apartment from north at east
Jan 29, 2026 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electric light fixtures at ceiling in the foyer located at apt 4e, 4th story, 2nd apartment from north at east
Jan 29, 2026 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electric light fixtures at ceiling in the kitchen located at apt 4e, 4th story, 2nd apartment from north at east
Jan 29, 2026 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2d, 2nd story, 1st apartment from east at south
Jan 29, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures .. in the entire apartment located at apt 6a, 6th story, 1st apartment from east at south
Jul 13, 2024 · Apt 6A
Open — Civ14 mailed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 6a, 6th story, 1st apartment from east at south
Jul 13, 2024 · Apt 6A
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from east at south
Feb 13, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Feb 9, 2024 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Feb 9, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Feb 9, 2024 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 2nd apartment from east at south
Feb 10, 2023 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from east at south
Nov 7, 2022 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5c, 5th story, 1st apartment from east at south
Nov 7, 2022 · Apt 5C
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective hinge at upper base cabinet door (1st from east at north) in the kitchen located at apt 5c, 5th story, 1st apartment from east at south
Nov 7, 2022 · Apt 5C
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective knob at laundry closet door (1st from east at north) in the private hallway located at apt 5c, 5th story, 1st apartment from east at south
Nov 7, 2022 · Apt 5C
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 7, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jun 7, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 7, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 7, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 7, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 7, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 7, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 7, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 19, 2021
Closed — Violation dismissed
DOB building violations · 10
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2021
Dob violation - resolved - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2017
Dob violation - resolved
ECB violations · 15
- Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35476072k issued on 2/19/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.occupancy contrary.reme
Feb 10, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#35476072k issued on 2/19/20 & to file certificate of correction pursuant to 28-201.1&1rcny102-01.comply w/ commissioner's orer &/or file
Nov 13, 2020 · Penalty $1,250
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or building department records.note certificate of occupancy# 32070776 issue 2/22/16 states 35 dwelling units 2 recreation areas,no gym establi
Feb 19, 2020 · Penalty $6,250
Resolve - Class - 1
Altered/changed building occupied without a valid certificate of occupany at time of inspection and observed a tcellar level as "cross fit gym" actived in business opertaion record statted #320707767f (2-22-16)
Nov 19, 2019 · Penalty $12,500
Resolve - Class - 1
Altered/changed building occupied without a valid certificate of occupancy as per 28-118.3.1 - 28-118.3.2 at time of inspection observed cross fit gym operating at cellar contrary to c of o#320707767f.issued on
Sep 9, 2019 · Penalty $6,250
Resolve - Class - 1
Sec. 3314.5.5 platforms are not tied down or not otherwise restrained.observed approx 70 high supported scaffold erected at exp#1 & 3 & at rear of the bldg. having loose planks & platforms which is making hazar
Apr 21, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. observed 6 sty bldg topped off - workers working - debris,materials,waste wood planks all over the working area at cellar through 4th fl level
Apr 21, 2015 · Penalty $400
Resolve - Class - 1
Failure to safeguard all person & property affected by construction operation. observed active job site. pipe scaffold sitting on a single wood plank at 1st fl level which has approx 10' drop below. making haza
Apr 21, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no toe board. observed 6 sty bldg topped off toe board hasnot been installed or missing around elevator shaft at 4th,5th & 6th
Apr 21, 2015 · Penalty $1,000
Resolve - Class - 1
Sec. 3314.4 failure to provide inspection report as required. observedapprox 70'high supported pipe scaffold erected at exp#1 & 2 & also rear of the bldg. scaffold has 5 fully planked reflecting present conditi
Apr 21, 2015 · Penalty $1,600
Resolve
Show 5 more ↓
- Class - 1
Sec. 3307.4 failure to protect public from construction hazards. observed 6 sty bldg topped of pile of materials(bricks & cement)stored on street was not barricaded or guarded to present public contact.
Apr 21, 2015 · Penalty $400
Resolve - Class - 1
3303.5.3 clogging precautions shall be taken to prevent concrete/mortar washing sand or any other materials from entering a sewer or drain/mannhole-no stacks for filtering activity location on willoghby ave sid
Aug 14, 2014 · Penalty $1,600
Resolve - Class - 2
1814.1 stop all work note:pursuant to section 28.207.admin code of city of new york you are ordered to immediate stop all work at above premises.failure to prepare and provide site specific plan details and seq
Apr 2, 2014
Resolve - Class - 1
Failure to notify d.o.b within 24 to 48hrs start of excavation.contractor start excavation without notification of d.o.b.rem: comply with notice of violation.officailly notify d.o.b calling 212-393-2550 & obtai
Apr 2, 2014 · Penalty $6,000
Resolve - Class - 2
3304.4.4 failure to provide 3'6" guard rail or solid enclosure around open & accessable side of excavation.contractor failed to provide guardrails around exp#1,exp#2,excavation area.rem:comply with notice of vi
Apr 2, 2014
Resolve
Complaints
- Electric
Power outage
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt 4G
Close - Electric
Power outage
Jan 27, 2026 · Apt 4E
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt 4E
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Door/window
Door
Jan 27, 2026 · Apt 4E
Close - General
Bell/buzzer/intercom
Jan 27, 2026 · Apt 4E
Close - Electric
Power outage
Jan 27, 2026 · Apt 4G
Close - Electric
Power outage
Jan 27, 2026 · Apt BLDG
Close - Electric
Power outage
Jan 27, 2026 · Apt BLDG
Close
Show 40 more ↓
- Electric
Power outage
Jan 27, 2026 · Apt 2D
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 6D
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 4F
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 4F
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 4E
Close - Electric
Power outage
Jan 26, 2026 · Apt 4F
Close - Electric
Power outage
Jan 26, 2026 · Apt 4F
Close - Electric
Power outage
Jan 26, 2026 · Apt 6D
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 6G
Close - Electric
Power outage
Jan 26, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 5B
Close - Plumbing
Water supply
Aug 3, 2024 · Apt 6D
Close - Plumbing
Water supply
Jul 16, 2024 · Apt 6B
Close - Plumbing
Water supply
Jul 16, 2024 · Apt 5A
Close - Plumbing
Water supply
Jul 15, 2024 · Apt 6D
Close - Heat/hot water
Apartment only
Jul 15, 2024 · Apt 6G
Close - Plumbing
Water supply
Jul 15, 2024 · Apt 5B
Close - Plumbing
Water supply
Jul 15, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jul 13, 2024 · Apt 6E
Close - Plumbing
Water supply
Jul 11, 2024 · Apt 6A
Close - Flooring/stairs
Floor
Jun 28, 2024 · Apt 3F
Close - General
Ventilation system
Jun 28, 2024 · Apt 3F
Close - Flooring/stairs
Floor
Jun 28, 2024 · Apt 3F
Close - Heat/hot water
Apartment only
Feb 12, 2024 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 7, 2024 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 7, 2024 · Apt 4A
Close - Water leak
Slow leak
Dec 6, 2023 · Apt 4A
Close - General
Ventilation system
Dec 6, 2023 · Apt 4A
Close - Water leak
Damp spot
Dec 6, 2023 · Apt 4A
Close - Door/window
Door
Feb 17, 2023 · Apt 4A
Close - Flooring/stairs
Floor
Jan 30, 2023 · Apt 4A
Close - Unsanitary condition
Mold
Jan 30, 2023 · Apt 4A
Close - Safety
Smoke detector
Jan 18, 2023 · Apt 5C
Close - Unsanitary condition
Pests
Jan 18, 2023 · Apt 5C
Close - Unsanitary condition
Mold
Jan 18, 2023 · Apt 5C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2015
- Floors
- 6
- Residential units
- 35
- Building area
- 37,939 ft²
- Lot area
- 9,084 ft²
- Zoning
- C4-4L
- Community board
- 303
- Council district
- 36
- Block / lot
- 1590 / 17
- Assessed value
- $3,203,100
- Landmark / historic district
- No
HPD registration #386299, last renewed Jul 30, 2026.
Questions about 1000 Broadway
Who owns 1000 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 1000 Broadway LLC.
Does 1000 Broadway have violations?
Yes. NYC HPD has recorded 56 housing violations at this property.
Is 1000 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1000 Broadway built?
City records list 2015 as the year it was built.
How many apartments are in 1000 Broadway?
It has 35 residential units and 41 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.