roofy

28 Stuyvesant Avenue

Brooklyn, NY 11221BBL 3-01589-0048Map

Owner of record: Broadwill Plaza L.p.

28 Stuyvesant Avenue is a walk-up apartment building built in 1901 in Brooklyn, 11221. It has 4 residential units across 2.5 floors. The owner of record is Broadwill Plaza L.p.. HPD has recorded 39 housing violations here, most recently on August 6, 2026. 3 of the 39 most recent violations are still open.

HPD violations
39
DOB violations
3
ECB violations
4
HPD complaints
29

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 6, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 39

  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at evidence throughout yard

    Aug 6, 2026

    Open — Invalid certification
  • C

    M/d law abate the nuisance consisting of refrigerator with doors intact at public hall, 1st story

    Jun 1, 2026

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items, at public hall, 1st story

    Jun 1, 2026

    Open — False certification
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Jun 1, 2026 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Jun 1, 2026 · Apt 1R

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 6, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Oct 2, 2025

    Closed — Violation dismissed
  • C

    Replace with new the missing fire retardant material at ceiling throughout approx 700 sq feet in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east

    Oct 2, 2025 · Apt 3

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of painted over sprinkler heads approx total # 3 in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east

    Oct 2, 2025 · Apt 3

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed elctrical wiring at ceiling in the foyer located at apt 3, 3rd story, 1st apartment from north at east

    Oct 2, 2025 · Apt 3

    Closed — Violation dismissed
Show 29 more ↓
  • B

    Refit door in the entrance located at apt 3, 3rd story, 1st apartment from north at east

    Oct 2, 2025 · Apt 3

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story

    Oct 2, 2025

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Oct 2, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 2, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Oct 2, 2025

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 2, 2025

    Closed — Violation dismissed
  • C

    Remove the illegal fastening double cylinder key operated lock installed at front gate yard

    Oct 2, 2025

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of painted over sprinkler heads total of 2 at public hall, 1st story

    Oct 2, 2025

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of painted over sprinkler heads total # 2 at public hall, 2nd story

    Oct 2, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Oct 2, 2025

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at all yards yard

    Oct 2, 2025

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Sep 14, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 3, 3rd story, 1st apartment from north at east

    Sep 14, 2025 · Apt 3

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3, 3rd story, 1st apartment from north at east

    Sep 14, 2025 · Apt 3

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3, 3rd story, 1st apartment from north at east

    Sep 14, 2025 · Apt 3

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 14, 2025

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 14, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox sign missing at public hall, 1st story

    Sep 14, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings sign missing

    Sep 14, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Sep 14, 2025

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak above ceiling in the 5th room from north located at apt 3, 3rd story, 1st apartment from north at east

    Sep 14, 2025 · Apt 3

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 11, 2025

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approximately 12 sq ft at ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east

    Apr 3, 2024 · Apt 3

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Apr 3, 2024 · Apt 3

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 2, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 13, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 31, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 25, 2015

    Closed — Violation dismissed

DOB building violations · 3

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2016

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 12, 1989

    Dob violation - active

ECB violations · 4

  • Class - 3

    Failure to maintain building and all parts thereof in a code compiant manner at the time of my inspection i observed sidewlak cutb at front of property exp #1 illegall off street parking pad curb cut

    May 20, 2021

    Resolve
  • Class - 3

    Fence facade permit height. noted: exterior front fence us approx 7' height chain link fence. rem: conform fence to code.

    Aug 9, 2018

    Resolve
  • Class - 1

    Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices appliances and wiring in use.open gem boxes,switches,outlets,faulty wiring on light fixtures throughout the building.remedy:comply w

    Aug 19, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Electrical work without a permit. installed light fixtures,outlet switches circuit breakers panels and new wiring throughout the entire buildings,plan new conduit boxes and light fixtures on the outside of the

    Aug 19, 2016 · Penalty $800

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Jun 30, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 18, 2026 · Apt BLDG

    Close
  • Appliance

    Refrigerator

    May 28, 2026 · Apt 1R

    Close
  • Water leak

    Slow leak

    May 28, 2026 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    May 28, 2026 · Apt 1R

    Close
  • Flooring/stairs

    Stairs

    May 28, 2026 · Apt 1R

    Close
  • Plumbing

    Radiator

    Mar 18, 2026 · Apt 1R

    Close
  • Appliance

    Refrigerator

    Mar 18, 2026 · Apt 1R

    Close
  • Water leak

    Slow leak

    Mar 18, 2026 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    Mar 18, 2026 · Apt 1R

    Close
Show 19 more ↓
  • Door/window

    Door

    Mar 18, 2026 · Apt 1R

    Close
  • Electric

    Lighting

    Mar 18, 2026 · Apt 1R

    Close
  • Flooring/stairs

    Stairs

    Mar 18, 2026 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Feb 25, 2026 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt 3FL

    Close
  • Heat/hot water

    Apartment only

    Jan 9, 2026 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2025 · Apt BLDG

    Close
  • General

    Cooking gas

    Jun 11, 2024 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2024 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Mar 26, 2024 · Apt 3

    Close
  • Appliance

    Electric/gas range

    Mar 26, 2024 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Oct 6, 2023 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    Feb 15, 2022 · Apt 1R

    Close
  • Safety

    Smoke detector

    May 31, 2021 · Apt 1R

    Close
  • Door/window

    Door to dumbwaiter

    May 31, 2021 · Apt 1R

    Close
  • Door/window

    Door

    Apr 11, 2017 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Apr 11, 2017 · Apt 1L

    Close
  • Water leak

    Slow leak

    Apr 11, 2017 · Apt 1L

    Close
  • General

    Signage missing

    Jul 25, 2016 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1901
Floors
2.5
Residential units
4
Building area
4,375 ft²
Lot area
2,600 ft²
Zoning
R6B
Community board
303
Council district
36
Block / lot
1589 / 48
Assessed value
$557,100
Landmark / historic district
No

HPD registration #362917, last renewed Jul 21, 2025.

Questions about 28 Stuyvesant Avenue

Who owns 28 Stuyvesant Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Broadwill Plaza L.p..

Does 28 Stuyvesant Avenue have violations?

Yes. NYC HPD has recorded 39 housing violations at this property.

Is 28 Stuyvesant Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 28 Stuyvesant Avenue built?

City records list 1901 as the year it was built.

How many apartments are in 28 Stuyvesant Avenue?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.