28 Stuyvesant Avenue
Brooklyn, NY 11221BBL 3-01589-0048Map
Owner of record: Broadwill Plaza L.p.
28 Stuyvesant Avenue is a walk-up apartment building built in 1901 in Brooklyn, 11221. It has 4 residential units across 2.5 floors. The owner of record is Broadwill Plaza L.p.. HPD has recorded 39 housing violations here, most recently on August 6, 2026. 3 of the 39 most recent violations are still open.
- HPD violations
- 39
- DOB violations
- 3
- ECB violations
- 4
- HPD complaints
- 29
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 39
- CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at evidence throughout yard
Aug 6, 2026
Open — Invalid certification - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with doors intact at public hall, 1st story
Jun 1, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items, at public hall, 1st story
Jun 1, 2026
Open — False certification - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Oct 2, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing fire retardant material at ceiling throughout approx 700 sq feet in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Oct 2, 2025 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of painted over sprinkler heads approx total # 3 in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Oct 2, 2025 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed elctrical wiring at ceiling in the foyer located at apt 3, 3rd story, 1st apartment from north at east
Oct 2, 2025 · Apt 3
Closed — Violation dismissed
Show 29 more ↓
- BHazardous
Refit door in the entrance located at apt 3, 3rd story, 1st apartment from north at east
Oct 2, 2025 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Oct 2, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 2, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 2, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Oct 2, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 2, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at front gate yard
Oct 2, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of painted over sprinkler heads total of 2 at public hall, 1st story
Oct 2, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of painted over sprinkler heads total # 2 at public hall, 2nd story
Oct 2, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Oct 2, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at all yards yard
Oct 2, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Sep 14, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 3, 3rd story, 1st apartment from north at east
Sep 14, 2025 · Apt 3
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3, 3rd story, 1st apartment from north at east
Sep 14, 2025 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3, 3rd story, 1st apartment from north at east
Sep 14, 2025 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 14, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 14, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox sign missing at public hall, 1st story
Sep 14, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings sign missing
Sep 14, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Sep 14, 2025
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above ceiling in the 5th room from north located at apt 3, 3rd story, 1st apartment from north at east
Sep 14, 2025 · Apt 3
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 12 sq ft at ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Apr 3, 2024 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Apr 3, 2024 · Apt 3
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 25, 2015
Closed — Violation dismissed
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2016
Dob violation - dismissed - Construction other optional
C-construction other optional
May 12, 1989
Dob violation - active
ECB violations · 4
- Class - 3
Failure to maintain building and all parts thereof in a code compiant manner at the time of my inspection i observed sidewlak cutb at front of property exp #1 illegall off street parking pad curb cut
May 20, 2021
Resolve - Class - 3
Fence facade permit height. noted: exterior front fence us approx 7' height chain link fence. rem: conform fence to code.
Aug 9, 2018
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices appliances and wiring in use.open gem boxes,switches,outlets,faulty wiring on light fixtures throughout the building.remedy:comply w
Aug 19, 2016 · Penalty $1,600
Resolve - Class - 1
Electrical work without a permit. installed light fixtures,outlet switches circuit breakers panels and new wiring throughout the entire buildings,plan new conduit boxes and light fixtures on the outside of the
Aug 19, 2016 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jun 30, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 18, 2026 · Apt BLDG
Close - Appliance
Refrigerator
May 28, 2026 · Apt 1R
Close - Water leak
Slow leak
May 28, 2026 · Apt 1R
Close - Flooring/stairs
Floor
May 28, 2026 · Apt 1R
Close - Flooring/stairs
Stairs
May 28, 2026 · Apt 1R
Close - Plumbing
Radiator
Mar 18, 2026 · Apt 1R
Close - Appliance
Refrigerator
Mar 18, 2026 · Apt 1R
Close - Water leak
Slow leak
Mar 18, 2026 · Apt 1R
Close - Flooring/stairs
Floor
Mar 18, 2026 · Apt 1R
Close
Show 19 more ↓
- Door/window
Door
Mar 18, 2026 · Apt 1R
Close - Electric
Lighting
Mar 18, 2026 · Apt 1R
Close - Flooring/stairs
Stairs
Mar 18, 2026 · Apt 1R
Close - Heat/hot water
Apartment only
Feb 25, 2026 · Apt 1R
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt 3FL
Close - Heat/hot water
Apartment only
Jan 9, 2026 · Apt 1R
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - General
Cooking gas
Jun 11, 2024 · Apt 3
Close - Heat/hot water
Entire building
Apr 1, 2024 · Apt 2
Close - Heat/hot water
Entire building
Mar 26, 2024 · Apt 3
Close - Appliance
Electric/gas range
Mar 26, 2024 · Apt 3
Close - Unsanitary condition
Mold
Oct 6, 2023 · Apt 1L
Close - Heat/hot water
Apartment only
Feb 15, 2022 · Apt 1R
Close - Safety
Smoke detector
May 31, 2021 · Apt 1R
Close - Door/window
Door to dumbwaiter
May 31, 2021 · Apt 1R
Close - Door/window
Door
Apr 11, 2017 · Apt 1L
Close - Paint/plaster
Ceiling
Apr 11, 2017 · Apt 1L
Close - Water leak
Slow leak
Apr 11, 2017 · Apt 1L
Close - General
Signage missing
Jul 25, 2016 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1901
- Floors
- 2.5
- Residential units
- 4
- Building area
- 4,375 ft²
- Lot area
- 2,600 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1589 / 48
- Assessed value
- $557,100
- Landmark / historic district
- No
HPD registration #362917, last renewed Jul 21, 2025.
Questions about 28 Stuyvesant Avenue
Who owns 28 Stuyvesant Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Broadwill Plaza L.p..
Does 28 Stuyvesant Avenue have violations?
Yes. NYC HPD has recorded 39 housing violations at this property.
Is 28 Stuyvesant Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 28 Stuyvesant Avenue built?
City records list 1901 as the year it was built.
How many apartments are in 28 Stuyvesant Avenue?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.