1889 Eastern Parkway

Brooklyn, NY 11233BBL 3-01570-0029Map

Owner of record: 1889 Eastern Parkway Holdings LLC

1889 Eastern Parkway is a walk-up apartment building built in 1910 in Brooklyn, 11233. It has 3 residential units across 3 floors. The owner of record is 1889 Eastern Parkway Holdings LLC. HPD has recorded 37 housing violations here, most recently on April 8, 2021. 3 of the 37 most recent violations are still open.

HPD violations
37
DOB violations
8
ECB violations
19
HPD complaints
39

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 8, 2021

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 37

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 8, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 30, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 17, 2018

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective brick and mortar at front exterior wall all stories

    Jun 29, 2018

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard

    Jun 29, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 22, 2017

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 7, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 8, 2015

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required , light fixture present

    Feb 26, 2015

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the 1st room from east at south located at apt 3, 3rd story, 1st apartment from east at south

    Aug 28, 2009 · Apt 3

    Closed — Violation dismissed
Show 27 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from east at south

    Aug 28, 2009 · Apt 3

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the bathroom located at apt 3, 3rd story, 1st apartment from east at south

    Aug 28, 2009 · Apt 3

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the 4th room from east located at apt 3, 3rd story, 1st apartment from east at south

    Aug 28, 2009 · Apt 3

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Jul 4, 2009 · Apt 3

    Open — Nov sent out
  • C

    Remove the illegal fastening chain and padlock at scuttle cover to roof.

    Jul 4, 2009

    Closed — Violation dismissed
  • B

    Replace with new the missing baluster (1) at 1st story public hall stairs.

    Jul 4, 2009

    Open — Nov sent out
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following , 100 watts required.

    May 12, 2009

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Sep 4, 2008 · Apt 2

    Closed — Violation dismissed
  • B

    Replace with new the missing baluster at balustrade at public hall stairs, 2nd story

    Sep 4, 2008

    Closed — Violation dismissed
  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at west rear yard

    Sep 4, 2008

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from east located at apt 2, 2nd story, 1st apartment from east at south

    Sep 4, 2008 · Apt 2

    Open — Nov sent out
  • B

    Replace with new the missing knobs at bathtub faucets in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Sep 4, 2008 · Apt 2

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of concealed water leak at ceiling and west wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Sep 4, 2008 · Apt 2

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Sep 4, 2008 · Apt 2

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of concealed water leak at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Sep 4, 2008 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective wall cabinets in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Sep 4, 2008 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, west wall, south wall, east wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from east at south

    Sep 4, 2008 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector inoperable in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Sep 4, 2008 · Apt 2

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Sep 4, 2008 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Aug 20, 2008 · Apt 1

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of evidence of water stained ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Aug 20, 2008 · Apt 1

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of evidence of water stained ceiling in the 1st room from east located at apt 1, 1st story, 1st apartment from east at south

    Aug 20, 2008 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 1, 1st story, 1st apartment from east at south

    Aug 20, 2008 · Apt 1

    Closed — Violation dismissed
  • C

    Remove the illegal fastening double cylinder operated lock on the door in the entrance located at apt 1, 1st story, 1st apartment from east at south

    Aug 20, 2008 · Apt 1

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of water leak over ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Dec 7, 2005 · Apt 2

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts required

    Jul 9, 2003

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system .. at cellar

    Apr 5, 2003

    Closed — Violation dismissed

DOB building violations · 8

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 14, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 14, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 14, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 31, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 31, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 19, 2018

    Dob violation - dismissed
  • Construction other optional

    Ftm.3 stry+cell attach bldg,masonry walls&wood frame flrs in disrepair west wall has setttled.deter brick,crack&deter mortar found at front& rear walls.west wall settled&brick displaced.remedy:own engage lic pe &cont'r to eval bldg&rpr und perm.file for perm no later than 11/1/18 start work by 11/15/18

    Aug 28, 2018

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Install approx. 30 linear feet of sidewalk shed at front exp#1 with an overhang to protect the entrance of adjacent properties 1885 & 1891 eastern parkway extension to safeguard public & property

    Aug 15, 2018

    Dob violation - dismissed

ECB violations · 19

  • Class - 2

    28-107.7.1const documents shall be complete &/of sufficient clarity toindicate the requirements for such application.premises under alt 2job#321834798,loc folder.at time of insp found 1-plan does not indicate l

    Dec 10, 2019

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#35384192r issued on 3/20/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to safeguard all p

    May 25, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#35384191p issued on 3/20/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to carry out demol

    May 25, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to carry out demolition operations as required by section. observed at time of inspection excessive construction demolition & debris in the back yard w/black plastic bags caused hazard. make site safe.

    Mar 20, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans at job site at time of inspection. observed work in progress by approx 8 workers in all floors(cellar,1st,2nd,3rd). under permit#321788240-01-ewot issued on 11-8-18 ex

    Mar 20, 2019 · Penalty $312

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction oeprations. work in progress under permit#321788240 exp 8-31-19(permit not posted)observed at time of inspections no handrail for staircase

    Mar 20, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner.noted:@exp#1, building front brick wall with several cracks throughout entire wall.also unlevel,sagging stone @ front stairs,leaning steps observed.note:

    Nov 30, 2018 · Penalty $781

    Resolve
  • Class - 2

    Failure to maintain building walls or appurtenances.noted observed at exposure # 1 cracks at various locations. remedy: maintain exterior building wall.

    Nov 3, 2018

    Resolve
  • Class - 2

    Work w/o a permit. noted: at time of inspection observed sidewalk shedwas erected in front of bldg approx side 10 x 10ft long & 12feet height was erected w/o a permit at exp#1. remedy: comply w/code obtain all

    Sep 19, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation#35346953p issued on 08/06/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for failure to maintain

    Sep 19, 2018 · Penalty $1,250

    Resolve
Show 9 more ↓
  • Class - 1

    Work w/o a permit. upon inspection of complaint#3664705, i noticed there wasn't any permit posted for the sidewalk shed on site. i also checked the system and they do not have a permit on file w/ the dob. remed

    Sep 11, 2018

    Resolve
  • Class - 1

    Work without a permit.observed in all three floors construction work in progress.removed and installing dry walls, fire stoppers.unsafe,un approved electrical wires,plumbing pipes and gas lines works.

    Aug 22, 2018 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. observed @ exp#1 severe vertical & step cracks along w/ unlevel,sagging brick & stone from entry steps to cornice. leaning windows all levels. seperation from

    Aug 15, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to immediately notify dept that bldg has become potentially compromised. severe vertical & step cracks evident @ exp#1 throughout from entry exterior steps to cormice. also seperation from attached bldg

    Aug 15, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain bldg wall(s) or appurtenances. noted: bldg exp#1 front of bldg facade has loose bricks & mortar joints. 3 story bldg & this issue is taken place from 1st to 3rd story,walls bulging bricks en

    Aug 10, 2018 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to maintain bldg wall(s) or appurtenances. noted: @ time of insp observed @ front facade above windows & the doorway observed various checks & bldg throughout the front @ exp#1 also the front entrance s

    Aug 6, 2018 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain. noted: cracks & bulging throughout front facade above windows & doorway. remedy: maintain bldg in code compliant manner.

    Jun 30, 2018 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall at front north side a crack in mortar joint apprx 12' cause of brick from top of 2nd floor window to bottom of 3rd floor window fell causing wall to bulge in same are

    Dec 1, 2003 · Penalty $180

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall defect is vertical cracks between 1 & 2 floor windows 2 and 3 fl windows & 3 floor & roof all directly above entrance way brickw rk and broke mortar in areas in questi

    Oct 12, 1990 · Penalty $140

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Jun 23, 2018 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jul 18, 2017 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Jul 18, 2017 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2015 · Apt 3

    Close
  • Nonconst

    Vermin

    Jun 25, 2009 · Apt 3

    Close
  • Nonconst

    Vermin

    Jun 25, 2009 · Apt 3

    Close
  • Nonconst

    Vermin

    Jun 25, 2009 · Apt 3

    Close
  • Paint/plaster

    Wall

    Jun 25, 2009 · Apt 3

    Close
  • Nonconst

    Vermin

    Mar 23, 2009 · Apt 3

    Close
  • Nonconst

    Vermin

    Mar 23, 2009 · Apt 3

    Close
Show 29 more ↓
  • Nonconst

    Vermin

    Mar 23, 2009 · Apt 3

    Close
  • Nonconst

    Rubbish

    Mar 23, 2009 · Apt 3

    Close
  • Heating

    Heat related

    Nov 17, 2008 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Aug 22, 2008 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Aug 22, 2008 · Apt 2

    Close
  • General

    Cabinet

    Aug 22, 2008 · Apt 2

    Close
  • Paint/plaster

    Wall

    Aug 22, 2008 · Apt 2

    Close
  • Nonconst

    Vermin

    Aug 22, 2008 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Aug 22, 2008 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Aug 22, 2008 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Aug 19, 2008 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Aug 19, 2008 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Aug 19, 2008 · Apt 2FL

    Close
  • Plumbing

    Water-leaks

    Aug 19, 2008 · Apt 2FL

    Close
  • Plumbing

    Sewer

    May 21, 2007 · Apt 1

    Close
  • Plumbing

    Sewer

    May 21, 2007 · Apt 1

    Close
  • Heating

    Heat related

    Dec 5, 2005 · Apt 3

    Close
  • Plumbing

    Water-leaks

    Dec 5, 2005 · Apt 2

    Close
  • Nonconst

    Janitor/super

    Dec 5, 2005 · Apt 2

    Close
  • Electric

    Lighting

    Dec 5, 2005 · Apt 2

    Close
  • Heating

    Heat related

    Dec 5, 2005 · Apt 2

    Close
  • Electric

    Lighting

    Jan 27, 2005 · Apt 2

    Close
  • Plumbing

    Toilet

    Jan 27, 2005 · Apt 2

    Close
  • Nonconst

    Vermin

    Jan 27, 2005 · Apt 2

    Close
  • Plumbing

    Sewer

    Apr 29, 2004 · Apt 3FL

    Close
  • Plumbing

    Sewer

    Apr 29, 2004 · Apt 3FL

    Close
  • Plumbing

    Sewer

    Apr 19, 2004 · Apt 3FL

    Close
  • Heating

    Heat related

    Apr 4, 2003 · Apt 2 FLR

    Close
  • Heating

    Heat related

    Apr 3, 2003 · Apt 2 FLR

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1910
Floors
3
Residential units
3
Building area
2,700 ft²
Lot area
1,985 ft²
Zoning
R5
Community board
316
Council district
37
Block / lot
1570 / 29
Assessed value
$75,000
Landmark / historic district
No

HPD registration #342239, last renewed Sep 3, 2025.

Questions about 1889 Eastern Parkway

Who owns 1889 Eastern Parkway?

The owner of record in NYC Department of City Planning PLUTO data is 1889 Eastern Parkway Holdings LLC.

Does 1889 Eastern Parkway have violations?

Yes. NYC HPD has recorded 37 housing violations at this property.

Is 1889 Eastern Parkway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1889 Eastern Parkway built?

City records list 1910 as the year it was built.

How many apartments are in 1889 Eastern Parkway?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.