9 Pleasant Place
Brooklyn, NY 11233BBL 3-01569-0014Map
Owner of record: Point Holdings LLC
9 Pleasant Place is a walk-up apartment building built in 1910 in Brooklyn, 11233. It has 3 residential units across 3 floors. The owner of record is Point Holdings LLC. HPD has recorded 119 housing violations here, most recently on May 5, 2026. 37 of the 50 most recent violations are still open.
- HPD violations
- 119
- DOB violations
- 5
- ECB violations
- 8
- HPD complaints
- 112
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 119
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 4th room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Sep 29, 2025 · Apt 2
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling at closet in the private hallway from north located at apt 2, 2nd story, 1st apartment from west at north original violation 18241901 issued 20-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Sep 20, 2025 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Sep 20, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at east at boiler room
Sep 20, 2025
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling at closet in the private hallway from north located at apt 2, 2nd story, 1st apartment from west at north
Sep 20, 2025 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at closet in the private hallway from north located at apt 2, 2nd story, 1st apartment from west at north
Sep 20, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Sep 20, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Sep 20, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Sep 20, 2025 · Apt 2
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Sep 20, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south located at apt 2fl, 2nd story, 1st apartment from west at north
May 3, 2022 · Apt 2FL
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective . in the entrance located at apt 2fl, 2nd story, 1st apartment from west at north
Apr 28, 2022 · Apt 2FL
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of lockable door lock installed on door leading to fire escape window in the 1st room from east at south located at apt 2fl, 2nd story, 1st apartment from west at north
Apr 28, 2022 · Apt 2FL
Open — Invalid certification - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north
Apr 28, 2022 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 28, 2022
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of house hold items 3rd story at public hall
Feb 23, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Feb 23, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Feb 23, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Feb 23, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 19, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2016
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak evidence of leak over roof in the kitchen located at apt 3fl, 3rd story, 1st apartment from north at east
Apr 5, 2010 · Apt 3FL
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at east located at apt 3fl, 3rd story, 1st apartment from north at east
Apr 5, 2010 · Apt 3FL
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the roof so that it will not leak over and in the 2nd room from east at north located at apt 3fl, 3rd story
Apr 3, 2010 · Apt 3FL
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the roof so that it will not leak over and in the kitchen located at apt 3fl, 3rd story
Apr 3, 2010 · Apt 3FL
Open — First no access to re- inspect violation - BHazardous
Properly secure the loose ceiling light fixture in the 1st room from east at south located at apt 3fl, 3rd story
Apr 3, 2010 · Apt 3FL
Open — First no access to re- inspect violation - BHazardous
Properly secure the loose wash basin in the bathroom located at apt 3fl, 3rd story
Apr 3, 2010 · Apt 3FL
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 3fl, 3rd story
Apr 3, 2010 · Apt 3FL
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at north located at apt 3fl, 3rd story
Apr 3, 2010 · Apt 3FL
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3fl, 3rd story
Apr 3, 2010 · Apt 3FL
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets bathtub in the bathroom located at apt 3, 3rd story
Oct 5, 2009 · Apt 3
Open — First no access to re- inspect violation - BHazardous
Replace with new the missing lower window glass in the 2nd bedroom from east located at apt 3, 3rd story
Oct 5, 2009 · Apt 3
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets sink in the bathroom located at apt 3, 3rd story
Oct 5, 2009 · Apt 3
Open — First no access to re- inspect violation - BHazardous
Replace with new the missing lower window glass west room in the 1st bedroom from north at west located at apt 3, 3rd story
Oct 5, 2009 · Apt 3
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the roof so that it will not leak from ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Apr 16, 2009 · Apt 3
Open — First no access to re- inspect violation - CImmediately hazardous
Replace with new the broken or defective glass at window lower sash in the 3rd room from east at north located at apt 3, 3rd story, 1st apartment from north at east
Apr 16, 2009 · Apt 3
Open — First no access to re- inspect violation - CImmediately hazardous
M/d law abate the nuisance consisting of exposed electric wires at south wall in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Apr 16, 2009 · Apt 3
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective electric outlet at south wall in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Apr 16, 2009 · Apt 3
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Apr 16, 2009 · Apt 3
Open — First no access to re- inspect violation - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Apr 16, 2009 · Apt 3
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the nuisance consisting of rodents rat in the entire apartment located at apt 3, 3rd story
Jun 13, 2008 · Apt 3
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from west at north
Nov 20, 2007 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color .. north wall, ceiling in the bathroom located at apt 1fl, 1st story, 1st apartment from west at north
Nov 20, 2007 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1fl, 1st story, 1st apartment from west at north
Nov 20, 2007 · Apt 1FL
Open — First no access to re- inspect violation
DOB building violations · 5
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - dismissed
ECB violations · 8
- Class - 1
Work w/o a permit. at the time of inspection at approx 2:05pm on 9/16/14 at above address i observed in cellar newly installed gas piping and shut off valves for 2 gas ryers with dryers fully active.no permits
Sep 16, 2016
Resolve - Class - 1
Gas being supplied to building w/o inspectins and certification by dobat the time of my inspection at approx 2:05pm on 9/16/16 at above address i observed in cellar 2 gas dryers with new gas piping and shut off
Sep 16, 2016
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner: re:prohibited material at the time of my inspection at apprx 2:05pm on 9/16/16 at above address i observed in cellar 2 gas dryers which were connected with ga
Sep 16, 2016
Resolve - Class - 1
Failure to maintain building in code-compliant manner:lack of a systemof automatic sprinklers where required per bc 903.2, 28-954.at time ofmy inspection at apprx 2:05pm on 9/16/16 at above address i observed
Sep 16, 2016
Resolve - Class - 1
Failure to have new or altered plumbing system tested. at the time of my inspection at apprx 2:05pm on 9/16/16 at above address i observed in cellar 2 gas dryers which had new gas piping valves, fittings and s
Sep 16, 2016
Resolve - Hazardous
Failure to maintain bldg hazardous noted: plaster walls at 3rd flr west have excessive mold throughout from kitchen to bedroom. kitchen ceiling has 4" sag at center. subject wall above is inside of exterior wes
Feb 22, 2006 · Penalty $2,500
Active - Non-hazardous
Failure to maintain plumbing and/or appurtenances -non-hazardous. the lavatory in the apartment on the third floor is leaking from the 1 1/2" waste pipe and the faucet is broken at the spout. the toilet ball-fl
Jan 25, 2006 · Penalty $2,500
Active - Non-hazardous
Work without a permit:work noted:on 3rd floor front room has been subdivided by plywood door & closed off from rest of apartment entire floor area.remedy:obtain a permit if feasible or restore to prior legal co
Jul 22, 2005 · Penalty $800
Active
Complaints
- Heat/hot water
Apartment only
Oct 23, 2026 · Apt 2
Open - Unsanitary condition
Mold
Oct 23, 2026 · Apt 2
Open - Heat/hot water
Entire building
Sep 19, 2025 · Apt 2
Close - General
Cooking gas
Sep 19, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Jan 30, 2025 · Apt 2
Close - Door/window
Door
Mar 15, 2022 · Apt BLDG
Close - Door/window
Door
Mar 15, 2022 · Apt BLDG
Close - Safety
Fire escape
Mar 15, 2022 · Apt 2FL
Close - Door/window
Door
Mar 15, 2022 · Apt 2FL
Close - Unsanitary condition
Pests
Feb 19, 2018 · Apt 3
Close
Show 40 more ↓
- Plumbing
Water-leaks
Apr 1, 2010 · Apt 3FL
Close - Paint/plaster
Ceiling
Apr 1, 2010 · Apt 3FL
Close - General
Windows
Sep 30, 2009 · Apt 3
Close - General
Windows
Sep 30, 2009 · Apt 3
Close - Plumbing
Basin/sink
Sep 30, 2009 · Apt 3
Close - Plumbing
Basin/sink
Sep 30, 2009 · Apt 3
Close - Plumbing
Shower-stall
Sep 30, 2009 · Apt 3
Close - Plumbing
Bathtub/shower
Sep 30, 2009 · Apt 3
Close - Nonconst
Carbon monoxide
Sep 30, 2009 · Apt 3
Close - Nonconst
Smoke detector
Sep 30, 2009 · Apt 3
Close - Electric
Electric-supply
Sep 30, 2009 · Apt 3
Close - Electric
Wiring
Sep 30, 2009 · Apt 3
Close - General
Doors
Sep 30, 2009 · Apt 3
Close - Plumbing
Water-leaks
Sep 30, 2009 · Apt 3
Close - Nonconst
Carbon monoxide
Apr 14, 2009 · Apt 3
Close - Heating
Heat related
Jan 18, 2009 · Apt 3FLR
Close - Heating
Heat related
Oct 28, 2008 · Apt 1FL
Close - Nonconst
Vermin
Jun 11, 2008 · Apt 3
Close - Nonconst
Vermin
Jun 11, 2008 · Apt 3
Close - Construction
Roof
Jun 11, 2008 · Apt 3
Close - Plumbing
Water-leaks
Nov 8, 2007 · Apt 1FL
Close - Plumbing
Water-leaks
Nov 8, 2007 · Apt 1FL
Close - Heating
Heat related
Nov 8, 2007 · Apt 1FL
Close - Heating
Heat related
Nov 7, 2007 · Apt 3FL
Close - Plumbing
Water-leaks
Sep 18, 2007 · Apt 1FL
Close - General
Doors
Mar 26, 2007 · Apt 3
Close - Paint/plaster
Wall
Mar 26, 2007 · Apt 3
Close - Paint/plaster
Ceiling
Mar 26, 2007 · Apt 3
Close - Paint/plaster
Wall
Mar 26, 2007 · Apt 3
Close - Paint/plaster
Ceiling
Mar 26, 2007 · Apt 3
Close - Plumbing
Radiator
Feb 15, 2007 · Apt 3
Close - Paint/plaster
Door/frame
Feb 12, 2007 · Apt 3
Close - Heating
Heat related
Feb 12, 2007 · Apt 3
Close - Electric
Electric-supply
Feb 28, 2006 · Apt 3FL
Close - General
Mold
Feb 28, 2006 · Apt 3FL
Close - Electric
Electric-supply
Feb 28, 2006 · Apt 3FL
Close - Heating
Heat related
Feb 28, 2006 · Apt 3FL
Close - General
Mold
Feb 22, 2006 · Apt 3FL
Close - Heating
Heat related
Feb 22, 2006 · Apt 3FL
Close - Paint/plaster
Wall
Feb 21, 2006 · Apt 3FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1910
- Floors
- 3
- Residential units
- 3
- Building area
- 2,613 ft²
- Lot area
- 1,853 ft²
- Zoning
- R5
- Community board
- 316
- Council district
- 37
- Block / lot
- 1569 / 14
- Assessed value
- $63,840
- Landmark / historic district
- No
HPD registration #318345, last renewed Aug 20, 2025.
Questions about 9 Pleasant Place
Who owns 9 Pleasant Place?
The owner of record in NYC Department of City Planning PLUTO data is Point Holdings LLC.
Does 9 Pleasant Place have violations?
Yes. NYC HPD has recorded 119 housing violations at this property.
Is 9 Pleasant Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 9 Pleasant Place built?
City records list 1910 as the year it was built.
How many apartments are in 9 Pleasant Place?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.