2246 Fulton Street
Brooklyn, NY 11233BBL 3-01553-0018Map
Owner of record: 50 Sackman LLC
2246 Fulton Street is an elevator apartment building built in 2024 in Brooklyn, 11233. It has 119 residential units. The owner of record is 50 Sackman LLC. HPD has recorded 6 housing violations here, most recently on September 25, 2026. 1 of the 6 most recent violations are still open.
- HPD violations
- 6
- DOB violations
- 4
- ECB violations
- 4
- HPD complaints
- 8
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 6
- CImmediately hazardous
Remove all obstructions from water closet .. in the bathroom located at apt 308, 3rd story, 5th apartment from west at north
Sep 25, 2026 · Apt 308
Open — Civ14 mailed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Oct 1, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Oct 1, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Oct 1, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 1, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Oct 1, 2025
Closed — Violation dismissed
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed
ECB violations · 4
- Class - 1
Observed supported scaffold at exp#2 with workers on multiple working levels at same time, drawings calls for only one working level to be loaded/active. scaffold at 2nd and 7th floor setback missing cross brac
Mar 3, 2025 · Penalty $625
Resolve - Class - 2
At time of inspection, approved plans were provided for 8 needle beams located on 2nd and 5th floors for which no needle beams were installed or observed as per plan on the mentioned floors. there were 9 needle
Jan 24, 2025
Resolve - Class - 2
At time of inspection, i observed building passes 7 floors or 75 feet and elevator not in readiness as per bc 3303.12.2.1./ stop all work above 7th floor or 75 feet.
Jan 24, 2025 · Penalty $2,530
Resolve - Class - 2
At time of inspection, i observed the construction superintendent failed to stop work performing at above 75 feet with elevator not in readiness. also, the superintendent failed to stop the use of needle beams
Jan 24, 2025 · Penalty $5,000
Resolve
Complaints
- Plumbing
Toilet
Sep 16, 2026 · Apt 308
Close - Electric
Outlet/switch
Sep 16, 2026 · Apt 308
Close - Plumbing
Toilet
Sep 16, 2026 · Apt 308
Close - Electric
Outlet/switch
Sep 16, 2026 · Apt 308
Close - Electric
Outlet/switch
Jun 2, 2026 · Apt 811
Close - Plumbing
Water supply
May 20, 2026 · Apt 212
Close - Water leak
Slow leak
Sep 28, 2025 · Apt 812
Close - Heat/hot water
Entire building
Mar 31, 2023 · Apt 12
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2024
- Floors
- —
- Residential units
- 119
- Building area
- 82,915 ft²
- Lot area
- 15,000 ft²
- Zoning
- M1-4/R7D
- Community board
- 316
- Council district
- 37
- Block / lot
- 1553 / 18
- Assessed value
- $9,467,550
- Landmark / historic district
- No
HPD registration #391577, last renewed Jun 25, 2025.
Questions about 2246 Fulton Street
Who owns 2246 Fulton Street?
The owner of record in NYC Department of City Planning PLUTO data is 50 Sackman LLC.
Does 2246 Fulton Street have violations?
Yes. NYC HPD has recorded 6 housing violations at this property.
Is 2246 Fulton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2246 Fulton Street built?
City records list 2024 as the year it was built.
How many apartments are in 2246 Fulton Street?
It has 119 residential units and 120 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.