roofy

2246 Fulton Street

Brooklyn, NY 11233BBL 3-01553-0018Map

Owner of record: 50 Sackman LLC

2246 Fulton Street is an elevator apartment building built in 2024 in Brooklyn, 11233. It has 119 residential units. The owner of record is 50 Sackman LLC. HPD has recorded 6 housing violations here, most recently on September 25, 2026. 1 of the 6 most recent violations are still open.

HPD violations
6
DOB violations
4
ECB violations
4
HPD complaints
8

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 25, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 6

  • C

    Remove all obstructions from water closet .. in the bathroom located at apt 308, 3rd story, 5th apartment from west at north

    Sep 25, 2026 · Apt 308

    Open — Civ14 mailed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Oct 1, 2025

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Oct 1, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story

    Oct 1, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 1, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings

    Oct 1, 2025

    Closed — Violation dismissed

DOB building violations · 4

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed

ECB violations · 4

  • Class - 1

    Observed supported scaffold at exp#2 with workers on multiple working levels at same time, drawings calls for only one working level to be loaded/active. scaffold at 2nd and 7th floor setback missing cross brac

    Mar 3, 2025 · Penalty $625

    Resolve
  • Class - 2

    At time of inspection, approved plans were provided for 8 needle beams located on 2nd and 5th floors for which no needle beams were installed or observed as per plan on the mentioned floors. there were 9 needle

    Jan 24, 2025

    Resolve
  • Class - 2

    At time of inspection, i observed building passes 7 floors or 75 feet and elevator not in readiness as per bc 3303.12.2.1./ stop all work above 7th floor or 75 feet.

    Jan 24, 2025 · Penalty $2,530

    Resolve
  • Class - 2

    At time of inspection, i observed the construction superintendent failed to stop work performing at above 75 feet with elevator not in readiness. also, the superintendent failed to stop the use of needle beams

    Jan 24, 2025 · Penalty $5,000

    Resolve

Complaints

  • Plumbing

    Toilet

    Sep 16, 2026 · Apt 308

    Close
  • Electric

    Outlet/switch

    Sep 16, 2026 · Apt 308

    Close
  • Plumbing

    Toilet

    Sep 16, 2026 · Apt 308

    Close
  • Electric

    Outlet/switch

    Sep 16, 2026 · Apt 308

    Close
  • Electric

    Outlet/switch

    Jun 2, 2026 · Apt 811

    Close
  • Plumbing

    Water supply

    May 20, 2026 · Apt 212

    Close
  • Water leak

    Slow leak

    Sep 28, 2025 · Apt 812

    Close
  • Heat/hot water

    Entire building

    Mar 31, 2023 · Apt 12

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2024
Floors
—
Residential units
119
Building area
82,915 ft²
Lot area
15,000 ft²
Zoning
M1-4/R7D
Community board
316
Council district
37
Block / lot
1553 / 18
Assessed value
$9,467,550
Landmark / historic district
No

HPD registration #391577, last renewed Jun 25, 2025.

Questions about 2246 Fulton Street

Who owns 2246 Fulton Street?

The owner of record in NYC Department of City Planning PLUTO data is 50 Sackman LLC.

Does 2246 Fulton Street have violations?

Yes. NYC HPD has recorded 6 housing violations at this property.

Is 2246 Fulton Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2246 Fulton Street built?

City records list 2024 as the year it was built.

How many apartments are in 2246 Fulton Street?

It has 119 residential units and 120 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.