2136 Fulton Street
Brooklyn, NY 11233BBL 3-01551-0046Map
Owner of record: 2136 Fulton Management LLC
2136 Fulton Street is a mixed residential and retail building built in 1920 in Brooklyn, 11233. It has 2 residential units across 3 floors. The owner of record is 2136 Fulton Management LLC. HPD has recorded 280 housing violations here, most recently on September 30, 2026. 48 of the 50 most recent violations are still open.
- HPD violations
- 280
- DOB violations
- 22
- ECB violations
- 8
- HPD complaints
- 361
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 280
- ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 2nd story
Sep 30, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Sep 30, 2026
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, south wall in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 2nd door frame from south at west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, west wall, 1st window frame from west at north wall in the 1st room from north at west located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from west at north wall, 1st door frame from east at south wall in the 2nd room from north located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, west wall, 1st window frame from east at south wall in the kitchen located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from east at south wall, 1st door frame from south at west wall in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock and latch set at building front entrance door , 1st story
Sep 29, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 2nd story
Sep 29, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling at public hall, 2nd story
Sep 29, 2026
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood door at north wall in the 3rd room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at 2nd window lower sash from west at north wall in the 1st room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing escutcheon plate at riser at east wall at ceiling in the 1st room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood closet door at south wall in the 2nd room from north located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from south at west wall, 1st door frame from south at west wall in the 1st room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the 1st room from north at west located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north at west located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from south at west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Sep 29, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Sep 22, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at throughout at cellar
Sep 22, 2026
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Sep 22, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Sep 22, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling at public hall, 2nd story
Sep 22, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling at public hall, 2nd story
Jul 23, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling at public hall, 2nd story
Jul 23, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Oct 8, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Oct 8, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of hot water, exceeding the allowed maximum temperature of 130 degrees in the hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl tiles on the floor at public hall, 2nd story
Oct 6, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at the skylight at public hall, 3rd story
Oct 6, 2025
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at rats in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective shutters at the 2nd window from west at north. in the 1st room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective the shutters at the 1st window from west at north in the 1st room from north at east located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit door at north in the 2nd room from north located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective (inoperative) electrical outlet on the east wall in the 1st room from north at west located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl tiles on the floor in the kitchen located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1, 2nd story, 1st apartment from east at south
Oct 6, 2025 · Apt 1
Open — Nov sent out
DOB building violations · 22
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active
Show 12 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active
ECB violations · 8
- Class - 1
Unlawfully continued work at the on notice of a stop work order.at thetime of inspection i observed interior in place provided permit and drinking with front elevation.i also observed the facade door at exp #1
Jun 17, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation #35245343p issued on 06/06/17 & to file a certificate of correction pursuant 28-201.1 & 1rcny 102.01.no permit/application filed to
Mar 9, 2018 · Penalty $12,500
Resolve - Class - 1
Failure to comply w/comm's order contained in summ/viol#35245343p issdon 06/06/17 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01. work w/o permit.noted:at exp#1 work on masonry facade and parapet w/pi
Jan 10, 2018 · Penalty $3,125
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35245343p issued on 06/16/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a permi
Nov 25, 2017 · Penalty $800
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation #35245343p issued 06/16/17 and to file a certificate of correursuant to 28-201.1 and 1rcny 102-01. for work without a permit. rem:
Oct 12, 2017 · Penalty $400
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35245343p issued on 06/16/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.erected pipe scaffolding
Sep 6, 2017 · Penalty $800
Resolve - Class - 1
Work w/o permit.at exp# 1 work on masonry facade¶pet w/pipe scaffolding set up on sidewalk.no permits on file.rem:stop all work and obtain permit(s)
Jun 16, 2017 · Penalty $800
Resolve - Class - 2
B265. fail to file complete boiler inspection report as per dob recs . submit a current b0-9 report. correct all violating conditions and submit the certificate of correction.
May 4, 2016 · Penalty $1,250
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 14, 2026 · Apt 1NOTST
Open - Paint/plaster
Wall
Oct 14, 2026 · Apt 1NOTST
Open - Flooring/stairs
Floor
Oct 14, 2026 · Apt 1NOTST
Open - Unsanitary condition
Pests
Oct 14, 2026 · Apt 1NOTST
Open - Unsanitary condition
Pests
Oct 14, 2026 · Apt 1NOTST
Open - Paint/plaster
Wall
Oct 14, 2026 · Apt 1NOTST
Open - Door/window
Door
Oct 14, 2026 · Apt 1NOTST
Open - Door/window
Window frame
Oct 14, 2026 · Apt 1NOTST
Open - Electric
Outlet/switch
Oct 14, 2026 · Apt 1NOTST
Open - Plumbing
Toilet
Oct 14, 2026 · Apt 1NOTST
Open
Show 40 more ↓
- Paint/plaster
Ceiling
Sep 28, 2026 · Apt 1
Close - Unsanitary condition
Pests
Sep 28, 2026 · Apt 1
Close - Flooring/stairs
Floor
Sep 28, 2026 · Apt 1
Close - Plumbing
Bathtub/shower
Sep 28, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Sep 28, 2026 · Apt 1
Close - Door/window
Window frame
Sep 28, 2026 · Apt 1
Close - Door/window
Door frame
Sep 28, 2026 · Apt 1
Close - Unsanitary condition
Pests
Sep 28, 2026 · Apt 1
Close - Paint/plaster
Wall
Sep 28, 2026 · Apt 1
Close - Flooring/stairs
Floor
Sep 28, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Sep 28, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Sep 21, 2026 · Apt 33FLOO
Open - Unsanitary condition
Sewage
Jul 18, 2026 · Apt 1
Close - Water leak
Heavy flow
Jul 18, 2026 · Apt 1
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Dec 11, 2025 · Apt 1
Close - Flooring/stairs
Floor
Dec 11, 2025 · Apt 1
Close - Door/window
Window frame
Dec 11, 2025 · Apt 1
Close - Paint/plaster
Wall
Dec 11, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt 1
Close - General
Cooking gas
Dec 11, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Oct 8, 2025 · Apt 1
Close - Paint/plaster
Wall
Sep 29, 2025 · Apt 1
Close - Flooring/stairs
Floor
Sep 29, 2025 · Apt 1
Close - Paint/plaster
Wall
Sep 29, 2025 · Apt 1
Close - Plumbing
Water supply
Sep 29, 2025 · Apt 1
Close - General
Cooking gas
Sep 29, 2025 · Apt 1
Close - Door/window
Window pane
Sep 29, 2025 · Apt 1
Close - Heat/hot water
Entire building
May 4, 2025 · Apt BUILDI
Close - Flooring/stairs
Floor
Mar 13, 2025 · Apt 1
Close - Water leak
Heavy flow
Mar 13, 2025 · Apt 1
Close - Plumbing
Basin/sink
Mar 13, 2025 · Apt 1
Close - Flooring/stairs
Floor
Mar 13, 2025 · Apt 1
Close - Unsanitary condition
Pests
Mar 13, 2025 · Apt 1
Close - Flooring/stairs
Floor
Mar 13, 2025 · Apt 1
Close - Paint/plaster
Wall
Mar 13, 2025 · Apt 1
Close - General
Cooking gas
Mar 13, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Mar 13, 2025 · Apt 1
Close - Door/window
Window pane
Mar 13, 2025 · Apt 1
Close - General
Bell/buzzer/intercom
Mar 13, 2025 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1920
- Floors
- 3
- Residential units
- 2
- Building area
- 3,000 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 1551 / 46
- Assessed value
- $42,600
- Landmark / historic district
- No
HPD registration #820018, last renewed Oct 1, 2025.
Questions about 2136 Fulton Street
Who owns 2136 Fulton Street?
The owner of record in NYC Department of City Planning PLUTO data is 2136 Fulton Management LLC.
Does 2136 Fulton Street have violations?
Yes. NYC HPD has recorded 280 housing violations at this property.
Is 2136 Fulton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2136 Fulton Street built?
City records list 1920 as the year it was built.
How many apartments are in 2136 Fulton Street?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.