201 Marion Street
Brooklyn, NY 11233BBL 3-01513-0062Map
Owner of record: 201 Marion LLC
201 Marion Street is a walk-up apartment building built in 1906 in Brooklyn, 11233. It has 6 residential units across 3 floors. The owner of record is 201 Marion LLC. HPD has recorded 70 housing violations here, most recently on March 25, 2026.
- HPD violations
- 70
- DOB violations
- 10
- ECB violations
- 0
- HPD complaints
- 139
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 70
- BHazardous
Properly repair the source and abate the evidence of a water leak at the west wall in the 4th room from east located at apt 3r, 3rd story, 1st apartment from west at north
Mar 25, 2026 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Mar 25, 2026 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood door frame at the north wall in the private hallway located at apt 3r, 3rd story, 1st apartment from west at north
Mar 25, 2026 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood entrance door in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Mar 25, 2026 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around the bath tub in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Mar 25, 2026 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at the south wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Mar 25, 2026 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from north at east located at apt 1r, 1st story, 1st apartment from north at east
Jul 18, 2022 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 1st room from north at east located at apt 1r, 1st story, 1st apartment from north at east
Jul 18, 2022 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the private hallway located at apt 1r, 1st story, 1st apartment from north at east
Jul 18, 2022 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 1r, 1st story, 1st apartment from north at east
Jul 18, 2022 · Apt 1R
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak the ceiling and south wall in the kitchenette located at apt 1r, 1st story, 1st apartment from north at east
Jul 18, 2022 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and south wall in the kitchenette located at apt 1r, 1st story, 1st apartment from north at east
Jul 18, 2022 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Apr 13, 2019 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Apr 13, 2019 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 3r, 3rd story, 1st apartment from north at east
Apr 13, 2019 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at east located at apt 3r, 3rd story, 1st apartment from north at east
Apr 13, 2019 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 3r, 3rd story, 1st apartment from north at east
Apr 13, 2019 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the foyer located at apt 3r, 3rd story, 1st apartment from north at east
Apr 13, 2019 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 3r, 3rd story, 1st apartment from north at east
Apr 13, 2019 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Apr 13, 2019 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 13, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 13, 2015
Closed — Violation dismissed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic ceiling tiles, located at apt 2r, 2nd story, 2nd apartment from west at north
Jun 30, 2014 · Apt 2R
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Jun 30, 2014 · Apt 2R
Closed — Violation closed - BHazardous
Replace with new the broken or defective self-closing, solid core door at builing entrance at south , 1st story
Jun 27, 2014
Closed — Violation closed - BHazardous
Properly repair the broken or defective locking device at entrance door to bldg , 1st story
May 29, 2014
Closed — Violation closed - BHazardous
Replace with new the missing doorknobs at vestibule door , 1st story
May 29, 2014
Closed — Violation closed - BHazardous
Properly secure the loose 1st wood tread from bottom at intermediate landing at public hall stairs, 2nd story
Feb 20, 2014
Closed — Violation closed - BHazardous
Properly secure the loose nosing at 2nd and 3rd wood tread from bottom at public hall stairs, 1st story
Feb 20, 2014
Closed — Violation closed - BHazardous
Remove the torn and/or loose floor covering ... at public hall, 1st story
Feb 20, 2014
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective electrical mechanical ventilation system, in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Feb 20, 2014 · Apt 2R
Closed — Violation closed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling, in the kitchen located at apt 2r, 2nd story, 2nd apartment from west at north
Feb 20, 2014 · Apt 2R
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs located at apt 2r, 2nd story, 2nd apartment from west at north
Feb 16, 2014 · Apt 2R
Closed — Violation closed - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Feb 16, 2014
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective locking assembly entrance door to building at public hall, 1st story
Sep 17, 2013
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door lock at cellar
Jan 19, 2013
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of double cylinder key operated lock at door at vestibule , 1st story
Jan 19, 2013
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .... located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2013 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2013 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 21, 2012 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 21, 2012 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical stopper at bathtub in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 21, 2012 · Apt 2R
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of bedbugs located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 21, 2012 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at south wall in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 21, 2012 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at wasteline of wash basin in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 21, 2012 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective utensil drawer at base cabinet. in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Jan 9, 2012 · Apt 2R
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Jan 9, 2012 · Apt 2R
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors at entrance in the foyer located at apt 2r, 2nd story, 1st apartment from west at north
Jan 9, 2012 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. 1st door from west at north wall in the 4th room from north located at apt 2r, 2nd story, 1st apartment from west at north
Jan 9, 2012 · Apt 2R
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ,, in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Jan 9, 2012 · Apt 2R
Closed — Violation closed
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Mold
Jan 23, 2026 · Apt 3R
Close - Water leak
Heavy flow
Nov 8, 2022 · Apt 2R
Close - Unsanitary condition
Pests
Nov 8, 2022 · Apt 2R
Close - Water leak
Heavy flow
Nov 8, 2022 · Apt 2R
Close - Unsanitary condition
Mold
Nov 8, 2022 · Apt 2R
Close - Paint/plaster
Wall
Nov 8, 2022 · Apt 2R
Close - Water leak
Heavy flow
Oct 5, 2022 · Apt 2R
Close - General
Ventilation system
Oct 3, 2022 · Apt 2R
Close - Water leak
Damp spot
Oct 3, 2022 · Apt 2R
Close - Unsanitary condition
Mold
Oct 3, 2022 · Apt 2R
Close
Show 40 more ↓
- Water leak
Heavy flow
Sep 29, 2022 · Apt 1R
Close - Water leak
Heavy flow
Sep 29, 2022 · Apt 1R
Close - Unsanitary condition
Pests
Jul 11, 2022 · Apt 1R
Close - Water leak
Heavy flow
Jul 11, 2022 · Apt 1R
Close - Unsanitary condition
Pests
Jul 11, 2022 · Apt 1R
Close - Water leak
Heavy flow
Mar 12, 2022 · Apt 3R
Close - Water leak
Slow leak
Mar 12, 2022 · Apt 3R
Close - Water leak
Damp spot
Apr 9, 2019 · Apt 3R
Close - Water leak
Heavy flow
Apr 9, 2019 · Apt 3R
Close - Unsanitary condition
Mold
Apr 9, 2019 · Apt 3R
Close - Paint/plaster
Ceiling
Apr 9, 2019 · Apt 3R
Close - Paint/plaster
Ceiling
Apr 9, 2019 · Apt 3R
Close - Paint/plaster
Ceiling
Apr 9, 2019 · Apt 3R
Close - General
Bell/buzzer/intercom
Jul 5, 2016 · Apt 1R
Close - Paint/plaster
Ceiling
Jul 5, 2016 · Apt 1R
Close - Water leak
Slow leak
Jul 5, 2016 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Jul 9, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 9, 2015 · Apt BLDG
Close - Electric
Outlet/switch
Jun 13, 2014 · Apt 2R
Close - Plumbing
Toilet
Jun 13, 2014 · Apt 2R
Close - Unsanitary condition
Pests
Jun 13, 2014 · Apt 2R
Close - Unsanitary condition
Pests
Jun 13, 2014 · Apt 2R
Close - General
Cabinet
Feb 13, 2014 · Apt 2R
Close - Appliance
Electric/gas range
Feb 13, 2014 · Apt 2R
Close - Nonconst
Vermin
Feb 13, 2014 · Apt 2R
Close - Plumbing
Water-leaks
Feb 13, 2014 · Apt 2R
Close - Nonconst
Vermin
Feb 13, 2014 · Apt 2R
Close - Paint/plaster
Ceiling
Feb 13, 2014 · Apt 2R
Close - Paint/plaster
Wall
Feb 13, 2014 · Apt 2R
Close - Plumbing
Water-leaks
Feb 13, 2014 · Apt 2R
Close - Plumbing
Water-leaks
Jan 29, 2014 · Apt 2R
Close - General
Ceramic-tile
Jan 29, 2014 · Apt 2R
Close - Paint/plaster
Wall
Jan 29, 2014 · Apt 2R
Close - General
Ventilation system
Jan 29, 2014 · Apt 2R
Close - Paint/plaster
Ceiling
Jan 29, 2014 · Apt 2R
Close - Nonconst
Vermin
Jan 29, 2014 · Apt 2R
Close - Paint/plaster
Ceiling
Jan 29, 2014 · Apt 2R
Close - General
Stairs
Jan 29, 2014 · Apt 2R
Close - General
Floor
Jan 29, 2014 · Apt 2R
Close - General
Stairs
Jan 29, 2014 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1906
- Floors
- 3
- Residential units
- 6
- Building area
- 4,125 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 41
- Block / lot
- 1513 / 62
- Assessed value
- $612,900
- Landmark / historic district
- No
HPD registration #367194, last renewed Aug 6, 2025.
Questions about 201 Marion Street
Who owns 201 Marion Street?
The owner of record in NYC Department of City Planning PLUTO data is 201 Marion LLC.
Does 201 Marion Street have violations?
Yes. NYC HPD has recorded 70 housing violations at this property.
Is 201 Marion Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 201 Marion Street built?
City records list 1906 as the year it was built.
How many apartments are in 201 Marion Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.