713 Decatur Street
Brooklyn, NY 11233BBL 3-01502-0040Map
Owner of record: 713 Decatur Assets LLC
713 Decatur Street is a mixed residential and retail building built in 1925 in Brooklyn, 11233. It has 2 residential units across 3 floors. The owner of record is 713 Decatur Assets LLC. HPD has recorded 83 housing violations here, most recently on March 9, 2021.
- HPD violations
- 83
- DOB violations
- 6
- ECB violations
- 16
- HPD complaints
- 74
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 83
- BHazardous
Remove the illegal fastening device (hasp and catch arranged to be padlocked) at east gate leading to building entrance
Mar 9, 2021
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at east wall apprroximately 2 square feet in the bathroom located at apt 1, 2nd story, apartment at east original violation 13739405 issued 23-jul-20 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 23, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 23, 2020
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 2nd story, apartment at east
Jul 23, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at east wall apprroximately 2 square feet in the bathroom located at apt 1, 2nd story, apartment at east
Jul 23, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tiles with grouted joints of visible mold at north and west walls in the bathroom located at apt 1, 2nd story, apartment at east
Jul 23, 2020 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 1, 2nd story, apartment at east
Jul 23, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective (inoperable) electrical outlet at north wall in the 3rd room from north located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective (inoperable) mechanical ventilation system installed at ceiling in the bathroom located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective vinyl treads-2nd thru 5th up from bottom at public hall stairs, 1st story
Feb 11, 2020
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Replace with new the missing (4) balusters at balustrade at north at public hall stairs, 1st story
Feb 11, 2020
Closed — Violation closed - ANon-hazardous
Replace with new the missing (1) baluster at balustrade at east at public hall, 2nd story
Feb 11, 2020
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ..the ceiling and east wall in the bathroom located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain glazing at bathtub in the bathroom located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective header at window at north wall in the 1st room from north at east located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective (inoperable) electrical outlet at east wall in the kitchen located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly secure the loose cover at electrical outlet at north wall in the 4th room from north located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor at public hall, 2nd story
Feb 11, 2020
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ,,the ceilings and all walls at public hall
Feb 11, 2020
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall
Feb 11, 2020
Closed — Violation closed - ANon-hazardous
Properly secure the loose balustrade at north at public hall stairs, 1st story
Feb 11, 2020
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective (sagging) wood floor in the foyer located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Replace with new the broken or defective wired glass above front entrance door to building , 1st story
Feb 11, 2020
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective (inoperable) bell/buzzer/intercom system installed at west wall in the foyer located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective (inoperable) light fixture at ceiling in the 1st room from north at east located at apt 1, 2nd story, apartment at north
Feb 11, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at ceiling at public hall, 1st story
Feb 5, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - BHazardous
Remove the illegal fastening device (hasp and catch arranged to be padlocked) at east gate leading to building entrance
Feb 5, 2020
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass panel at transom at building entrance door at public hall, 1st story
Feb 5, 2020
Closed — Violation closed - BHazardous
Properly secure the loose newell post at public hall stairs, 1st story
Feb 5, 2020
Closed — Violation closed - BHazardous
Replace with new the missing 1st 4 ballasters from bottom up at public hall stairs, 1st story
Feb 5, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 3rd and 4th wood treads from bottom up at public hall stairs, 1st story
Feb 5, 2020
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and north wall at public hall, 1st story
Feb 5, 2020
Closed — Violation closed - BHazardous
Replace with new the missing ballaster at public hall, 2nd story
Feb 5, 2020
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Refit door in the 1st room from north at east located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective electric outlet at east wall in the kitchen located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from north located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the 1st room from north located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective electric light fixture at ceiling in the 1st room from north located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at upper sash at 1st window from east at south in the 4th room from north at east located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly secure the loose electric outlet at north wall in the 4th room from north at east located at apt 1, 2nd story, 1st apartment from west at north
Feb 5, 2020 · Apt 1
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at ceiling at public hall, 2nd story
Feb 5, 2020
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall, 2nd story
Feb 5, 2020
Closed — Violation closed
DOB building violations · 6
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 12, 2020
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Mar 12, 2020
Vp*-violation unserved ecb- dismissed - Construction other optional
Work without permit; noted:at top floor apt observed extended hallway partition wall approximately 5' wide and 20' in length. extension has new entrance way and related lighting and electrical work remedy: obtain all required permits
Mar 12, 2020
Vpw*-violation unserved ecb-work without permit-dismissed
ECB violations · 16
- Class - 2
Failure to comply w/commissioner's order contained in summons/v35425796x issued3/12/20 &to file c/c pursuant to28-201.1&1rcny102-01.for failure to maintain bldg in codecompliant manner:use of prohibited door &/
Jul 13, 2021
Resolve - Class - 1
Unlawful acts of failure to comply with commissioner's orders.records indicate no application was made to correct or certify ecb#35460885l and 35460886n.remedy:comply with commissioner's orders.
Jun 12, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #35425796x issued on 03/12/20 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.failure to maintain bldg in co
Apr 20, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #35425795y issued on 03/12/20 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.failure to provide unobstructe
Apr 20, 2021 · Penalty $625
Resolve - Class - 2
Failure to provide unobstructed exit passageway failure to comply w/ commissioner's order contained in summons/violation#35425795y issued3/12/20&to file certificate of correction pursuant to 28-201.1&1rcny102-0
Jan 19, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner failure to comply w/commissioner's order contained in summons/violation#35425796x issued3/12/20&to file certificate of correction pursuant to 28-201.1&1rcny102-
Jan 19, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35425796y issued on 03/12/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. for failure to maintain bldg in code compliant mann
Oct 14, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/vio#35425795y issued on 3/12/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01 for failure to provide unobstructed
Oct 14, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code compliant manner note at third floor erected ladder approx 15 degree at ledge not properly attach to building wall
Mar 16, 2020 · Penalty $625
Resolve - Class - 2
Work without a permit noted at top floro apt observed extended hallway partition wall approxmately 5' wide and 20' in length extension has new entrance way and relted lightin angd electrical work pbtain all req
Mar 12, 2020 · Penalty $1,250
Resolve
Show 6 more ↓
- Class - 1
Failure to provide unosbtructed exit passageway noted at third floro landing roof hatch and ladder are obstructed by erection of wall inside top floor apt roof ladder can only be accessed through locked door re
Mar 12, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to maintain buidling in a code compliant manner use of prohibited door &/or hardware per bc 1--8.1.8.observed roof access partition/door located between 3rd fol landoinrg & access ladder ovee stairway d
Mar 12, 2020 · Penalty $1,250
Resolve - Class - 1
Electrical work without a permit observed at 345pm(1)motion detector installed by exit door on 3rd floor no application on file for motion detector installed on 3rd floor.rem:obtain permit.
Mar 6, 2020 · Penalty $800
Resolve - Class - 2
Unapproved,unsafe,unsuitable electrical equipment devices apparatus appliances materials or wiring in all.defective fixtures and outlets throughout apartment(1).rem:comply with ec code.
Mar 6, 2020 · Penalty $800
Resolve - Class - 2
Failure to maintain building in code compliant manner. at time of inspection in shaft i observed illegal pvc piping. pvc piping can not be used in mixed use buildings., repair and/or replace
Mar 4, 2020 · Penalty $625
Resolve - Class - 2
Work without permit. at time of inspection in shaft i observed new pvc waste piping connected to existing waste stack. no permit on dob record to perform this work., obtain all permits
Mar 4, 2020
Resolve
Complaints
- Water leak
Slow leak
Jul 15, 2020 · Apt 1
Close - Water leak
Slow leak
Jun 22, 2020 · Apt 2
Close - Safety
Fire escape
Jun 6, 2020 · Apt 23RDFL
Close - Electric
Outlet/switch
Feb 6, 2020 · Apt 1
Close - Electric
Outlet/switch
Feb 6, 2020 · Apt 1
Close - Flooring/stairs
Floor
Feb 6, 2020 · Apt 1
Close - Door/window
Door
Feb 6, 2020 · Apt 1
Close - Water leak
Slow leak
Feb 6, 2020 · Apt 1
Close - Paint/plaster
Wall
Feb 6, 2020 · Apt 1
Close - Electric
Lighting
Feb 6, 2020 · Apt 1
Close
Show 40 more ↓
- Flooring/stairs
Stairs
Feb 6, 2020 · Apt 1
Close - Flooring/stairs
Floor
Feb 6, 2020 · Apt 1
Close - Appliance
Electric/gas range
Feb 6, 2020 · Apt 1
Close - Plumbing
Water supply
Feb 6, 2020 · Apt 1
Close - Safety
Smoke detector
Feb 6, 2020 · Apt 1
Close - General
Ventilation system
Feb 6, 2020 · Apt 1
Close - Unsanitary condition
Mold
Feb 6, 2020 · Apt 1
Close - Unsanitary condition
Pests
Feb 6, 2020 · Apt 1
Close - Paint/plaster
Ceiling
Jan 16, 2020 · Apt 1
Close - Flooring/stairs
Stairs
Jan 16, 2020 · Apt 1
Close - Paint/plaster
Wall
Jan 16, 2020 · Apt 1
Close - Paint/plaster
Ceiling
Jan 16, 2020 · Apt 1
Close - Electric
Lighting
Jan 16, 2020 · Apt 1
Close - Paint/plaster
Wall
Jan 16, 2020 · Apt 1
Close - Flooring/stairs
Stairs
Jan 16, 2020 · Apt 1
Close - Flooring/stairs
Stairs
Jan 16, 2020 · Apt 1
Close - Heat/hot water
Entire building
Nov 11, 2015 · Apt 2NDFL
Close - Door/window
Door
Apr 7, 2015 · Apt 2
Close - Unsanitary condition
Pests
Apr 7, 2015 · Apt 2
Close - Plumbing
Toilet
Apr 7, 2015 · Apt 2
Close - Plumbing
Bathtub/shower
Apr 7, 2015 · Apt 2
Close - Water leak
Heavy flow
Apr 7, 2015 · Apt 2
Close - Electric
Lighting
Apr 7, 2015 · Apt 2
Close - Plumbing
Basin/sink
Apr 7, 2015 · Apt 2
Close - Door/window
Door
Apr 7, 2015 · Apt 2
Close - Paint/plaster
Wall
Apr 7, 2015 · Apt 2
Close - Door/window
Window frame
Apr 7, 2015 · Apt 2
Close - Water leak
Heavy flow
Jul 2, 2014 · Apt 2FL
Close - Paint/plaster
Wall
Jun 20, 2014 · Apt 2
Close - Plumbing
Radiator
Jun 20, 2014 · Apt 2
Close - Unsanitary condition
Pests
Jun 20, 2014 · Apt 2
Close - Unsanitary condition
Pests
Jun 20, 2014 · Apt 2
Close - Unsanitary condition
Pests
Jun 6, 2014 · Apt 2
Close - Paint/plaster
Wall
Jun 6, 2014 · Apt 2
Close - Heat/hot water
Apartment only
Apr 10, 2014 · Apt 2
Close - Heat/hot water
Apartment only
Apr 1, 2014 · Apt 2NDFLR
Close - Heat/hot water
Apartment only
Mar 30, 2014 · Apt 2NDFL
Close - Nonconst
Vermin
Aug 3, 2011 · Apt 2
Close - Appliance
Refrigerator
Aug 3, 2011 · Apt 2
Close - General
Doors
Aug 3, 2011 · Apt 2
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Dec 2, 2025 | $1,900,000 | Rentals - 4-10 unit | 4 |
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1925
- Floors
- 3
- Residential units
- 2
- Building area
- 3,591 ft²
- Lot area
- 1,520 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 1502 / 40
- Assessed value
- $482,850
- Landmark / historic district
- No
HPD registration #826101, last renewed Aug 7, 2025.
Questions about 713 Decatur Street
Who owns 713 Decatur Street?
The owner of record in NYC Department of City Planning PLUTO data is 713 Decatur Assets LLC.
Does 713 Decatur Street have violations?
Yes. NYC HPD has recorded 83 housing violations at this property.
Is 713 Decatur Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 713 Decatur Street built?
City records list 1925 as the year it was built.
How many apartments are in 713 Decatur Street?
It has 2 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.