1632 Broadway
Brooklyn, NY 11207BBL 3-01499-0011Map
Owner of record: 1632 Broadway Realtycompany
1632 Broadway is a store building built in 1931 in Brooklyn, 11207. It has 4 residential units across 2 floors. The owner of record is 1632 Broadway Realtycompany. HPD has recorded 32 housing violations here, most recently on January 6, 2006. 32 of the 32 most recent violations are still open.
- HPD violations
- 32
- DOB violations
- 20
- ECB violations
- 4
- HPD complaints
- 45
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 32
- BHazardous
Provide adequate lighting for 60 watts 1st. to 2nd. story public hall.
Jan 6, 2006
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls front west room 2nd. sty. apt.
Jan 6, 2006
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass lower sash south east room 2nd. sty. apt.
Jan 6, 2006
Open — Nov sent out - BHazardous
Properly repair the broken or defective sashes make operable upper and lower windows front rooms 2nd. story apt.
Jan 6, 2006
Open — Nov sent out - BHazardous
Replace with new the missing glass lower sash window center room 2nd. story apt.
Jan 6, 2006
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures all fixtures in bathroom and kitchen, 2nd story southwest apartment.
Jul 26, 2004
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective glass upper & lower sashes kitchen bathroom, private hall 2nd story rear apartment.
Jul 26, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom, 2nd story east apt 2b.
Jul 26, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom, 1st story east apt 1b.
Jul 26, 2004
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in waste line kitchen and bathtub bathroom 2 sty. west apt. 1b er-1.
Jul 26, 2004
Open — Nov sent out
Show 22 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom 2 sty. west apt. 1b er-1.
Jul 26, 2004
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening key activated double cylinder lock door street to bldg. 1st. story.
Jul 26, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches 2 sty. west apt. 1b.
Jul 26, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective bell system enhance to 2 sty. west apt. 1b.
Jul 26, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor center room 2 sty. west apt. 1b.
Jul 26, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling east and center rooms. 2 sty. west apt. 1b
Jul 26, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department damaged by fire, walls ceiling private hall 2nd story rear apartment.
Jul 26, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings throughout, 2nd stoiry southwest apartment.
Jul 26, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective top sash at front room window, 2nd story south west apartment.
Jul 26, 2004
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective damaged by fire skylight over 2nd story public hall.
Jul 26, 2004
Open — Nov sent out - ANon-hazardous
Properly secure the loose glass all sash throughout, 2nd story southwest apartment.
Jul 26, 2004
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective gasket refrigerator lower door in the kitchen located at apt 2-a, 2nd story, apartment at north
Feb 5, 2004 · Apt 2-A
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2-a, 2nd story, apartment at north
Feb 5, 2004 · Apt 2-A
Open — Nov sent out - ANon-hazardous
Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Feb 5, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass upper sash in the kitchen and in the private hallway located at apt 2-a, 2nd story, apartment at north
Feb 5, 2004 · Apt 2-A
Open — Nov sent out - ANon-hazardous
Provide in accordance with the rules and regulations of this department a waterproof floor and base for the water closet at bathroom, 2nd story, apartment
Feb 5, 2004
Open — Nov sent out - BHazardous
Remove the torn and/or loose floor covering at bathroom, 2nd story, apartment
Feb 5, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2-a, 2nd story, apartment at north
Feb 5, 2004 · Apt 2-A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the private hall, southeast room and in the 2nd room from east at south located at apt 2-a, 2nd story
Feb 5, 2004 · Apt 2-A
Open — Nov sent out - BHazardous
Abate the nuisance consisting of excessive gap at entrance door and threshold in the entrance located at apt 2-r, 2nd story, apartment at west
Jan 7, 2004 · Apt 2-R
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak ceilings in the entire apartment located at apt 2-r, 2nd story, apartment at west
Jan 7, 2004 · Apt 2-R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires at ceiling loose and hanging in the foyer located at apt 2r, 2nd story, apartment at west
Jan 7, 2004 · Apt 2R
Open — Nov sent out
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 10 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active
ECB violations · 4
- Class - 2
No combustion air duct from the outdoors/incorrect heating pipe support/no chimney base cleanout/debris in boiler room/hwh flues have no support/hwh's are missing safety discharge pipes;correct violation and su
Sep 6, 2023 · Penalty $625
Active - Class - 3
Governal boiler 190,000btu is unused and not legally abandoned;correct violation and submit the certificate of correction
Sep 6, 2023 · Penalty $500
Active - Hazardous
Bq9/b4b/38/36/50a/50b/50c/50d/50e/.50a-flue pipe not properly sealed chimney.50b-boiler room not a storage room.50c-pipe back flow preventordown no threaded end.50d-pipe safety or relief valve discharge down no
Aug 22, 2007 · Penalty $5,000
Active - Hazardous
B4b/4a/19b/36/38/22a/.50a-holes in boiler room walls & ceiling.50b-pipe safety on relief valve discharge down no threaded end.50c-remove threaded end from back flow preventor discharge.
Aug 22, 2007 · Penalty $2,500
Active
Complaints
- Unsanitary condition
Pests
Oct 9, 2026 · Apt 1
Open - Paint/plaster
Wall
Oct 9, 2026 · Apt 1
Open - Door/window
Door
Oct 9, 2026 · Apt 1
Open - Heat/hot water
Apartment only
Jan 27, 2021 · Apt 2R
Close - Outside building
Gutter/leader
Feb 10, 2017 · Apt 3
Close - Heat/hot water
Entire building
Mar 14, 2014 · Apt 1
Close - Heating
Heat related
May 16, 2013 · Apt 2B
Close - Heating
Heat related
Jan 24, 2007 · Apt 1
Close - Heating
Heat related
Dec 28, 2006 · Apt 1
Close - Heating
Heat related
Dec 18, 2006 · Apt 1
Close
Show 35 more ↓
- Heating
Heat related
Dec 7, 2006 · Apt 1
Close - Heating
Heat related
Feb 10, 2006 · Apt 1
Close - Plumbing
Water-leaks
Jul 28, 2005 · Apt G
Close - Paint/plaster
Ceiling
Jul 28, 2005 · Apt G
Close - Plumbing
Water-leaks
Jul 28, 2005 · Apt G
Close - General
Windows
Nov 9, 2004 · Apt 2FL
Close - Nonconst
Rubbish
Feb 2, 2004 · Apt 2-A
Close - Nonconst
Vermin
Feb 2, 2004 · Apt 2-A
Close - Nonconst
Vermin
Feb 2, 2004 · Apt 2-A
Close - Paint/plaster
Wall
Feb 2, 2004 · Apt 2-A
Close - Appliance
Refrigerator
Feb 2, 2004 · Apt 2-A
Close - General
Windows
Feb 2, 2004 · Apt 2-A
Close - General
Windows
Jan 15, 2004 · Apt 2-R
Close - General
Floor
Jan 15, 2004 · Apt 2-R
Close - General
Floor
Jan 15, 2004 · Apt 2-R
Close - Electric
Bell-buzzer/intercom
Jan 15, 2004 · Apt 2-R
Close - General
Floor
Jan 15, 2004 · Apt 2-R
Close - Electric
Lighting
Jan 15, 2004 · Apt 2-R
Close - Electric
Lighting
Jan 15, 2004 · Apt 2-R
Close - Plumbing
Water-leaks
Jan 15, 2004 · Apt 2-R
Close - Plumbing
Water-leaks
Jan 15, 2004 · Apt 2-R
Close - Nonconst
Janitor/super
Jan 15, 2004 · Apt 2-R
Close - Heating
Heat related
Jan 15, 2004 · Apt 2-R
Close - General
Doors
Jan 5, 2004 · Apt 2-R
Close - Plumbing
Water-leaks
Jan 5, 2004 · Apt 2-R
Close - General
Floor
Jan 5, 2004 · Apt 2-R
Close - Electric
Lighting
Jan 5, 2004 · Apt 2-R
Close - Paint/plaster
Ceiling
Jan 5, 2004 · Apt 2-R
Close - Electric
Electric-supply
Jan 2, 2004 · Apt 2R
Close - General
Windows
Jan 2, 2004 · Apt 2R
Close - General
Windows
Jan 2, 2004 · Apt 2R
Close - Plumbing
Water-leaks
Jan 2, 2004 · Apt 2R
Close - General
Floor
Jan 2, 2004 · Apt 2R
Close - Plumbing
Water-leaks
Jan 2, 2004 · Apt 2R
Close - Heating
Heat related
Dec 14, 2003 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1931
- Floors
- 2
- Residential units
- 4
- Building area
- 9,722 ft²
- Lot area
- 5,340 ft²
- Zoning
- C8-2
- Community board
- 316
- Council district
- 41
- Block / lot
- 1499 / 11
- Assessed value
- $317,250
- Landmark / historic district
- No
Questions about 1632 Broadway
Who owns 1632 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 1632 Broadway Realtycompany.
Does 1632 Broadway have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 1632 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1632 Broadway built?
City records list 1931 as the year it was built.
How many apartments are in 1632 Broadway?
It has 4 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.