roofy

863 Hancock Street

Brooklyn, NY 11233BBL 3-01487-0049Map

Owner of record: 863 Hancock NY LLC

863 Hancock Street is a walk-up apartment building built in 1910 in Brooklyn, 11233. It has 8 residential units across 4 floors. The owner of record is 863 Hancock NY LLC. HPD has recorded 51 housing violations here, most recently on November 20, 2025.

HPD violations
51
DOB violations
24
ECB violations
17
HPD complaints
465

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 20, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 51

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 10, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 23, 2023

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    Jan 11, 2016 · Apt 3B

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at cellar

    Jan 11, 2016

    Closed — Violation dismissed
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor - at public hall, 1st story

    Sep 4, 2015

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors -all stories at public hall

    Sep 4, 2015

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 4, 2015

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2b, 2nd story

    Feb 9, 2013 · Apt 2B

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2b, 2nd story, apartment at north

    Feb 5, 2013 · Apt 2B

    Closed — Violation closed
Show 40 more ↓
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story, apartment at east

    Jan 5, 2013 · Apt 1F

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ... located at apt 1f, 1st story, apartment at east

    Jan 5, 2013 · Apt 1F

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. located at apt 1f, 1st story, apartment at east

    Dec 31, 2012 · Apt 1F

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story, apartment at east

    Dec 31, 2012 · Apt 1F

    Closed — Violation closed
  • B

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    Aug 15, 2011 · Apt 3B

    Closed — Violation closed
  • B

    Replace with new the missing glass at door building entrance

    Aug 15, 2011

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at cellar

    Jan 31, 2011

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story

    Jan 31, 2011

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall in the 3rd room from north located at apt 1l, 1st story, 1st apartment from south at west

    Jan 25, 2005 · Apt 1L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    Jan 22, 2005 · Apt 1L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from north located at apt 1-l, 1st story, 1st apartment from south at west

    Nov 26, 2004 · Apt 1-L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 2nd room from north located at apt 1-l, 1st story, 1st apartment from south at west

    Nov 26, 2004 · Apt 1-L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 3rd room from north located at apt 1-l, 1st story, 1st apartment from south at west

    Nov 26, 2004 · Apt 1-L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from east at south wall, riser from west at north wall, south wall, 1st window frame from west at north wall in the 1st kitchen from north located at apt 1-l, 1st story, 1st apartment from south at west

    Nov 26, 2004 · Apt 1-L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from west at north wall located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 13, 2004 · Apt 3L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, east wall in the 3rd room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Oct 15, 2004 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from south at west wall in the 3rd room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Oct 8, 2004 · Apt 3L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from east at south wall, 1st window sash from east at south wall in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Oct 8, 2004 · Apt 3L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 4th room from north located at apt 1r, 1st story, 1st apartment from north at east

    Oct 1, 2004 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, south wall in the 3rd room from north located at apt 1r, 1st story, 1st apartment from north at east

    Oct 1, 2004 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the 2nd room from north located at apt 1r, 1st story, 1st apartment from north at east

    Oct 1, 2004 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the 1st kitchen from north located at apt 1r, 1st story, 1st apartment from north at east

    Oct 1, 2004 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st door from west at north wall, 1st door frame from west at north wall, 1st door frame from east at south wall in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from south at west

    Sep 23, 2004 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from west at north wall, south wall, west wall in the 4th room from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from west at north wall, south wall, west wall in the 4th room from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from west at north wall, south wall, west wall in the 4th room from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st bathroom from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st bathroom from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st bathroom from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 8, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Sep 8, 2004 · Apt 3L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 4l, 4th story, 1st apartment from south at west

    Sep 4, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 2nd room from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 4, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall in the 3rd room from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 4, 2004 · Apt 4L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, west wall in the 4th room from north located at apt 4l, 4th story, 1st apartment from south at west

    Sep 4, 2004 · Apt 4L

    Closed — Violation closed

DOB building violations · 24

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 24, 2021

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
Show 14 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 28, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations · 17

  • Class - 2

    Failure to comply w/commissioner's order contained in summons/v35584414j issued8/27/21 &to file c/c pursuant to28-201.1&1rcny102-01.failure to maintain bldg in codecompliant manner.note:@exp4 above 4fl window c

    Sep 30, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. noted: at time of inspection observed at exp#4 spalling of stucco from the brick above window lintes at 4th fl. remedy: repair &/or replace.

    Aug 27, 2021 · Penalty $1,563

    Resolve
  • Class - 1

    A-8 failure to maintain building in a code complaint manner. observed at exp#4 spalling of stucco from the brick above window lintels at 4th floor. also noted breaking,rotten cornice at exp#1 corners., repair a

    Jul 15, 2021 · Penalty $312

    Resolve
  • Class - 2

    B254,32,36,50,50a,b,c,d,e. 50- spill switch defective. 50a- single wall flues thru boiler room ceiling. 50b- hot water heater installed w/o min. clearance for service access. 50c- fresh air duct missing (fire)

    Jan 4, 2013 · Penalty $2,500

    Active
  • Class - 2

    B254,36,50,50a,b,c,d,e. 50- spill switch defective. 50a- washer and dryer wall connections in boiler room. 50b- single wall boiler and hwh flues thru boiler room ceiling. 50c-fresh air duct missing fire damper

    Jan 4, 2013 · Penalty $2,500

    Active
  • Class - 2

    B254,32a,36,50,50a,b,c,d,e,f. 50- single wall boiler and hot water heater flues through boiler room ceiling. 50a- washer and dryer wall connections in boiler room. 50b- check valve not installed between back

    Jan 4, 2013 · Penalty $2,500

    Active
  • Class - 2

    B254,36,50a,b,c,d,e,32,50. 50- spill switch defective. 50a- single wall flues thru boiler room ceiling. 50b- washer & dryer wall connectionsin boiler room. 50c- individual boiler missing thermostat control. 50d

    Jan 4, 2013 · Penalty $2,500

    Active
  • Class - 2

    B254,36,50,50a,b,c,d. 50- spill switch defective. 50a- single wall flues thru boiler room ceiling. 50b- washer and dryer wall connections inboiler room. 50c- fire damper missing in boiler room fresh air duct.

    Jan 4, 2013 · Penalty $2,500

    Active
  • Class - 2

    B254,36,50,50a,b,c,d,e. 50- spill switch defective. 50a- single wall flues thru boiler room ceiling. 50b- boiler room light defective. 50c-washer and dryer wall connection in boiler room. 50d- fresh air duct

    Jan 4, 2013 · Penalty $2,500

    Active
  • Class - 2

    B254,36,50,50a,b,c,d,e,f. 50- spill switch defective. 50a- single wallflue thru boiler room ceiling. 50b- pipe leaking on hwh. 50c- circulator defective. 50d- valve leaking on return line. 50e- fresh air duct

    Jan 4, 2013 · Penalty $2,500

    Active
Show 7 more ↓
  • Class - 2

    B254,15,24a,32a,36,50,50a,b,c,d,e. 50- spill switch defective. 50a- single wall flues thru boiler room ceiling. 50b- boiler room light & defective. 50c- washer and dryer wall connections in boiler room. 50d-

    Jan 4, 2013 · Penalty $2,500

    Active
  • Class - 1

    B101 - williamson gwa052 boiler installed without bl work type permit

    Jan 4, 2013 · Penalty $8,000

    Active
  • Hazardous

    Failure to maintain bldg noted: at front facade of bldg at the 4th & 2nd fls windows are missing,wide open to elements,approx. window sizes 5'h x'w at the 2nd fl.& 2'w x 5'h at the 4th fl.remedy:maintain bldg

    Oct 29, 2007 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain noted:approximate 10 linear feet of wood girder atcelalr rear is rotten and sagging and five floor beams that at same l ocations is rotten and unsupported under bathroom for apartment # 1r a

    Feb 2, 2005 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain exterior wall. noted: the east exterior wall at 4th story center section appear to be pushing inward & remaining wall is bulging at a various location (2)the masonry blocks at parapet front

    Sep 30, 2004 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain: noted: ceiling over boiler room is part missing. at cellar level (2)door at boiler enclosed wall, now at open position. (3)cellar entrance door now at open postiton creating a hazardous con

    Sep 30, 2004 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain bldg.upon inspection at the above property 1st floor area seperated approx 1/2" in many areas,some areas are supported with steel columns other areas has more,water settle on basement floor

    Mar 26, 2004 · Penalty $2,500

    Resolve

Complaints

  • Door/window

    Door

    Apr 30, 2020 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jan 22, 2020 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Apr 7, 2016 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Apr 5, 2016 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Feb 15, 2016 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Feb 15, 2016 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Jan 14, 2016 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Jan 2, 2016 · Apt 3F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 31, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 3, 2015 · Apt 2F

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Feb 28, 2015 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Feb 24, 2015 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2015 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2015 · Apt 4B

    Close
  • Plumbing

    Water supply

    Feb 18, 2015 · Apt 4F

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2015 · Apt 4F

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2015 · Apt 4F

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2015 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Jan 6, 2015 · Apt 4F

    Close
  • Appliance

    Electric/gas range

    Dec 10, 2014 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2014 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Nov 22, 2014 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Nov 19, 2014 · Apt 4F

    Close
  • Heat/hot water

    Apartment only

    Nov 18, 2014 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2014 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Nov 9, 2014 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2014 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Nov 3, 2014 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 2, 2014 · Apt BLDG

    Close
  • Safety

    Carbon monoxide detector

    Nov 2, 2014 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Nov 2, 2014 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Nov 2, 2014 · Apt 2B

    Close
  • Plumbing

    Toilet

    Oct 31, 2014 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Oct 31, 2014 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Oct 31, 2014 · Apt 3B

    Close
  • Heating

    Heat related

    Feb 6, 2013 · Apt 2B

    Close
  • Heating

    Heat related

    Feb 5, 2013 · Apt 2B

    Close
  • Heating

    Heat related

    Feb 1, 2013 · Apt 2B

    Close
  • Heating

    Heat related

    Jan 25, 2013 · Apt 2B

    Close
  • Heating

    Heat related

    Jan 22, 2013 · Apt 1F

    Close
  • Heating

    Heat related

    Jan 22, 2013 · Apt 2B

    Close
  • Heating

    Heat related

    Jan 15, 2013 · Apt 2B

    Close
  • Plumbing

    Radiator

    Jan 14, 2013 · Apt 1F

    Close
  • Heating

    Heat related

    Jan 2, 2013 · Apt 1F

    Close
  • Heating

    Heat related

    Dec 27, 2012 · Apt 1F

    Close
  • Nonconst

    Rubbish

    Jan 11, 2012 · Apt BLDG

    Close
  • Nonconst

    Rubbish

    Jan 11, 2012 · Apt BLDG

    Close
  • Nonconst

    Rubbish

    Jan 11, 2012 · Apt BLDG

    Close
  • General

    Fire-escape

    Jan 11, 2012 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1910
Floors
4
Residential units
8
Building area
9,000 ft²
Lot area
2,500 ft²
Zoning
R6B
Community board
303
Council district
41
Block / lot
1487 / 49
Assessed value
$1,114,200
Landmark / historic district
No

HPD registration #367402, last renewed Dec 1, 2025.

Questions about 863 Hancock Street

Who owns 863 Hancock Street?

The owner of record in NYC Department of City Planning PLUTO data is 863 Hancock NY LLC.

Does 863 Hancock Street have violations?

Yes. NYC HPD has recorded 51 housing violations at this property.

Is 863 Hancock Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 863 Hancock Street built?

City records list 1910 as the year it was built.

How many apartments are in 863 Hancock Street?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.