1050 Putnam Avenue
Brooklyn, NY 11221BBL 3-01486-0014Map
Owner of record: 1050 Residence LLC
1050 Putnam Avenue is a walk-up apartment building built in 1905 in Brooklyn, 11221. It has 6 residential units across 3 floors. The owner of record is 1050 Residence LLC. HPD has recorded 30 housing violations here, most recently on July 31, 2026. 12 of the 30 most recent violations are still open.
- HPD violations
- 30
- DOB violations
- 20
- ECB violations
- 4
- HPD complaints
- 60
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- BHazardous
Properly repair or replace the broken or defective latch set and assembly to building entrtance door at public hall, 1st story
Jul 31, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of bicycle at public hall, 1st story
Jul 31, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch to building entrance door at public hall, 1st story
Jul 31, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north located at apt 1r lower level, 1st story, 1st apartment from south at west
May 13, 2026 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 1r lower level, 1st story, 1st apartment from south at west
May 13, 2026 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
May 13, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
May 13, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
May 13, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
May 13, 2026 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Dec 1, 2025 · Apt 2R
Closed — Violation dismissed
Show 20 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Dec 1, 2025 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats at front yard
Apr 15, 2025
Open — Not complied with - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Apr 15, 2025
Open — Not complied with - BHazardous
Remove the illegal fastening padlockable hasp at gate at building front , 1st story
Jul 2, 2024
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of flue pipe to chimney disconnected at gas hot water tank at boiler room
Mar 23, 2024
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds maximum temperature of 130 degrees in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Mar 23, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Feb 16, 2024 · Apt 1R
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at cellar
Feb 16, 2024
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Jan 24, 2024 · Apt 1R
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system front gate locked at cellar at boiler room
Jan 24, 2024
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 1r, 1st story, 3rd apartment from west at north
Sep 11, 2023 · Apt 1R
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the 3rd room from north located at apt 1r, 1st story, 3rd apartment from west at north
Sep 11, 2023 · Apt 1R
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycle and household items at public hall, 1st story
Sep 11, 2023
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration floor pierced stair case installed from cellar to first story creating duplex apartment 1r apartment at west located at apt, 1st story, 1st apartment from south at west
Sep 11, 2023
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of cellar being used for sleeping in conjunction with apartment 1r located at apt, 1st story, 1st apartment from south at west
Sep 11, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete tread 2nd up at front stoop entrance to building
Apr 11, 2015
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at public hall, 1st story
Mar 20, 2012
Open — Nov sent out - BHazardous
D26-10.01 adm code fire escape defective. adjust the dropladder so that it will slide easily in the guide rods rear fire escape.
Feb 17, 1984
Open — Not complied with - ANon-hazardous
D26-41.15 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Feb 17, 1984
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing.
Feb 17, 1984
Open — Not complied with
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
Show 10 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 2
Failure to maintain building in a code compliant manner. at time of inspection observed a step crack from decorative cornice to 3fl window. also observed another step crack from bottom of 3fl window lintel to 2
Jan 24, 2026
Resolve - Class - 2
At front masonry facade there are step cracks in various locations at time of inspection, repair and/or replace; repair/replace maintain building
Apr 5, 2023 · Penalty $625
Resolve - Class - 1
At time of inspection observed at apt 1l interior wooden and metal stair case installed connecting apt to cellar, full height partition walls with door erected to create office space, and water and waste line i
May 3, 2022
Resolve - Class - 2
Occupancy contrary to department records. which indicates cellar as accessory to 1st floor. at time of inspection observed cellar front arranged and occupied as an office space with 1 desk, computer and chair.,
May 3, 2022
Resolve
Complaints
- Unsanitary condition
Pests
Jun 8, 2026 · Apt GROUND
Close - Unsanitary condition
Pests
Apr 1, 2026 · Apt 1L
Close - Water leak
Slow leak
Feb 10, 2026 · Apt LOBBY
Close - Paint/plaster
Ceiling
Feb 10, 2026 · Apt LOBBY
Close - Paint/plaster
Wall
Feb 10, 2026 · Apt BASEME
Close - Paint/plaster
Ceiling
Feb 10, 2026 · Apt BASEME
Close - Paint/plaster
Wall
Jan 28, 2026 · Apt BASEME
Close - Paint/plaster
Ceiling
Jan 28, 2026 · Apt BASEME
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Jan 20, 2026 · Apt 1R
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Jan 20, 2026 · Apt 1R
Close - Paint/plaster
Wall
Jan 20, 2026 · Apt 1R
Close - Heat/hot water
Entire building
Nov 30, 2025 · Apt 2R
Close - Water leak
Heavy flow
Aug 1, 2025 · Apt 1L
Close - Door/window
Door
Feb 17, 2025 · Apt LOBBY
Close - Unsanitary condition
Pests
Feb 4, 2025 · Apt FRONTE
Close - Door/window
Door
Feb 4, 2025 · Apt FRONTE
Close - Flooring/stairs
Stairs
Feb 4, 2025 · Apt FRONTE
Close - Unsanitary condition
Mold
Aug 27, 2024 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Jul 23, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2024 · Apt 1
Close - General
Ventilation system
Mar 21, 2024 · Apt 1
Close - Safety
Carbon monoxide detector
Mar 21, 2024 · Apt 1
Close - Heat/hot water
Entire building
Feb 29, 2024 · Apt 1
Close - Heat/hot water
Entire building
Feb 28, 2024 · Apt 1
Close - Plumbing
Boiler
Feb 27, 2024 · Apt 1
Close - Heat/hot water
Entire building
Feb 27, 2024 · Apt 1
Close - Heat/hot water
Entire building
Feb 16, 2024 · Apt 1
Close - Heat/hot water
Entire building
Feb 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2024 · Apt BLDG
Close - Water leak
Heavy flow
Aug 23, 2023 · Apt 1R
Close - Paint/plaster
Wall
Aug 23, 2023 · Apt 1R
Close - Paint/plaster
Ceiling
Aug 23, 2023 · Apt 1R
Close - Unsanitary condition
Pests
Apr 25, 2023 · Apt 3
Close - Water leak
Slow leak
Jan 27, 2023 · Apt 3R
Close - Paint/plaster
Wall
Jan 27, 2023 · Apt 3R
Close - Electric
No lighting
Feb 3, 2017 · Apt 3R
Close - Electric
No lighting
Feb 3, 2017 · Apt 3R
Close - Heat/hot water
Entire building
Apr 15, 2015 · Apt 3L
Close - Heat/hot water
Entire building
Apr 9, 2015 · Apt 1L
Close - Heat/hot water
Entire building
Feb 9, 2015 · Apt 1L
Close - Plumbing
Water-leaks
Dec 10, 2013 · Apt 3L
Close - General
Doors
Mar 4, 2012 · Apt 2R
Close - Plumbing
Water-leaks
Mar 11, 2011 · Apt 3R
Close - Plumbing
Water-leaks
Mar 11, 2011 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1905
- Floors
- 3
- Residential units
- 6
- Building area
- 4,875 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 41
- Block / lot
- 1486 / 14
- Assessed value
- $724,500
- Landmark / historic district
- No
HPD registration #352398, last renewed Jul 22, 2025.
Questions about 1050 Putnam Avenue
Who owns 1050 Putnam Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1050 Residence LLC.
Does 1050 Putnam Avenue have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 1050 Putnam Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1050 Putnam Avenue built?
City records list 1905 as the year it was built.
How many apartments are in 1050 Putnam Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.