1668 Eastern Parkway is a hotel built in 2017 in Brooklyn, 11233. The owner of record is 1815 Pacific LLC. HPD has recorded 1 housing violation here, most recently on April 3, 2023.
- HPD violations
- 1
- DOB violations
- 4
- ECB violations
- 56
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 3, 2023
Closed — Violation dismissed
DOB building violations · 4
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed
ECB violations · 56
- Class - 2
Observed in basement gas line in fire pump room. sprinkler heads installed backward throughout the building. on 3rd and 5 th floors hot water heater exhausted vent is installed with pvc and on the six floor spr
Sep 18, 2025
Resolve - Class - 2
Class 2: top floor access switch up direction inoperative, repair. at the time of inspection the car failed to return to service, investigate and repair.
Sep 18, 2025
Resolve - Class - 2
Observed temporary standpipe caps( red) installed throughout building as per 3308.7 of the fire code coverings placed over fire protection devices shall be removed after the construction is complete., repair an
Oct 18, 2024
Resolve - Class - 2
Observed telecommunication system in the mechanical room located on the 5th floor housing gas fired equipment( water heater). no storage or any other system shall be installed in a mechanical room., repair and/
Oct 18, 2024
Resolve - Class - 2
Observed no ventilation in the mechanical room located on the 5th floor housing a gas fired water heater. rooms housing gas fired appliances shall be properly vented., repair and/or replace
Oct 18, 2024
Resolve - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetrations throughout the building. this can lead to a potential
Oct 18, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to maintain/display onsite docs required by bcch33 ato my inspof active nb project i observed conditions@adj property(1662easternpkwy) facade(exp2,3) cracking which may pose hazard or be indicative of s
Mar 7, 2022 · Penalty $625
Resolve - Class - 2
Bc3301.13.13 supers log i observed active site w/6workers in bldg uponrequest to view const super log i was told by competent person mr tyheem tripp that he couldnt find it.i allowed 30min for him to find it,bu
Nov 10, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain adequate housekeeping per sec requirements.atoi@8stybldg,i observed inadequate housekeeping@front of exp1 of site.improper housekeeping can create tripping hazard for workers onsite.provide
Sep 9, 2021
Resolve - Class - 2
Job fence gate not const or maintained in pursuant to subsec.atoi@8stybldg,i observed gate of fence (illegible) outward toward pedestrian sidewalk.this creates hazardous condition for pedestrians passing by.ped
Sep 9, 2021
Resolve
Show 40 more ↓
- Class - 2
Bc3314.4.8 failure to maintain pipe scaffold as per code.at time of inspection on an inactive 8 story nb construction site notice at expo.#1& 4 of the bldg pipe scaffold.the scaffold on site was not maintain as
Apr 17, 2021 · Penalty $5,000
Resolve - Class - 2
Permit holder fail to provide access and/or expose work on active site. @time of inspection on an active 8 sty nb construction site, notice the const gate close and lock from the inside with a minivan park
Jun 24, 2020 · Penalty $1,250
Resolve - Class - 1
Permit holder failed to produce for inspection the daily log that is required by bc 3321.2, item 3. at time of inspection premises under nb #321413957, competent person darren lambus failed to provide logbook f
Mar 9, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to institute and maintain safety measures and temporary construction noted at tim eof my inspection of an 8 story buidling at roof level construction work in rpogress i was encounter by the smell of exh
Feb 6, 2020 · Penalty $10,000
Resolve - Class - 1
Bc33017-failure to provide design drawing.note:at time of my inspection of an 8 story building at roof level,construction work in progress.iobserved 3 platforms built inside the elevator shaft at different leve
Feb 6, 2020 · Penalty $2,500
Resolve - Class - 1
Housekeeping note at time of my inspection of a bdlg 8 sty at roof level construction work in porgress i observed (debris) and construction materials scattered throughout site at several floors and front and
Feb 6, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3303231-temporary lighting for construction site.noted:at time of myinspection of an 8 story building at roof stage,construciton work in progress,i observed that there no lighting at jobsite from 4th story to
Feb 6, 2020 · Penalty $2,500
Resolve - Class - 1
3303.12.2=hoist not in state of readiness note:at the time of my inspection of an 8 story building at roof level construction work in progress i observed that the building had no hoist in operation neither ther
Feb 6, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain daily log for site. at inspection of active jobsite,upon review of jobsite log book i found log book had missing:(1)signature of superintendent,(2)signature/time in and out of competent pers
Sep 24, 2019 · Penalty $12,500
Resolve - Class - 1
Failure to ensure each worker has successfully the required training. at time of inspection of active jobsite,a laborer on site "shao fu li"was not able to produce a physical osha training card. instead laborer
Sep 24, 2019 · Penalty $12,500
Resolve - Class - 2
Construction superintendent failed to perform duties. at time of inspection of active construction site it was observed (1)evidence of smoking,(2)inadequate proof of osha training card (3)failure to maintain si
Sep 24, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to maintain record of preshift safety meeting for each worker.at time of inspection of active new building i asked the competent person for the records of the required pre-shift meeting,none was provide
Sep 24, 2019 · Penalty $12,500
Resolve - Class - 1
Failure to ensure each worker has successfully completed the required training. at time of inspection of active construction laborer "shad fu li" was not able to produce a osha training card. laborer's phone wa
Sep 24, 2019 · Penalty $12,500
Resolve - Class - 2
Smoking at construction site-evidence of. at time of inspection of active construction site i observed evidence of smoking at an interior,closed stairwell at approx 3rd fl level. a cigarette butt was on the tre
Sep 24, 2019 · Penalty $3,125
Resolve - Class - 1
Bc 3314.13.1 failure to maintain. at time of inspeciton, in response to complaint #3710577 obseved supported unsafe pipe scaffold with missing diagonal bracing at ground level. this hazardous condition may all
Jul 17, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3314.8.1 failure to maintain. at time of inspection in response to complaint 3710577, observed supported pipe scaffold in place with missing guardrails and toeboards. throughout all scaffolding at exp1 and
Jul 17, 2019
Resolve - Class - 1
Bc3314.5 failure to maintain at time of inspection in response to complaint 3710577 observed unsafe supported pipe scaffold with working p latforms not fully planked and wood planks not the dwn asp er code spe
Jul 17, 2019
Resolve - Class - 1
Housekeeping note at time of my inspection of a building under construction at 8 sty stage active jobsite i observed large amount of construction debris at basement and front yard expo#1 () can create a trippin
Jul 9, 2019 · Penalty $2,500
Resolve - Class - 2
3308.5;failure to maintain vertical netting note at time of inspeciton of a new buidling construction at 8 story (stage) active jobsite i observed inadequate vertical nettings at 3rd ,4th , 5th and 6th stry dec
Jul 9, 2019 · Penalty $620
Resolve - Class - 1
3303.13:hoist not in state of readiness above 75 at time of my inspection of a new bdg under construction of 8 stroy roof level construction worth in progress i observed there were no hoist in use this conditio
Jul 9, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measure or temporary construction no guard rails nb at time of my inspection of a new bldg under construction at 8 sty stage actiev jobsite i observed here were n
Jul 9, 2019 · Penalty $2,500
Resolve - Class - 1
3303.14:failure to provide adequate drainage to prevent water accumulation at construction site note at tiem of my inspection of a new building at 8th stage active jobsite i observed a (pc) apprx 7x4 feet x 4 f
Jul 9, 2019 · Penalty $2,500
Resolve - Class - 1
Hydroslatic test at time of my inspection of a bldg at 8 sty roof equal actiev jobsite i observed at 7th floor owrk in porgress after reviewing the records at jobsite nothing indicates that hydrostatic test was
Jul 9, 2019
Resolve - Class - 1
Sec. 3301.6.1 no design drawings on site-pipe scaffold & platforms. @ time of inspection observed 2 pipe scaffolds at exp#1&2 of the bldg erected approx 10feet. upon request of design drawings,i was informed
Mar 4, 2019 · Penalty $1,250
Resolve - Class - 1
Sec. 3314.1 failure to maintain scaffold as per code. at time of inspection observed supported scaffold installed approx 70ft high not fullyplanked,guardrails missing & the scaffold debris netting was torn with
Mar 4, 2019 · Penalty $2,500
Resolve - Class - 1
Sec. 28-104.2 no approved plans on site. at time of inspection no approved plans on site. plans provided to me were not stamped & the page that was page 21 of 32. this creates an unsafe condition because worker
Mar 4, 2019 · Penalty $1,250
Resolve - Class - 1
Sec. 3301.2 failure to maintain/institute safety equipment measures ortemporary construction-jobsite fence. at time of inspection observed missing panels from the jobsite fence that was collapsed onti the jobsi
Mar 4, 2019 · Penalty $2,500
Resolve - Class - 1
Sec. 3308.5 vertical netting-inadequate. at time of inspection observed inadequate netting on the guardrails at exp#3 on multiple floors up to the roof level throughout the perimeter. vertical netting was not
Mar 4, 2019 · Penalty $2,500
Resolve - Class - 1
Sec. 3309.10 inadequate roof protection. at time of inspection at exp#4 observed inadequate protection for a vent stack at adjacent property1662 eastern pkwy. this causes a dangerous condition for the adjacent
Mar 4, 2019
Resolve - Class - 2
Failure to maintain adequate housekeeping per section. as noted at time of my inspection on an active jobsite observed construction debris store at the front of the site and pcs of 2x4 and plywood in the
Sep 14, 2018
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations: as noted at time of my inspection at an active job site observed at () area in the building missing toeboard and netting. at exp
Sep 14, 2018 · Penalty $5,000
Resolve - Class - 1
3301.1.2.comply with fdny code(general)at time of inspection on a active jobsite,currently at 5 story level,observed worker welding sidewalk steel,also observed that was no fireguard as required per code.stop a
Jul 24, 2018 · Penalty $1,250
Resolve - Class - 1
No competent person on site. at time of inspection for a re-inspection on a active jobsite,currently at 5 story level,observed worker welding at exp#1,job site gate was closed.upon knock on door and request to
Jul 24, 2018
Resolve - Class - 1
No welders license(dob license)at time of inspection on a active jobsite,currently at 5 story level,observed worker welding structural steel as exp#1.upon request for dob welders license none was provided.the o
Jul 24, 2018 · Penalty $2,500
Resolve - Class - 1
Construction superintendent daily inspection log book.at time of inspection on a active jobsite,currently at 5 story level,observed that jobsite gate was closed and worker welding at exp#1,upon knock on door an
Jul 24, 2018 · Penalty $10,000
Resolve - Class - 1
Failure to maintain adequate means of egress as required-lack of egress. at time of inspection of a new bldg under construction at 5th levelactive job site. i observed that the only means of egress at this 5th
May 2, 2018 · Penalty $10,000
Resolve - Class - 1
Bc3309.12 failure to provide overhead protection for adjacent property and walkway to/from building - entrance gate. at time of inspection of a new 8 story building under construction at 5th floor level active
May 2, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to maintain job site logs as required by construction superintendent. at time of inspection of a 8 sty new steel framed bldg under construction at 5th fl stage,active job site,upon request for the const
May 2, 2018
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails. at time of inspection of a 8 sty steel framed bldg under construction at 5th fl level,active job site. i observed
May 2, 2018
Resolve - Class - 1
Sec. 3309.10 failure to provide/provide adequate protection to adjoining property during construction-no roof protection. at time of inspection of a 8 sty new steel framed bldg under construction at 5th fl leve
May 2, 2018 · Penalty $2,500
Resolve
Complaints
- Safety
Window guard broken/missing
Feb 5, 2023 · Apt 611
Close - Safety
Window guard broken/missing
Jan 25, 2023 · Apt 203
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2017
- Floors
- 8
- Residential units
- —
- Building area
- 35,812 ft²
- Lot area
- 14,677 ft²
- Zoning
- C8-2
- Community board
- 316
- Council district
- 41
- Block / lot
- 1465 / 20
- Assessed value
- $4,354,650
- Landmark / historic district
- No
HPD registration #390519, last renewed Jun 4, 2025.
Questions about 1668 Eastern Parkway
Who owns 1668 Eastern Parkway?
The owner of record in NYC Department of City Planning PLUTO data is 1815 Pacific LLC.
Does 1668 Eastern Parkway have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 1668 Eastern Parkway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1668 Eastern Parkway built?
City records list 2017 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.