2370 Pacific Street
Brooklyn, NY 11233BBL 3-01443-0025Map
Owner of record: 2370 Pacific LLC
2370 Pacific Street is a walk-up apartment building built in 1899 in Brooklyn, 11233. It has 7 residential units across 3 floors. The owner of record is 2370 Pacific LLC. HPD has recorded 46 housing violations here, most recently on October 12, 2026. 23 of the 46 most recent violations are still open.
- HPD violations
- 46
- DOB violations
- 1
- ECB violations
- 3
- HPD complaints
- 51
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 46
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at ceiling in the 3rd room from north located at apt 3c, 3rd story, 1st apartment from south at west
Oct 12, 2026 · Apt 3C
Open — Notice of issuance sent to tenant - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from north located at apt 3c, 3rd story, 1st apartment from south at west
Oct 12, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 3c, 3rd story, 1st apartment from south at west
Oct 12, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 3rd story
Oct 12, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at ceiling at public hall, 3rd story
Oct 12, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 3rd story
Oct 12, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Oct 12, 2026
Open — Nov sent out - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof . at public hall stairs, 3rd story
Oct 12, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at building front
Sep 17, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Sep 17, 2025 · Apt 3C
Open — Nov sent out
Show 36 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Sep 17, 2025 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window frame 2nd window from east at south in the 3rd room from north located at apt 3c, 3rd story, 1st apartment from south at west
Sep 17, 2025 · Apt 3C
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 30, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door leading to basement at public hall, 1st story
May 30, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 30, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 30, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
May 30, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 30, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 30, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 1, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 12, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2019
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective tin metal ceiling in the 1st room from north located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and east wall in the bathroom located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at the bathtub in the bathroom located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at the south and west walls in the bathroom located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - BHazardous
Replace with new the missing lock on the door leading to the public hall(2nd means of egrees) in the 1st room from north located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective connection at the shut off vavle on the radiatior located at the south west corner in the kitchen located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood sub-floor at the south-eastern and south-western corners in the kitchen located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of 139 degrees scalding hotwater exceeding the maximum allowable amount of 130 dgrees in the kitchen located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the celing at the north-western corner in the 1st room from north located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the south wall approx. 12 sq ft., the west wall approx.8sq ft. and the ceiling approx. 24 sq.ft. in the kitchen located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at the lower sash at the 2nd window from east at south in the kitchen located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of loose and defective light switch on the west wall in the kitchen located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of loose electric outlet and switch at the west wall in the kitchen located at apt 1f, 1st story, apartment at east
Mar 20, 2018 · Apt 1F
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present
Sep 16, 2014
Closed — Violation dismissed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed
ECB violations · 3
- Class - 1
Unsafe storage of combustible material and equipment.upon inspection,observed approx 15 workers actively using electrical tools,doing illegal demo with excessive and hazardous combustible materials and demoliti
Oct 12, 2021 · Penalty $2,500
Resolve - Class - 1
Work without permit.upon inspection,observed illegal full interior demo going on in the vacant building in all floors by approx 15 workers being demolished and removed all partition walls,all kitchens,bathroom
Oct 12, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.upon inspection,observed staircase between all floors are loose,unstable when used.no fire extinguishers,apt floors have holes in
Oct 12, 2021 · Penalty $10,000
Resolve
Complaints
- Unsanitary condition
Mold
Oct 8, 2026 · Apt 3C
Open - Appliance
Electric/gas range
Oct 8, 2026 · Apt 3C
Open - Paint/plaster
Ceiling
Oct 8, 2026 · Apt 3C
Open - General
Bell/buzzer/intercom
Oct 3, 2026 · Apt 1B
Open - Water leak
Slow leak
Sep 3, 2026 · Apt 3C
Close - Electric
Outlet/switch
Sep 3, 2026 · Apt 3C
Close - Unsanitary condition
Mold
Jun 4, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Jun 2, 2026 · Apt 3B
Close - Water leak
Damp spot
Jun 2, 2026 · Apt 3B
Close - Paint/plaster
Ceiling
Jun 2, 2026 · Apt 3B
Close
Show 40 more ↓
- Unsanitary condition
Mold
Jun 2, 2026 · Apt 3C
Close - Water leak
Slow leak
Jun 2, 2026 · Apt 3C
Close - Paint/plaster
Ceiling
Jun 2, 2026 · Apt 3C
Close - Heat/hot water
Apartment only
Nov 10, 2025 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Nov 10, 2025 · Apt 1B
Close - Water leak
Slow leak
Sep 12, 2025 · Apt 3C
Close - Unsanitary condition
Garbage/recycling storage
Jun 4, 2025 · Apt BLDG
Close - Water leak
Slow leak
Jan 28, 2025 · Apt 3C
Close - Flooring/stairs
Floor
May 3, 2018 · Apt 1F
Close - Plumbing
Basin/sink
May 3, 2018 · Apt 1F
Close - Plumbing
Radiator
Mar 14, 2018 · Apt 1F
Close - Door/window
Door
Mar 14, 2018 · Apt 1F
Close - Flooring/stairs
Floor
Mar 14, 2018 · Apt 1F
Close - Paint/plaster
Ceiling
Mar 14, 2018 · Apt 1F
Close - Plumbing
Water supply
Mar 14, 2018 · Apt 1F
Close - General
Floor
Sep 20, 2010 · Apt 3R
Close - Nonconst
Rubbish
Sep 20, 2010 · Apt 3R
Close - Electric
Wiring
Sep 20, 2010 · Apt 3R
Close - Paint/plaster
Wall
Sep 20, 2010 · Apt 3R
Close - General
Mailbox
Sep 20, 2010 · Apt 3R
Close - General
Floor
Sep 20, 2010 · Apt 3R
Close - General
Floor
Sep 20, 2010 · Apt 3R
Close - Plumbing
Water-leaks
Sep 20, 2010 · Apt 3R
Close - General
Floor
Sep 16, 2010 · Apt 3R
Close - Paint/plaster
Ceiling
Sep 16, 2010 · Apt 3R
Close - General
Mailbox
Sep 16, 2010 · Apt 3R
Close - Plumbing
Water-leaks
Sep 16, 2010 · Apt 3R
Close - Nonconst
Rubbish
Aug 4, 2010 · Apt 3R
Close - Nonconst
Rubbish
Aug 4, 2010 · Apt 3R
Close - Plumbing
Bathtub/shower
Aug 4, 2010 · Apt 3R
Close - Plumbing
Water-leaks
Aug 4, 2010 · Apt 3R
Close - Plumbing
Water-leaks
Aug 4, 2010 · Apt 3R
Close - General
Floor
Aug 4, 2010 · Apt 3R
Close - Paint/plaster
Wall
Aug 4, 2010 · Apt 3R
Close - Plumbing
Bathtub/shower
Aug 4, 2010 · Apt 3R
Close - General
Floor
Aug 4, 2010 · Apt 3R
Close - General
Floor
Aug 4, 2010 · Apt 3R
Close - General
Floor
Aug 4, 2010 · Apt 3R
Close - Electric
Wiring
Aug 4, 2010 · Apt 3R
Close - Electric
Lighting
Aug 4, 2010 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1899
- Floors
- 3
- Residential units
- 7
- Building area
- 4,180 ft²
- Lot area
- 2,143 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 37
- Block / lot
- 1443 / 25
- Assessed value
- $315,000
- Landmark / historic district
- No
HPD registration #344078, last renewed Jul 7, 2026.
Questions about 2370 Pacific Street
Who owns 2370 Pacific Street?
The owner of record in NYC Department of City Planning PLUTO data is 2370 Pacific LLC.
Does 2370 Pacific Street have violations?
Yes. NYC HPD has recorded 46 housing violations at this property.
Is 2370 Pacific Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2370 Pacific Street built?
City records list 1899 as the year it was built.
How many apartments are in 2370 Pacific Street?
It has 7 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.