1440 Lincoln Place
Brooklyn, NY 11213BBL 3-01391-0034Map
Owner of record: 1440 Lincoln Pl LLC
1440 Lincoln Place is a walk-up apartment building built in 1910 in Brooklyn, 11213. It has 5 residential units across 2 floors. The owner of record is 1440 Lincoln Pl LLC. HPD has recorded 54 housing violations here, most recently on April 8, 2026. 24 of the 50 most recent violations are still open.
- HPD violations
- 54
- DOB violations
- 7
- ECB violations
- 12
- HPD complaints
- 109
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 54
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings sign missing
Apr 8, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 8, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Apr 8, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox sign missing at public hall, 1st story
Apr 8, 2026
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Apr 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Apr 8, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycle at public hall, 2nd story
Apr 8, 2026
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Apr 8, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 4, 4th story, 1st apartment from south at west
Feb 12, 2026 · Apt 4
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from north located at apt 1, 1st story, 1st apartment from south at west
Feb 11, 2026 · Apt 1
Closed — Violation dismissed
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2022
Closed — Violation dismissed - BHazardous
§ 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition increase occupancy from 2 stories, 2 class ''a'' apartment to 3 stories, 3 class ''a'' apartment
Jun 15, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 16, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 10, 2018
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Apr 20, 2016
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 17, 2016 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at circut beaker panel in the foyer located at apt 2, 2nd story, 1st apartment from south at west
Feb 17, 2016 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 17, 2016 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 17, 2016 · Apt 2
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 2; wg to repair = 6; missing stops. incorrectly installed; new installation required in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 17, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1fl, 1st story, 1st apartment from south at west
Jun 30, 2015 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective connection wasteline under sink in the bathroom located at apt 1fl, 1st story
May 20, 2015 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the private hallway located at apt 1fl, 1st story
May 20, 2015 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1fl, 1st story
May 20, 2015 · Apt 1FL
Open — First no access to re- inspect violation - ANon-hazardous
Refit all doors in the entire apartment located at apt 1fl, 1st story
May 14, 2014 · Apt 1FL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1fl, 1st story
May 14, 2014 · Apt 1FL
Closed — Violation closed - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1fl, 1st story
May 14, 2014 · Apt 1FL
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1fl, 1st story
May 14, 2014 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective door lock in the entrance located at apt 1fl, 1st story
May 14, 2014 · Apt 1FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt 1fl, 1st story
May 14, 2014 · Apt 1FL
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1fl, 1st story
Feb 22, 2014 · Apt 1FL
Open — Second no access to re-inspect violation - BHazardous
Properly repair the broken or defective lock assembly at door in the entrance located at apt 1fl, 1st story
Feb 22, 2014 · Apt 1FL
Open — Second no access to re-inspect violation - CImmediately hazardous
Remove all obstructions and repair all defects in waste line at washbasin in the bathroom located at apt 1fl, 1st story
Feb 22, 2014 · Apt 1FL
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1fl, 1st story
Feb 22, 2014 · Apt 1FL
Open — Second no access to re-inspect violation - ANon-hazardous
Refit door in the entrance located at apt 1fl, 1st story
Feb 22, 2014 · Apt 1FL
Open — Second no access to re-inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1fl, 1st story
Feb 22, 2014 · Apt 1FL
Open — Second no access to re-inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1fl, 1st story
Feb 22, 2014 · Apt 1FL
Open — Second no access to re-inspect violation - CImmediately hazardous
Remove all obstructions from water closet .. in the bathroom located at apt 1fl, 1st story
Feb 22, 2014 · Apt 1FL
Closed — Violation closed - ANon-hazardous
Refit door in the 4th room from north located at apt 1fl, 1st story
Feb 22, 2014 · Apt 1FL
Open — Second no access to re-inspect violation - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south
Feb 9, 2012 · Apt 1FL
Open — Second no access to re-inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling at public hall, 2nd story
Jul 31, 2010
Open — Second no access to re-inspect violation - BHazardous
Properly repair the broken or defective ceiling light fixture in the 4th room from north at west located at apt 2, 2nd story
Jul 31, 2010 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the 1st room from north at east located at apt 2, 2nd story
Jul 31, 2010 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at east located at apt 2, 2nd story
Jul 31, 2010 · Apt 2
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from north at east located at apt 2, 2nd story
Jul 31, 2010 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling, in the 4th room from north located at apt 2, 2nd story, 1st apartment from east at south
Apr 5, 2010 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling, at public hall, 2nd story
Apr 5, 2010
Open — Second no access to re-inspect violation
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 30, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 30, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed
ECB violations · 12
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#39025087x issued on 07/08/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to protect adjoining structures during exca
Oct 7, 2020 · Penalty $1,250
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. observed, dob approved plans dated 12/03/2019 under permit # 321676101. un-shored excavation at rear yard exposure # 3 approx
Jul 8, 2020 · Penalty $625
Resolve - Class - 1
Failure to protect adjoining structures during excavation operations. observed, un-shored excavation at rear yard exposure # 3 approx. 5 ft. below adjacent property rear yard. rear yard is approx. 22' x 18'. pr
Jul 8, 2020 · Penalty $5,000
Resolve - Class - 2
Responsibility of owner of taller building regarding adjacent building chimney. observed, addition floor added to premises under permit # 321676101. however, chimney at 1438 lincoln place (exp #2), located at p
Jul 8, 2020 · Penalty $625
Resolve - Class - 2
Inadequate roof protection for ad3 property.at the time of my inspection of on active 4 story alt 1 site.it appears that no roof protection exist on the coping stone on both ads property to the site on 1442&143
Dec 26, 2019
Resolve - Class - 1
Failure to provide overhead protection for ad3 property.at the time ofmy inspection of an inactive 4 story alt1 site.i observed no overhead protection on expo#4 adj property 1438 lincoln place.no overhead prote
Dec 26, 2019
Resolve - Class - 1
Failure to designate and /or a construction superintendent or competent person present at site as required at time of inspection on an actiev jobsite of 4 story building i observed no superintendent or competen
Dec 16, 2019
Resolve - Class - 1
3309.1-failure to portect adjoining property at time of inspection at an active jobsiet 4 story building i observed that at expo #4 the roof was not protected as required per code.stop all work at epxo 4 extei
Dec 16, 2019
Resolve - Class - 1
Construction superintendnet failed to perform duties per code at the time of inspection at an active jobsite 4 story building under construction i observed no superintendent (waited for 45 min) 45 min no design
Dec 16, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to maintain adeqaute housekeeping per section requirements at time of inspection at an actiev jobsite 4 story building under construction i observed large amount of dirt and debris at the basements and
Dec 16, 2019 · Penalty $2,500
Resolve
Show 2 more ↓
- Non-hazardous
Occupancy contrary to that allowed by the d.o.b. records which indicatres bldg as a legal 2 family dwelling cellar storage, ordinary use & boiler room. cellar illegaly converted into a habitable living space wi
Aug 24, 2004 · Penalty $400
Resolve - Non-hazardous
Work w/out a permit:work noted:having constructed interior partition walls and ceiling at various locations at cellar creating 2 bedrooms 3 piece bathroom and kitchen at cellar level.remedy:obtain a permit if
Aug 24, 2004 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Mold
Mar 9, 2026 · Apt 2
Close - General
Signage missing
Mar 8, 2026 · Apt BLDG
Close - Water leak
Damp spot
Feb 13, 2026 · Apt 4
Close - Safety
Sprinkler
Feb 11, 2026 · Apt 4
Close - Water leak
Slow leak
Feb 10, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Feb 10, 2026 · Apt 1
Close - Water leak
Heavy flow
Feb 9, 2026 · Apt 2
Close - Water leak
Heavy flow
Feb 9, 2026 · Apt 1
Close - Water leak
Heavy flow
Feb 9, 2026 · Apt 4
Close - Heat/hot water
Apartment only
Oct 2, 2022 · Apt 4
Close
Show 40 more ↓
- General
Ventilation system
Sep 8, 2022 · Apt 4
Close - Unsanitary condition
Mold
Sep 8, 2022 · Apt 4
Close - Water leak
Damp spot
Jun 13, 2022 · Apt 4
Close - Unsanitary condition
Mold
Jun 13, 2022 · Apt 4
Close - Water leak
Slow leak
May 29, 2022 · Apt 4
Close - Unsanitary condition
Mold
May 29, 2022 · Apt 4
Close - Water leak
Heavy flow
Aug 22, 2021 · Apt 3
Close - Unsanitary condition
Pests
Feb 11, 2017 · Apt 2
Close - Heat/hot water
Apartment only
Feb 11, 2017 · Apt 2
Close - Heat/hot water
Entire building
Feb 9, 2017 · Apt 2
Close - Heat/hot water
Apartment only
Dec 11, 2016 · Apt 2
Close - Heat/hot water
Entire building
Oct 31, 2016 · Apt 2
Close - Heat/hot water
Entire building
Jul 26, 2016 · Apt 2
Close - Heat/hot water
Entire building
Jun 22, 2016 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Apr 18, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 18, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2016 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 15, 2016 · Apt 2
Close - Heat/hot water
Entire building
Feb 7, 2016 · Apt 2
Close - Heat/hot water
Entire building
Feb 6, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 29, 2015 · Apt 1
Close - Heat/hot water
Entire building
Jun 28, 2015 · Apt 1FL
Close - Heat/hot water
Entire building
Jan 27, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2014 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 11, 2014 · Apt 2
Close - Heat/hot water
Apartment only
Nov 21, 2014 · Apt 2
Close - Heat/hot water
Entire building
Nov 20, 2014 · Apt BLDG
Close - Door/window
Door frame
Nov 9, 2014 · Apt 1
Close - Door/window
Door
Nov 9, 2014 · Apt 1
Close - Door/window
Door
Nov 9, 2014 · Apt 1
Close - Heat/hot water
Apartment only
Nov 9, 2014 · Apt 1FL
Close - Door/window
Door
Oct 29, 2014 · Apt 1FL
Close - Door/window
Door
Oct 29, 2014 · Apt 1FL
Close - Heat/hot water
Apartment only
Oct 29, 2014 · Apt 1FL
Close - Door/window
Door
Oct 29, 2014 · Apt 1FL
Close - Heat/hot water
Apartment only
Mar 14, 2014 · Apt 1FLR
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1910
- Floors
- 2
- Residential units
- 5
- Building area
- 3,756 ft²
- Lot area
- 1,760 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 41
- Block / lot
- 1391 / 34
- Assessed value
- $319,050
- Landmark / historic district
- No
HPD registration #813902, last renewed Jun 30, 2025.
Questions about 1440 Lincoln Place
Who owns 1440 Lincoln Place?
The owner of record in NYC Department of City Planning PLUTO data is 1440 Lincoln Pl LLC.
Does 1440 Lincoln Place have violations?
Yes. NYC HPD has recorded 54 housing violations at this property.
Is 1440 Lincoln Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1440 Lincoln Place built?
City records list 1910 as the year it was built.
How many apartments are in 1440 Lincoln Place?
It has 5 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.