roofy

1392 Lincoln Place

Brooklyn, NY 11213BBL 3-01391-0014Map

Owner of record: Ritchie Knop INC

1392 Lincoln Place is a two-family home built in 1899 in Brooklyn, 11213. It has 2 residential units across 2 floors. The owner of record is Ritchie Knop INC. HPD has recorded 30 housing violations here, most recently on July 28, 2026. 29 of the 30 most recent violations are still open.

HPD violations
30
DOB violations
1
ECB violations
0
HPD complaints
5

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 28, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 30

  • C

    Remove the illegal fastening double cylinder lock at security gate at building entrance

    Jul 28, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tile in the private hallway located at apt 2fl, 2nd story, 1st apartment from east at south

    Jul 28, 2026 · Apt 2FL

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2fl, 2nd story, 1st apartment from east at south

    Jul 28, 2026 · Apt 2FL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 2fl, 2nd story, 1st apartment from east at south

    Jul 28, 2026 · Apt 2FL

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electric ventilation system at ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from east at south

    Jul 28, 2026 · Apt 2FL

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from east at south original violation 18204923 issued 04-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Sep 4, 2025 · Apt 2FL

    Open — Defect letter issued
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from east at south

    Sep 4, 2025 · Apt 2FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective concrete tread 3rd up from bottom at stoop

    Sep 4, 2025

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective rubber gasket at lower refrigerator door in the kitchen located at apt 2fl, 2nd story, 1st apartment from east at south

    Sep 4, 2025 · Apt 2FL

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from east at south

    Sep 4, 2025 · Apt 2FL

    Open — Nov sent out
Show 20 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2fl, 2nd story, 1st apartment from east at south

    Sep 4, 2025 · Apt 2FL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the private hallway located at apt 2fl, 2nd story, 1st apartment from east at south

    Sep 4, 2025 · Apt 2FL

    Open — Nov sent out
  • B

    Replace with new the missing wall tile at tub in the bathroom located at apt 2r, 2nd story

    Apr 5, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures stove in the kitchen located at apt 2r, 2nd story

    Apr 5, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 2r, 2nd story

    Apr 5, 2001 · Apt 2R

    Open — Nov sent out
  • C

    Remove all obstructions from water closet waste pipe water-closet in the bathroom located at apt 2r, 2nd story

    Apr 5, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective plaster ceiling near skylite at public hall stairs, 2nd story

    Apr 5, 2001

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling at 1st room from east at south, 2nd story, apartment

    Apr 5, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling at 1st room from north, 2nd story, apartment

    Apr 5, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair the broken or defective ceiling light fixture in the private hallway located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak ' in the entire apartment located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair the broken or defective bell in the entrance located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair the broken or defective upper and lower window sashes in the entire apartment located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the room in the 1st bedroom from east at south located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures no gas for range in the kitchen located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tile walls in the bathroom located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in toilet bowl in the bathroom located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin mice and roaches in the entire apartment located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the private hallway located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling ang walls in the kitchen located at apt 2r, 2nd story

    Mar 29, 2001 · Apt 2R

    Open — Nov sent out

DOB building violations · 1

  • Plumbing none

    Access to premises to inspect approved work under active laa #340470653 denied. inspection time 03:24pm at above date need access to verify work. provide access to department personnel

    Aug 25, 2017

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Appliance

    Refrigerator

    Aug 30, 2025 · Apt 2FL

    Close
  • General

    Ventilation system

    Aug 30, 2025 · Apt 2FL

    Close
  • Unsanitary condition

    Mold

    Aug 30, 2025 · Apt 2FL

    Close
  • Electric

    Wiring

    Aug 30, 2025 · Apt 2FL

    Close
  • Construction

    Roof

    Jan 21, 2009 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B1)
Year built
1899
Floors
2
Residential units
2
Building area
3,672 ft²
Lot area
3,150 ft²
Zoning
C4-3
Community board
308
Council district
41
Block / lot
1391 / 14
Assessed value
$100,200
Landmark / historic district
No

Questions about 1392 Lincoln Place

Who owns 1392 Lincoln Place?

The owner of record in NYC Department of City Planning PLUTO data is Ritchie Knop INC.

Does 1392 Lincoln Place have violations?

Yes. NYC HPD has recorded 30 housing violations at this property.

Is 1392 Lincoln Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1392 Lincoln Place built?

City records list 1899 as the year it was built.

How many apartments are in 1392 Lincoln Place?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.