1407 Lincoln Place
Brooklyn, NY 11213BBL 3-01385-0072Map
Owner of record: 1407 Holding Corp.
1407 Lincoln Place is a two-family home built in 1920 in Brooklyn, 11213. It has 2 residential units across 2 floors. The owner of record is 1407 Holding Corp.. HPD has recorded 85 housing violations here, most recently on August 30, 2026. 47 of the 50 most recent violations are still open.
- HPD violations
- 85
- DOB violations
- 0
- ECB violations
- 7
- HPD complaints
- 84
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 85
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Aug 30, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Aug 30, 2026 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Jan 2, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Jan 2, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jan 2, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jan 2, 2026 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... ceiling and east wall more than 10 sq.ft. at basement apartment in the 2nd room from north located at apt baseme, 1st apartment from west at north
Aug 8, 2024 · Apt BASEME
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wall cabinet wooden doors at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the bathroom , the private hallway located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 4th room from north located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, east wall, south wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 1st closet from east at south wall wall in the private hallway located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - BHazardous
Replace the broken or defective wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall in the 4th room from north located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 5th room from north at east located at apt 2, 2nd story, 1st apartment from west at north
May 23, 2024 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
May 17, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective outlet at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
May 17, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
May 17, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 2, 2nd story, 1st apartment from west at north
May 17, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
May 17, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective buzzer bell from building entrance to in the foyer located at apt 2, 2nd story, 1st apartment from west at north
May 17, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
May 17, 2024 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
May 17, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt second, 2nd story, 1st apartment from west at north
May 7, 2024 · Apt SECOND
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt second, 2nd story, 1st apartment from west at north
May 7, 2024 · Apt SECOND
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 8, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective casing door frame at south wall in the 1st room from north at east located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective baseboard heating system at west wall in the 1st room from north at west located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall in the private hallway located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall in the 5th room from north at west located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the 5th room from north at east located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires above range at north wall in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door frame from east at south wall in the 5th room from north at east located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall baseboard in the 1st room from north at east located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the 5th room from north at west located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the 1st room from north at east located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective doors at upper cabinet at north wall in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring counter balance at upper sash window, 2nd from east at south wall in the 5th room from north at west located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective baseboard heating system at west wall in the 4th room from north located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall in the 1st room from north at west located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from west at north
Apr 4, 2024 · Apt 2NDFL
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 7
- Class - 1
Occupancy contrary to c of o or buildings records. at time of inspection, observed full height partitions erected illegally to convert the basement into class a apartment with 2 bedrooms, living room, full gas
Apr 13, 2026 · Penalty $2,500
Active - Class - 1
Work without permit. at time of inspection, observed illegal electrical work completed in the basement. installing outlets, switches, and light fixtures for bedrooms, living room, and kitchen inside illegal cla
Apr 13, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. at time of inspection, observed in the basement on the ceilings inside the boiler
Apr 13, 2026 · Penalty $2,500
Active - Class - 1
Work without permit. at time of inspection, observed full height partitions erected illegally to sub-divide and convert the basement into an additional class a apartment with 2 bedrooms, living rom, full gas st
Apr 13, 2026 · Penalty $2,500
Active - Class - 1
Work without permit. at time of inspection, observed illegal plumbing work completed in the basement. installing unauthorized gas, water, and waste lines for gas stove/ residential sink kitchen inside illegal c
Apr 13, 2026 · Penalty $2,500
Active - Non-hazardous
Occupancy contrary to that allowed by the building department records.noted open basement for utility & storage converted to 2 bedroom liv- ing area with living room, kitchen and bathroom with working shower.
Sep 13, 2004 · Penalty $2,500
Active - Non-hazardous
Work without a permit work noted sheet rock partition approx 7-0' higherected to subdivided basement into living area 4 doors install appro x 20'x 68 kitchen cabinet installed with sink and counter top plumbing
Sep 13, 2004 · Penalty $2,500
Active
Complaints
- Heat/hot water
Apartment only
Aug 29, 2026 · Apt 1
Close - Appliance
Electric/gas range
Aug 29, 2026 · Apt 1
Close - Electric
No lighting
Mar 8, 2026 · Apt 1STFLO
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt ITWASO
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Dec 2, 2024 · Apt 2
Close - Unsanitary condition
Mold
Jul 30, 2024 · Apt BASEME
Close - Electric
Outlet/switch
May 13, 2024 · Apt 2FL
Close - Heat/hot water
Entire building
May 13, 2024 · Apt 2FL
Close - Flooring/stairs
Floor
May 7, 2024 · Apt SECOND
Close
Show 40 more ↓
- Water leak
Damp spot
May 7, 2024 · Apt SECOND
Close - Unsanitary condition
Pests
May 7, 2024 · Apt SECOND
Close - Unsanitary condition
Pests
May 7, 2024 · Apt SECOND
Close - Heat/hot water
Entire building
May 7, 2024 · Apt SECOND
Close - Unsanitary condition
Mold
May 7, 2024 · Apt SECONF
Close - Water leak
Damp spot
Apr 30, 2024 · Apt 2
Close - Flooring/stairs
Floor
Apr 30, 2024 · Apt 2
Close - Electric
Outlet/switch
Apr 30, 2024 · Apt 2
Close - General
Bell/buzzer/intercom
Apr 30, 2024 · Apt 2
Close - Flooring/stairs
Floor
Apr 30, 2024 · Apt 2
Close - Unsanitary condition
Pests
Apr 30, 2024 · Apt 2
Close - Water leak
Slow leak
Apr 30, 2024 · Apt 2
Close - Unsanitary condition
Pests
Apr 30, 2024 · Apt 2
Close - Heat/hot water
Entire building
Apr 30, 2024 · Apt 2
Close - Heat/hot water
Entire building
Apr 30, 2024 · Apt 2
Close - General
Bell/buzzer/intercom
Apr 3, 2024 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Apr 2, 2024 · Apt 2NDFL
Close - Water leak
Damp spot
Apr 2, 2024 · Apt 2NDFL
Close - Unsanitary condition
Garbage/recycling storage
Apr 2, 2024 · Apt 2NDFL
Close - Paint/plaster
Wall
Apr 2, 2024 · Apt 2NDFL
Close - Flooring/stairs
Stairs
Apr 2, 2024 · Apt 2NDFL
Close - Door/window
Door
Apr 2, 2024 · Apt 2NDFL
Close - Unsanitary condition
Pests
Apr 2, 2024 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Apr 2, 2024 · Apt 2NDFL
Close - General
Cabinet
Apr 2, 2024 · Apt 2NDFL
Close - Electric
Wiring
Apr 2, 2024 · Apt 2NDFL
Close - Electric
Outlet/switch
Apr 2, 2024 · Apt 2NDFL
Close - Paint/plaster
Wall
Apr 2, 2024 · Apt 2NDFL
Close - Flooring/stairs
Floor
Apr 2, 2024 · Apt 2NDFL
Close - Water leak
Slow leak
Apr 2, 2024 · Apt 2NDFL
Close - Unsanitary condition
Pests
Apr 2, 2024 · Apt 2NDFL
Close - Unsanitary condition
Pests
Mar 29, 2024 · Apt 2
Close - Water leak
Slow leak
Mar 29, 2024 · Apt 2
Close - General
Cabinet
Mar 29, 2024 · Apt 2
Close - Heat/hot water
Apartment only
Mar 29, 2024 · Apt 2
Close - Flooring/stairs
Floor
Mar 29, 2024 · Apt 2
Close - Unsanitary condition
Pests
Mar 29, 2024 · Apt 2
Close - Paint/plaster
Wall
Mar 29, 2024 · Apt 2
Close - Paint/plaster
Ceiling
Dec 29, 2023 · Apt BASEME
Close - Paint/plaster
Ceiling
Dec 29, 2023 · Apt BASEME
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 2,280 ft²
- Lot area
- 3,006 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 41
- Block / lot
- 1385 / 72
- Assessed value
- $56,040
- Landmark / historic district
- No
HPD registration #826899, last renewed Mar 27, 2026.
Questions about 1407 Lincoln Place
Who owns 1407 Lincoln Place?
The owner of record in NYC Department of City Planning PLUTO data is 1407 Holding Corp..
Does 1407 Lincoln Place have violations?
Yes. NYC HPD has recorded 85 housing violations at this property.
Is 1407 Lincoln Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1407 Lincoln Place built?
City records list 1920 as the year it was built.
How many apartments are in 1407 Lincoln Place?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.