roofy

1334 St Johns Place

Brooklyn, NY 11213BBL 3-01383-0037Map

Owner of record: St Johns Place Units LLC

1334 St Johns Place is a walk-up apartment building built in 1908 in Brooklyn, 11213. It has 8 residential units across 4 floors. The owner of record is St Johns Place Units LLC. HPD has recorded 212 housing violations here, most recently on September 15, 2026. 50 of the 50 most recent violations are still open.

HPD violations
212
DOB violations
25
ECB violations
20
HPD complaints
296

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 15, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 212

  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story

    Sep 15, 2026

    Open — Nov certified on time
  • B

    Replace with new the missing light fixture at ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 15, 2026 · Apt 2L

    Open — Civ14 mailed
  • C

    Provide ready access to buildings heating system door locked at basement at boiler room

    Sep 15, 2026

    Open — Nov certified on time
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 15, 2026 · Apt 2L

    Open — Invalid certification
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 15, 2026 · Apt 2L

    Open — Civ14 mailed
  • C

    Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): viol. #19178654 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.

    Aug 31, 2026

    Open — Invalid certification
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 2nd story

    Aug 31, 2026

    Open — Nov certified on time
  • C

    Trace and repair the source and abate the visible mold condition... more than 30 sq ft observed at all walls and ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 4th story

    Aug 31, 2026

    Open — Nov certified on time
  • C

    Fire escape defective. replace with new the broken, defective and/or missing 4th broken tread from bottom up at 2nd story balcony at south rear at fire escape, 2nd story

    Aug 31, 2026

    Open — Nov certified on time
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 3rd story

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 3rd story

    Aug 31, 2026

    Open — Nov certified on time
  • C

    Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 4th story

    Aug 31, 2026

    Open — Nov certified on time
  • A

    Trace and repair the source and abate the visible mold condition... less than 50 sq ft aggregate observed at ceiling at public hall, 4th story

    Aug 31, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at public hall, 4th story

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Repair the roof so that it will not leak at ceiling at public hall, 4th story

    Aug 31, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door

    Aug 31, 2026

    Open — Not complied with
  • C

    Properly repair with similar material the broken or defective wooden treads detached from stair stringer, from 1st through 12th treads up from bottom at bulkhead

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Replace with new the missing approved wired type mesh at under skylight at bulkhead

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at bulkhead

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Repair the roof so that it will not leak at ceiling at bulkhead

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Provide a safe and adequate supply of electric service to the fixtures light at ceiling at public hall, 2nd story

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 2nd story

    Aug 31, 2026

    Open — Nov certified on time
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Properly repair or replace the broken or defective latch set and it's assembly at vestibule door at public hall, 1st story

    Aug 31, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story

    Aug 31, 2026

    Open — Not complied with
  • B

    M/d law abate the nuisance consisting of plexiglass installed at vestibule door at public hall, 1st story

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Properly repair with similar material the broken or defective brick and motar joints at the west parapet wall of the air shaft at roof

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Properly repair with similar material the broken or defective stucco plaster at building east facade at parapet wall

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Properly repair or replace the broken or defective latch set and it's assembly at building entrance door

    Aug 31, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door

    Aug 31, 2026

    Open — False certification
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at building front

    Aug 31, 2026

    Open — False certification
  • B

    M/d law abate the nuisance consisting of plixeglass at building entrance door

    Aug 31, 2026

    Open — Nov certified on time
  • B

    Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at west wall in the foyer located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed
  • B

    Provide a safe and adequate supply of electric service to the fixtures electrical outlet at south wall in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed
  • B

    Provide a safe and adequate supply of electric service to the fixtures 1st and 2nd electrical outlet at east wall in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the 4th room from north located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at ceiling in the 4th room from north located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq ft observed but less than 30 sq ft inside the closet at east in the private hallway located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at west wall in the private hallway located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story

    Aug 31, 2026

    Open — Nov certified on time
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east and north wall in the 4th room from north located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective electrical outlet at east wall in the 4th room from north located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 2L

    Open — Civ14 mailed

DOB building violations · 25

  • Construction other optional

    Engineers report requested due to staircase and public hallway in state of disrepair.

    Sep 1, 2026

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
Show 15 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 21, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 7, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 2, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 24, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 20

  • Class - 1

    At time of inspection observed stair case from 4 floor to roof level stringer dislodged, tread displaced and staircase in danger to further collapse. public hallway sheetrock underneath of staircase damaged and

    Sep 1, 2026 · Penalty $2,500

    Active
  • Class - 2

    Failure to comply with the commissioner's order contained in nov#35029416k issued on 02/03/14 and to file a certificate of correction pursuant to 28-201.1,28-204.4 and 1rcny 102-01.remedy:comply with commission

    May 6, 2016 · Penalty $800

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in nov #35029416k issued on 2/3/14 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file

    Jan 25, 2016 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner; noted: at cellar level,that are several large areas of the fire stopping ceiling to be missing. remedy: maintain bldg replace fire stopping.

    Jul 9, 2015 · Penalty $5,000

    Resolve
  • Class - 2

    Unapproved unsafe unsuitable electrical equipment apparatus materials devices appliances or wiring in use. on 7/9/15 i observed: missing covers at meter bank. neutral wires for 2 sets of # 6/3 feeders. jumped @

    Jul 9, 2015 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain bldg in a code compliant manner. noted: at cellar level,boiler room door is not self closing. at roof level,access stairs is defective w/risers & treads seperating from stringers.

    Jul 9, 2015 · Penalty $2,500

    Resolve
  • Class - 2

    Work w/o a permit. noted: at 1st fl,installed new wooden floor joists.apt 1l & apt 5 has been complete renovated w/new partition walls,plumbing & electrical fixtures. remedy: obtain permits.

    Jul 9, 2015 · Penalty $4,000

    Resolve
  • Class - 2

    Electrical work w/o a permit on 7/9/15 at 11:30am i observed: new brach circuit wiring,fixtures,switches,receptacles,in basement. an application for cert of electrical inspection is not on file. remedy: obtain

    Jul 9, 2015

    Resolve
  • Class - 1

    Work no permit.observed on 7/9/15 at 11:30 am entire building bst-4 gas,water,waste,vent,fixtures-piping-new or related-hot water heaters-gas-(removed boiler).no dob approved permits.340269024 work in process.s

    Jul 9, 2015

    Resolve
  • Class - 1

    Failure to comply w/ the comm's order contained in the notice of vio#35029416k issued on 2/3/14.work w/o a permit.new partitions,electrical,plumbing & gas line in apt.2r.rem comply w/ the comm's order

    Jun 11, 2015 · Penalty $12,000

    Resolve
Show 10 more ↓
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35029416k issued on 2/3/14. work w/o a permit in apt 2r installed new walls & partitions & new gas line. remedy: comply w/the comms

    Apr 14, 2015 · Penalty $25,000

    Resolve
  • Class - 1

    Failure to comply w/ the comm's order contained in notice of violation#35029416k issued on 02/03/14.work w/o a permit in apt 2r.installed new sheetrock,gas & piping.rem:comply w/ the comm's order.

    Feb 23, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35029416k issued on 2/3/14. work w/o a permit. in apt 2r installed new sheetrock & new gas lines w/valve & piping. remedy: comply

    Dec 21, 2014 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in notice of violation #35029416k issued on 02/03/14.for illegal work @ apt.22.rem:comply with the commissioner's order.

    Oct 30, 2014 · Penalty $24,000

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in notice of violation #35029416k issued on 02/03/14.work w/o a permit @ apt.2r rem:comply with the commissioner's order.

    Sep 11, 2014 · Penalty $24,000

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in notice of violation #35029416k issued on 02/03/14.for constr.work etc done w/o a permit.rem:comply with the commissioner's order

    Jun 20, 2014 · Penalty $24,000

    Resolve
  • Class - 2

    Fail to maintain noted:vertical crack noted in bldgs north-eastern exterior facade.metal cornice loose @ its place of attachment @ the uppernorth-eastern portion of bldg.rem:maintain bldg wall.

    Jun 20, 2014 · Penalty $500

    Resolve
  • Class - 1

    Failure to comply w/ the commissioner's order contained in notice of violation # 35029416k issued on 02/03/14. work w/o permit throughout apt. 2r. no permits have been issued to remedy the condition cited. reme

    Apr 12, 2014 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. noted : @ front, metal cornice is in severe disrepair w/ bent, loose & missing pieces, also left front masonry is cracked, loose w/ leaning bricks. cement coat

    Apr 12, 2014 · Penalty $1,000

    Resolve
  • Class - 1

    "stop work order". work w/o permit. work noted. at 2nd flr apt #2r installed new sheetrock walls & partitions, studs thruout apt (2r), installed new gas line - lines w/new piping valves, etc. installed new

    Feb 3, 2014 · Penalty $1,600

    Resolve

Complaints

  • General

    Cooking gas

    Sep 14, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Sep 14, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Aug 19, 2026 · Apt 2L

    Close
  • Water leak

    Heavy flow

    Aug 19, 2026 · Apt 2L

    Close
  • Paint/plaster

    Ceiling

    Jun 5, 2026 · Apt 4L

    Close
  • Safety

    Fire escape

    Jun 5, 2026 · Apt 4L

    Close
  • Door/window

    Window frame

    Jun 5, 2026 · Apt 4L

    Close
  • Unsanitary condition

    Mold

    Jun 5, 2026 · Apt 4L

    Close
  • Safety

    Fire escape

    Jun 5, 2026 · Apt 4L

    Close
  • General

    Bell/buzzer/intercom

    Jun 5, 2026 · Apt 4L

    Close
Show 40 more ↓
  • Water leak

    Slow leak

    Jun 5, 2026 · Apt 4L

    Close
  • Unsanitary condition

    Mold

    May 22, 2026 · Apt 4L

    Close
  • Paint/plaster

    Ceiling

    May 22, 2026 · Apt 4L

    Close
  • Unsanitary condition

    Mold

    May 21, 2026 · Apt 4L

    Close
  • Paint/plaster

    Ceiling

    May 21, 2026 · Apt 4L

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 3L

    Close
  • Flooring/stairs

    Stairs

    Jan 23, 2026 · Apt XX

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2026 · Apt 2R

    Close
  • Paint/plaster

    Door/frame

    Nov 23, 2025 · Apt 4L

    Close
  • Water leak

    Slow leak

    Nov 23, 2025 · Apt 4L

    Close
  • Water leak

    Slow leak

    Sep 2, 2025 · Apt 2L

    Close
  • Paint/plaster

    Ceiling

    Sep 2, 2025 · Apt 2L

    Close
  • Electric

    Wiring

    Sep 2, 2025 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    Sep 2, 2025 · Apt 2L

    Close
  • Unsanitary condition

    Mold

    Apr 9, 2025 · Apt 2L

    Close
  • Water leak

    Slow leak

    Apr 9, 2025 · Apt 2L

    Close
  • Water leak

    Slow leak

    Mar 11, 2024 · Apt 4L

    Close
  • Plumbing

    Water supply

    May 17, 2023 · Apt 2L

    Close
  • Plumbing

    Water supply

    May 13, 2023 · Apt 2L

    Close
  • Paint/plaster

    Wall

    May 13, 2023 · Apt 2L

    Close
  • Electric

    Outlet/switch

    May 13, 2023 · Apt 2L

    Close
  • Plumbing

    Water supply

    May 8, 2023 · Apt 2L

    Close
  • Water leak

    Heavy flow

    Apr 29, 2023 · Apt 2L

    Close
  • Electric

    No lighting

    Apr 29, 2023 · Apt 2L

    Close
  • Electric

    Outlet/switch

    Apr 21, 2023 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Mar 16, 2023 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Dec 29, 2022 · Apt 4L

    Close
  • Electric

    Power outage

    Dec 15, 2022 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2022 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Feb 28, 2022 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Feb 28, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 28, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2022 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2022 · Apt 2R

    Close
  • Electric

    No lighting

    Feb 9, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Sep 3, 2021 · Apt 3FLOOR

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1908
Floors
4
Residential units
8
Building area
9,744 ft²
Lot area
3,064 ft²
Zoning
R6
Community board
308
Council district
35
Block / lot
1383 / 37
Assessed value
$607,950
Landmark / historic district
No

HPD registration #303722, last renewed Jul 23, 2025.

Questions about 1334 St Johns Place

Who owns 1334 St Johns Place?

The owner of record in NYC Department of City Planning PLUTO data is St Johns Place Units LLC.

Does 1334 St Johns Place have violations?

Yes. NYC HPD has recorded 212 housing violations at this property.

Is 1334 St Johns Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1334 St Johns Place built?

City records list 1908 as the year it was built.

How many apartments are in 1334 St Johns Place?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.