1568 Sterling Place
Brooklyn, NY 11213BBL 3-01380-0025Map
Owner of record: NYC Pact Preservation Partners LLC
1568 Sterling Place is a walk-up apartment building built in 1922 in Brooklyn, 11213. It has 31 residential units across 4 floors. The owner of record is NYC Pact Preservation Partners LLC. HPD has recorded 21 housing violations here, most recently on December 22, 2024. 13 of the 21 most recent violations are still open.
- HPD violations
- 21
- DOB violations
- 8
- ECB violations
- 2
- HPD complaints
- 14
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Dec 22, 2024 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Dec 22, 2024 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at 1st story public hall to cellar at boiler room
Dec 22, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
May 10, 2024
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 4th story
May 10, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
May 10, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jan 23, 2024
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock vestibule door at public hall, 1st story
Jan 23, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Apr 3, 2017
Closed — Violation closed
Show 11 more ↓
- BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door at public hall, 1st story
Apr 3, 2017
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable eletromagnetic locking device install at the building entrance door at public hall, 1st story
Apr 3, 2017
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant plaster ceiling at public hall, 1st story
Apr 3, 2017
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ***minimum 100 watts of incandescent light required***
Sep 6, 2010
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceilings south room 4 sty northeast apt 4b. located at apt 4b
Jul 10, 1995 · Apt 4B
Open — Nov sent out - BHazardous
Replace with new the broken or defective radiator metal cover east wall south room 4 sty northeast apt 4b. located at apt 4b
Jul 10, 1995 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed entrance door 4 sty northeast apt 4b. located at apt 4b
Jul 10, 1995 · Apt 4B
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed ceiling water leak south room 4 sty northeast apt 4b. located at apt 4b
Jul 10, 1995 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling 4 sty public hall.
Jul 10, 1995
Closed — Violation closed - BHazardous
D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east fire passage.
May 23, 1991
Closed — Violation closed - ANon-hazardous
D26-41.03 adm code file with this department a registration and occupancy statement of building.
May 23, 1991
Closed — Violation dismissed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 2
- Class - 2
Weilmclain 488 ftm boiler relief valve leaking, lwco tap leaking, missing back flow discharge, missing gauge glass guards
May 11, 2020 · Penalty $625
Resolve - Non-hazardous
6a.
Mar 14, 2000 · Penalty $2,500
Resolve
Complaints
- Water leak
Slow leak
Apr 10, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 20, 2025 · Apt 3D
Close - Paint/plaster
Ceiling
Jan 20, 2025 · Apt 3A
Close - Paint/plaster
Ceiling
Jan 20, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Dec 21, 2024 · Apt 1
Close - Heat/hot water
Entire building
Dec 9, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 7, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt 3A
Close - Heat/hot water
Entire building
Dec 4, 2024 · Apt BLDG
Close
Show 4 more ↓
- Heat/hot water
Apartment only
Nov 14, 2024 · Apt 1A
Close - Appliance
Electric/gas range
Mar 23, 2024 · Apt 1A
Close - Heat/hot water
Entire building
Jan 20, 2024 · Apt 3A
Close - Electric
No lighting
Dec 28, 2023 · Apt 4D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1922
- Floors
- 4
- Residential units
- 31
- Building area
- 24,700 ft²
- Lot area
- 7,816 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 36
- Block / lot
- 1380 / 25
- Assessed value
- $1,259,100
- Landmark / historic district
- No
HPD registration #325452, last renewed Aug 25, 2025.
Questions about 1568 Sterling Place
Who owns 1568 Sterling Place?
The owner of record in NYC Department of City Planning PLUTO data is NYC Pact Preservation Partners LLC.
Does 1568 Sterling Place have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 1568 Sterling Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1568 Sterling Place built?
City records list 1922 as the year it was built.
How many apartments are in 1568 Sterling Place?
It has 31 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.