235 Utica Avenue
Brooklyn, NY 11213BBL 3-01379-0001Map
Owner of record: 235 Utica LLC
235 Utica Avenue is a mixed residential and retail building built in 1915 in Brooklyn, 11213. It has 4 residential units across 3 floors. The owner of record is 235 Utica LLC. HPD has recorded 69 housing violations here, most recently on May 6, 2026. 16 of the 50 most recent violations are still open.
- HPD violations
- 69
- DOB violations
- 5
- ECB violations
- 2
- HPD complaints
- 35
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 69
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees fahrenheit in the kitchen located at apt 3b, 3rd story, 1st apartment from east at south
Dec 3, 2025 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east located at apt 3b, 3rd story, 1st apartment from east at south
Dec 3, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story
Dec 3, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Dec 3, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 3, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story
Dec 3, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 3, 2025
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above ceiling at public hall, 3rd story
Dec 3, 2025
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening hasp and eye capable of being padlocked at scuttle cover leading to roof at public hall, 3rd story
Dec 3, 2025
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Dec 3, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule entrance , 1st story
Dec 3, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock at door preventing entrance to fire escape in the 3rd room from east located at apt 3b, 3rd story, 1st apartment from east at south
Dec 3, 2025 · Apt 3B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Dec 3, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 27, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the kitchen , the 3rd room from east at south located at apt 3a, 3rd story, 2nd apartment from east at south
Feb 8, 2023 · Apt 3A
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of unsecured air conditioner at window in the 3rd room from east at south located at apt 3a, 3rd story, 2nd apartment from east at south
Feb 8, 2023 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 3rd story
Feb 8, 2023
Closed — Violation dismissed - ANon-hazardous
Repair leaky water closet flush pipe connection .. in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south
Feb 8, 2023 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, 3rd story
Feb 8, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 2, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Jan 6, 2022 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jan 6, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 6, 2022
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department fire retardant plaster board at ceiling and south wall at public hall, 3rd story
Jan 6, 2022
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster board at ceiling and south wall at public hall, 3rd story
Jan 6, 2022
Open — Nov sent out - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof ... at public hall, 3rd story
Jan 6, 2022
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of key operated lock installed on door leading to fire escape window in the 1st room from east located at apt 3a, 3rd story, 2nd apartment from east at south
Jan 6, 2022 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 3a, 3rd story, 2nd apartment from east at south
Jan 6, 2022 · Apt 3A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Jan 6, 2022 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 1, wg to repair = 0 in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Jan 6, 2022 · Apt 3A
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 6, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 6, 2022
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Jan 6, 2022 · Apt 3A
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 6, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jan 6, 2022
Open — Nov sent out - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located as to permit a person inside the dwelling unit to view any person outside entrance door -- 2 sty. apt. 1.
Nov 2, 2005
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective -wood frames and sash upper and lower of 2nd room from rear 2nd story apartment #1.
Nov 2, 2005
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective --glass upper sash --front south room 2 sty. apt.
Nov 2, 2005
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective --wood window frames of all rooms 2 sty. apt. 1.
Nov 2, 2005
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective --wood frames and sash upper and lower of rear room 2nd sty apt #1.
Nov 2, 2005
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of -tile hanging from ceiling of center room 2nd sty. apt. 2.
Nov 2, 2005
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective --wood frames and sash upper and lower front south of room 2nd sty apartment #1.
Nov 2, 2005
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective --rotten wood parting stipe windows throughout 2nd sty.apt. 2.
Nov 2, 2005
Closed — Violation dismissed - BHazardous
Provide hot water at all hot water fixtures -kitchen & bathroom fixtures 2nd sty. apt. 2.
Nov 2, 2005
Closed — Violation dismissed - ANon-hazardous
Paint to the satisfaction of this department the exterior window frames and sashes --all windows of 2 sty. apt.
Nov 2, 2005
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing -putty on window of front north & south room 2 sty. apt. 1.
Nov 2, 2005
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective -celotex ceiling of 3 room from front 2 sty. apt 1.
Nov 2, 2005
Closed — Violation dismissed
DOB building violations · 5
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
May 6, 2002
V%*-dob violation - dismissed
ECB violations · 2
- Hazardous
Sidewalk shed does not meet bldg code specifications defect noted:leght fixture pipe under water shed is hanging & electrical wires are exposed all the light bulbs are missing @ broken
Jun 27, 2006 · Penalty $2,000
Resolve - Hazardous
Work w/o a permit note:sidewalk shed installed under permit# 301693709has expired 12/31/04. bldg dept records indicate that the permit has been renewed.remedy:renew permit or remove sidewalk shed
Jun 27, 2006
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 30, 2025 · Apt 3B
Close - Water leak
Heavy flow
Nov 30, 2025 · Apt 3B
Close - Water leak
Slow leak
Nov 30, 2025 · Apt 3B
Close - Plumbing
Water supply
Feb 3, 2023 · Apt 3A
Close - Paint/plaster
Wall
Feb 3, 2023 · Apt 3A
Close - Plumbing
Toilet
Feb 3, 2023 · Apt 3A
Close - Door/window
Door
Feb 3, 2023 · Apt 3A
Close - Water leak
Slow leak
Feb 3, 2023 · Apt 3A
Close - Paint/plaster
Wall
Feb 3, 2023 · Apt 3A
Close - Heat/hot water
Entire building
Jan 10, 2022 · Apt BLDG
Close
Show 25 more ↓
- Heat/hot water
Apartment only
Jan 3, 2022 · Apt 3A
Close - Heating
Heat related
Dec 30, 2010 · Apt 3B
Close - Heating
Heat related
Dec 2, 2010 · Apt 3B
Close - Heating
Heat related
Nov 8, 2010 · Apt 3B
Close - General
Doors
Nov 8, 2010 · Apt 3B
Close - General
Doors
Nov 8, 2010 · Apt 3B
Close - Heating
Heat related
Nov 8, 2010 · Apt 3B
Close - General
Doors
Oct 20, 2010 · Apt 3B
Close - Heating
Heat related
Oct 20, 2010 · Apt 3B
Close - Heating
Heat-plant
Oct 20, 2010 · Apt 3B
Close - General
Doors
Oct 8, 2010 · Apt 3B
Close - General
Doors
Oct 8, 2010 · Apt 3B
Close - Heating
Heat related
Oct 8, 2010 · Apt 3B
Close - Heating
Heat related
Dec 29, 2009 · Apt 3A
Close - Heating
Heat related
Dec 29, 2009 · Apt 3B
Close - Heating
Heat related
Dec 18, 2009 · Apt 3B
Close - Heating
Heat related
Dec 7, 2009 · Apt 3B
Close - Heating
Heat related
Oct 18, 2009 · Apt 3B
Close - Plumbing
Radiator
Jan 8, 2009 · Apt 3B
Close - Heating
Heat related
Dec 26, 2008 · Apt 3B
Close - Electric
Bell-buzzer/intercom
Dec 26, 2008 · Apt 3B
Close - Heating
Heat related
Dec 22, 2008 · Apt 3B
Close - Heating
Heat related
Dec 18, 2008 · Apt 3B
Close - Heating
Heat related
Nov 26, 2008 · Apt 3B
Close - General
Mailbox
Nov 26, 2008 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1915
- Floors
- 3
- Residential units
- 4
- Building area
- 4,600 ft²
- Lot area
- 1,840 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 36
- Block / lot
- 1379 / 1
- Assessed value
- $309,150
- Landmark / historic district
- No
HPD registration #389983, last renewed Jul 29, 2025.
Questions about 235 Utica Avenue
Who owns 235 Utica Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 235 Utica LLC.
Does 235 Utica Avenue have violations?
Yes. NYC HPD has recorded 69 housing violations at this property.
Is 235 Utica Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 235 Utica Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 235 Utica Avenue?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.