1371 St Johns Place
Brooklyn, NY 11213BBL 3-01378-0077Map
Owner of record: Hamilton, Trevor P.
1371 St Johns Place is a walk-up apartment building built in 1929 in Brooklyn, 11213. It has 8 residential units across 4 floors. The owner of record is Hamilton, Trevor P.. HPD has recorded 174 housing violations here, most recently on June 9, 2026. 39 of the 50 most recent violations are still open.
- HPD violations
- 174
- DOB violations
- 29
- ECB violations
- 5
- HPD complaints
- 112
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 174
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Jun 9, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jun 9, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 9, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. , 1st story
Jun 9, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing , 1st story
Jun 9, 2026
Open — Nov sent out - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at north yard drop ladder at down position
Jun 9, 2026
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing approximately 8 metal treads up from bottom at balcony from 2nd to 3rd stories at fire escape at north yard
Jun 9, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the .. yard at north
Jun 9, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of vegetable overgrowth is obstructing the entire fire escape stairs at in the north yard
Jun 9, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective mortar joints and brick walls at chimney at roof
Jun 9, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at public hall, 4th story
Jun 9, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash at north wall in the 1st room from north located at apt 8, 4th story, 1st apartment from west at north
Jun 9, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 8, 4th story, 1st apartment from west at north
Jun 9, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from north located at apt 8, 4th story, 1st apartment from west at north
Jun 9, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing approximately 4 metal treads up from bottom at balcony from 3rd to 4th stories at fire escape at north yard
Jun 9, 2026
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes plant pots at fire escape, 3rd story
May 24, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the bulkhead hinge in the public hall stairs located at public parts, 4th story
Nov 21, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 5, 3rd story, 1st apartment from east at south
Nov 21, 2024 · Apt 5
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south
Nov 9, 2024 · Apt 5
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south
Nov 9, 2024 · Apt 5
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5, 3rd story, 1st apartment from east at south
Nov 9, 2024 · Apt 5
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 9, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing info at public hall, 1st story
Nov 9, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance
Nov 9, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jan 16, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the kitchen located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from east at south wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 2nd room from north located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 1st window frame from north at east wall in the 1st room from north located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st riser from north at east wall in the 2nd room from north located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st riser from north at east wall in the bathroom located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall, 1st door frame from east at south wall in the foyer located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the broken or defective lower sash spring balance at 1st window from west at north wall and 1st window from north at east wall in the 1st room from north located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower sash spring balance at 1st and 2nd window from north at east wall in the 2nd room from north located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste pipe at bathtub in the bathroom located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower sash spring balance at 1st window from north at east wall in the kitchen located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Notice of issuance sent to tenant - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Aug 3, 2022
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out - BHazardous
Properly repair the broken or defective intercom/bell/buzzer from building entrance to apt located at apt 6, 3rd story, 1st apartment from west at north
Aug 3, 2022 · Apt 6
Open — Nov sent out
DOB building violations · 29
- Construction other optional
Requesting engineering report. at exposure 3 at floors 2-4, fire escape is severely deteriorating missing steps, spalling cement at supports to building for landings potential to collapse, expo 1 landing 1 support bracket is disconnected from facade structural stability is in question.
Jun 9, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active
Show 19 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active
ECB violations · 5
- Class - 1
Failure to provide unobstructed exit passageway. at time of inspection observed at exposure 3(back) floors 2-4 fire escape severely deteriorating with missing steps, spalling cement at supports for landings pot
Jun 9, 2026
Resolve - Class - 1
At time of inspection observed exposure 3 at floors 2-4, fire escape is severely deteriorating missing steps, spalling cement at supports to building for landings potential to collapse & overgrown greenery of v
Jun 9, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain building walls or appurtenances. observed cracks & loose decorated stone at exp # 1. parapet coping was also found to be exposed to the elements and in deteriorated conditions at left corner
Apr 27, 2026 · Penalty $25,000
Active - Class - 1
Atoi observed severe cracks and loose stone at exposure 1 of facade, 3rd floor and loose mental at cornice at roof., maintain exterior building wall
Mar 19, 2024 · Penalty $12,500
Active - Class - 2
B265 as per class 2, 28303.7 failure to file a complete boiler inspection report as per dob records.
Dec 28, 2016 · Penalty $500
Active
Complaints
- Safety
Fire escape
Apr 2, 2026 · Apt 6
Close - Safety
Fire escape
Apr 1, 2026 · Apt 6
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt BLDG
Close - Water leak
Slow leak
Oct 13, 2025 · Apt 8
Close - Electric
Power outage
Jul 25, 2025 · Apt 7
Close - Door/window
Window frame
Jul 25, 2025 · Apt 7
Close - Door/window
Window frame
Jul 25, 2025 · Apt 7
Close - Heat/hot water
Entire building
Feb 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2024 · Apt BLDG
Close - Line of travel
Line of travel
Nov 26, 2024 · Apt BLDG
Close
Show 40 more ↓
- Line of travel
Line of travel
Nov 26, 2024 · Apt 5
Close - Heat/hot water
Entire building
Nov 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2024 · Apt APT7
Close - Unsanitary condition
Garbage/recycling storage
Mar 10, 2024 · Apt APT7
Close - Heat/hot water
Apartment only
Jan 21, 2024 · Apt 4FLOOR
Close - Heat/hot water
Entire building
Jan 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 20, 2024 · Apt 4
Close - Heat/hot water
Apartment only
Jan 20, 2024 · Apt 4
Close - Heat/hot water
Entire building
Jan 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 24, 2023 · Apt 7
Close - Heat/hot water
Entire building
Jan 15, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2022 · Apt 7
Close - General
Bell/buzzer/intercom
Jul 30, 2022 · Apt 6
Close - Safety
Smoke detector
Jul 30, 2022 · Apt 6
Close - Unsanitary condition
Pests
Jul 30, 2022 · Apt 6
Close - Door/window
Window frame
Jul 30, 2022 · Apt 6
Close - Heat/hot water
Entire building
Oct 9, 2019 · Apt 5
Close - Unsanitary condition
Pests
Jul 9, 2019 · Apt 2
Close - Paint/plaster
Ceiling
Jul 9, 2019 · Apt 2
Close - Plumbing
Basin/sink
Jul 9, 2019 · Apt 2
Close - Water leak
Heavy flow
Jun 21, 2019 · Apt 4
Close - Plumbing
Basin/sink
Jun 7, 2019 · Apt 2
Close - Electric
Bell-buzzer/intercom
Apr 21, 2012 · Apt 7
Close - General
Doors
Apr 21, 2012 · Apt 7
Close - Heating
Heat related
Dec 14, 2010 · Apt BLDG
Close - Paint/plaster
Ceiling
Dec 8, 2010 · Apt 7
Close - Heating
Heat related
Dec 8, 2010 · Apt 7
Close - Heating
Heat related
Dec 7, 2010 · Apt 8
Close - Plumbing
Bathtub/shower
Jul 17, 2010 · Apt 5
Close - Plumbing
Basin/sink
Jul 17, 2010 · Apt 5
Close - Plumbing
Water supply
Jul 17, 2010 · Apt 5
Close - Plumbing
Water supply
Jul 14, 2010 · Apt 5
Close - Plumbing
Bathtub/shower
Jul 14, 2010 · Apt 5
Close - Heating
Heat related
Dec 8, 2009 · Apt 3
Close - Heating
Heat related
Oct 20, 2009 · Apt 5
Close - Plumbing
Toilet
Sep 2, 2009 · Apt 8
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1929
- Floors
- 4
- Residential units
- 8
- Building area
- 6,880 ft²
- Lot area
- 2,240 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 35
- Block / lot
- 1378 / 77
- Assessed value
- $516,600
- Landmark / historic district
- No
HPD registration #353862, last renewed Sep 13, 2025.
Questions about 1371 St Johns Place
Who owns 1371 St Johns Place?
The owner of record in NYC Department of City Planning PLUTO data is Hamilton, Trevor P..
Does 1371 St Johns Place have violations?
Yes. NYC HPD has recorded 174 housing violations at this property.
Is 1371 St Johns Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1371 St Johns Place built?
City records list 1929 as the year it was built.
How many apartments are in 1371 St Johns Place?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.