roofy

1489 Sterling Place

Brooklyn, NY 11213BBL 3-01373-7501Map

Owner of record: Bh Sterling Realty Group LLC

1489 Sterling Place is a condominium built in 1901 in Brooklyn, 11213. It has 8 residential units across 2 floors. The owner of record is Bh Sterling Realty Group LLC. HPD has recorded 79 housing violations here, most recently on June 11, 2025.

HPD violations
79
DOB violations
0
ECB violations
7
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 11, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 79

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 11, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 11, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 19, 2023

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 19, 2023

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Sep 19, 2023

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Sep 19, 2023

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 19, 2023

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Sep 19, 2023

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 17, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 21, 2021

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Oct 13, 2019 · Apt 2

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Oct 13, 2019 · Apt 2

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of hotwater exceeding the allowable maximum temperature of 130 degrees at sink in the kitchen located at apt 2fl, 2nd story

    Oct 10, 2019 · Apt 2FL

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2fl, 2nd story

    Oct 10, 2019 · Apt 2FL

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Oct 3, 2019 · Apt 2

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Oct 3, 2019 · Apt 2

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 30, 2018

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor at public hall, 2nd story

    Apr 11, 2018

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the house hold items front yard

    Apr 11, 2018

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2ndfl, 2nd story

    Apr 11, 2018 · Apt 2NDFL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2ndfl, 2nd story

    Apr 11, 2018 · Apt 2NDFL

    Closed — Violation closed
  • B

    Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 2ndfl, 2nd story

    Apr 11, 2018 · Apt 2NDFL

    Closed — Violation closed
  • B

    Provide adequate supply of cold water for the fixtures at bathtub in the bathroom located at apt 2ndfl, 2nd story

    Apr 11, 2018 · Apt 2NDFL

    Closed — Violation closed
  • B

    Provide adequate supply of cold water for the fixtures at wash basin in the bathroom located at apt 2ndfl, 2nd story

    Apr 11, 2018 · Apt 2NDFL

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective ceramic tiles on the floor in the kitchen located at apt 2fl, 2nd story

    Mar 9, 2018 · Apt 2FL

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 4th room from north located at apt 2fl, 2nd story

    Mar 9, 2018 · Apt 2FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl tiles on the floor in the private hallway located at apt 2fl, 2nd story

    Mar 9, 2018 · Apt 2FL

    Closed — Violation closed
  • B

    Provide adequate supply of cold water for the fixtures at wash basin in the bathroom located at apt 2fl, 2nd story

    Mar 9, 2018 · Apt 2FL

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 2fl, 2nd story

    Mar 9, 2018 · Apt 2FL

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2fl, 2nd story

    Mar 9, 2018 · Apt 2FL

    Closed — Violation closed
  • B

    Repair the broken or defective connection waste line at sink in the kitchen located at apt 2, 2nd story

    Feb 22, 2018 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective connection at waste line at washbasin in the bathroom located at apt 2, 2nd story

    Feb 22, 2018 · Apt 2

    Closed — Violation closed
  • A

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 2nd story

    Feb 22, 2018 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 2, 2nd story

    Feb 22, 2018 · Apt 2

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in wasteline at sink in the kitchen located at apt 2, 2nd story

    Feb 22, 2018 · Apt 2

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective ceramic tiles at south and east walls in the bathroom located at apt 2, 2nd story

    Feb 22, 2018 · Apt 2

    Closed — Violation closed
  • B

    Replace with new the broken or defective ( water-damage ) counter top at base-cabinets at sink in the kitchen located at apt 2, 2nd story

    Feb 22, 2018 · Apt 2

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective wood floor inside base-cabinets at sink in the kitchen located at apt 2, 2nd story

    Feb 22, 2018 · Apt 2

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story

    Feb 22, 2018 · Apt 2

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tile at west wall in the kitchen located at apt 2, 2nd story, apartment at north

    Jan 29, 2018 · Apt 2

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, apartment at north

    Jan 29, 2018 · Apt 2

    Closed — Violation closed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at ceiling and walls all electrical receptacles in the entire apartment located at apt 2, 2nd story, apartment at north

    Jan 29, 2018 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing located at apt 2, 2nd story

    Jan 29, 2018 · Apt 2

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2, 2nd story

    Jan 29, 2018 · Apt 2

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt 2, 2nd story, apartment at north

    Jan 29, 2018 · Apt 2

    Closed — Violation closed
  • B

    Repair the leaky and/or defective water supply pipe under wash basin sink in the bathroom located at apt 2, 2nd story, apartment at north

    Jan 29, 2018 · Apt 2

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story

    Jan 29, 2018 · Apt 2

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story

    Jan 29, 2018 · Apt 2

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story, apartment at north

    Jan 27, 2018 · Apt 2FL

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 2fl, 2nd story, apartment at north

    Jan 27, 2018 · Apt 2FL

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 7

  • Class - 1

    Work afterhrs w/o variance permit contrary to 28-105.12.5 note:ato my insp proposed 4styb observed 6workers performing const work.after reviewed dept records revealed that there were no afterhrs variance permit

    Dec 4, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Bc3309.10 inadequate protection of adjacent bldg roof.ato my insp proposed 4styb const in progress observed that roof protection@exp2,4 not comply to code (not extended to 20' missing wood plank,not protected c

    Dec 4, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Const super failed to perform duties per code following hazardous condition were observed&swo issued to this const site:1)work afterhrs w/o variance permit 2)inadequate roof protection for adj property@exp2,4 3

    Dec 4, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain/institute safety equipment measures or temp (illegible).no handrail note:ato my insp proposed 4styb work in progress observed that worker use staircase w/o handrails which create fall hazard

    Dec 4, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain/display onsite docs required by bcch33.note:ato myinsp proposed 4styb work in progress i observed 6workers performing const work upon request from competent person luis pantaleon daily logbo

    Dec 4, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide sws where required note:ato my insp of 4styb@4fl level aprx50' in ht&19' setback from fence@exp1 i observed that there were no sws in place as required to safeguard public from const op creat

    Dec 4, 2021 · Penalty $10,000

    Resolve
  • Class - 1

    Bc3301.2 safety measures&standards no overhead protection note:ato my insp of 4styalt const work in progress i observed that there were no overhead protection in place to safeguard resident accessing area from

    Dec 4, 2021 · Penalty $2,500

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (R1)
Year built
1901
Floors
2
Residential units
8
Building area
5,083 ft²
Lot area
2,555 ft²
Zoning
R6
Community board
308
Council district
36
Block / lot
1373 / 7501
Assessed value
$644,402
Landmark / historic district
No

HPD registration #390768, last renewed Jun 26, 2025.

Questions about 1489 Sterling Place

Who owns 1489 Sterling Place?

The owner of record in NYC Department of City Planning PLUTO data is Bh Sterling Realty Group LLC.

Does 1489 Sterling Place have violations?

Yes. NYC HPD has recorded 79 housing violations at this property.

Is 1489 Sterling Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1489 Sterling Place built?

City records list 1901 as the year it was built.

How many apartments are in 1489 Sterling Place?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.