1294 Park Place

Brooklyn, NY 11213BBL 3-01371-0030Map

Owner of record: 1294 Park Pl LLC

1294 Park Place is a walk-up apartment building built in 1901 in Brooklyn, 11213. It has 8 residential units across 4 floors. The owner of record is 1294 Park Pl LLC. HPD has recorded 11 housing violations here, most recently on February 16, 2022.

HPD violations
11
DOB violations
14
ECB violations
19
HPD complaints
9

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Feb 16, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 11

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 16, 2022

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective leading to roof, upper level of duplex apartment, in the private hallway located at apt 4b, 4th story, 1st apartment from south at west

    Feb 14, 2022 · Apt 4B

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Feb 14, 2022

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at at public hall, 1st story

    Feb 14, 2022

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4b, 4th story, 1st apartment from south at west

    Feb 14, 2022 · Apt 4B

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 4b, 4th story, 1st apartment from south at west

    Feb 14, 2022 · Apt 4B

    Closed — Violation dismissed
  • B

    Properly secure the loose door handle in the entrance located at apt 4b, 4th story, 1st apartment from south at west

    Feb 14, 2022 · Apt 4B

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Feb 14, 2022

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Feb 14, 2022

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Feb 14, 2022

    Closed — Violation dismissed
Show 1 more ↓
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Feb 14, 2022

    Closed — Violation dismissed

DOB building violations · 14

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 18, 2018

    Vp*-violation unserved ecb- dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 19, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 9, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 7, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 7, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 10, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 10, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 10, 2018

    Dob violation - dismissed
Show 4 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 10, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 10, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 10, 2018

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 17, 2017

    Dob violation - dismissed

ECB violations · 19

  • Class - 1

    Failure to maintain adequate housekeeping per section requirements noted: at time of inspection w/construction operation in progress at a 4th sty bldg i observed inadequate housekeeping consisting of c joists

    Dec 18, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Permit holder failed to produce for inspection the daily lig-osha. noted: at time of inspection of an active jobsite of an alt 4 sty bldg currently on the 3rd fl deck level,i observed upon request for the daily

    Dec 18, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Jobsite fence not constructed or maintained pursuant to subsection. attime of inspection at an active construction site,i observed construction fence at exp#4 was broken & was missing panels. the fence is inade

    Dec 18, 2018 · Penalty $400

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications. at the time of my inspection it was observed that the sidewalk shed lighting under sidewalk shed was not illuminated at all times as required by code. de

    Sep 27, 2018

    Resolve
  • Class - 1

    Sec. 3306.5.1 the respondent failed to meet the minimum requirements ac 28-101.2 set 4th in bc 3306.5.1;bc 3306.5.1 mandates demolition drawings to have plans,sections,details,clearly showing sequence,extent &

    Dec 15, 2017 · Penalty $4,000

    Resolve
  • Class - 1

    Bc1704.20.6/the respondent,permit holder,failed to meet the requirements of bc1704.20.6;bc1704.20.6 mandates"prior to commencement of work,the special inspector shall review the contractors proposed sequence of

    Dec 15, 2017 · Penalty $4,000

    Resolve
  • Class - 1

    Work w/o permit.at the time of inspection responding to an incident observed no construction activity.contractor was working w/cmu blocks walls or exp#2 and 4,and no permit,no plans for this work when wall coll

    Oct 17, 2017

    Resolve
  • Class - 1

    Construction super failed to perform duties as per rule.at time of inspection responding to an incident observed no construcion activity w/interior&exterior work in progress.i asked competent person"vladimir uc

    Oct 17, 2017 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to immediately notify the dept of an incident at construction/demolition site.at time of inspection responding to an incident reported by fdny by call dob and notify when a collapse floor and injured 6

    Oct 17, 2017 · Penalty $2,500

    Resolve
  • Class - 2

    Bc3307.7:failure to provide an adequate construction fence.inadequate note:fence drawing shows bracing to 4x4 wood post at 8'-0'.and stake into ground.drawing 1-302.00 section(3)at time of inspetion responding

    Oct 17, 2017

    Resolve
Show 9 more ↓
  • Class - 1

    Failure to notify the dept prior to commencement of earthwork.at the time of inspection responding to a incident observed no construction activitgy w/interior &exterior work in progess.ext on the rear of bldg,e

    Oct 17, 2017

    Resolve
  • Class - 2

    Bc3307.3.2/failure to provide lot line construction fence at the time of inspection "incident" observed an active construction inspection noted at the rear of building at expo#4 missing fence.rem:comply with no

    Oct 17, 2017 · Penalty $2,000

    Resolve
  • Class - 1

    Work does not conform to approved construction docs and/or approved amendments.at time of inspection responding to an incident observed no construction activity,contractor was working for underpinning at exp#4

    Oct 17, 2017 · Penalty $500

    Resolve
  • Class - 1

    Bc3309.9:failure to waterproof adj wall or bldg during construction or demolition operation.at time of inspection responding to an incident observed no construction activity,contractor was doing underpinning wo

    Oct 17, 2017 · Penalty $800

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and or approvd amendments.at the time of inspection responding to an incident observed no construction activity,contractor was working with cmu walls at

    Oct 17, 2017 · Penalty $250

    Resolve
  • Class - 1

    Bc 3301.2:no guard rails.at time of inspection responding to an incident observed no construction activity w/interior &exterior work in progress.during inspection noted that there was no guardrails at the rear

    Oct 17, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to designate and/or have construction super present at site when reqd.at time of inspection responding to an incident observed no construction activity w/interior & exterior work in progress.i asked mr

    Oct 17, 2017 · Penalty $10,000

    Resolve
  • Class - 2

    No overhead protection.at time of nspection responding to an incident observed no construction activity w/interior & exterior"cmu block walls"in progress.during inspection noted the contractor failure to instal

    Oct 17, 2017 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3314.8:failure to provide reqd guardrails and toe boards for scaffold platform.at the time of inspection responding to an incident observed no construction activity,contractor was working w/cmu walls in progr

    Oct 17, 2017 · Penalty $800

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Jul 7, 2026 · Apt 3F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 7, 2026 · Apt 3F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 26, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 22, 2025 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Oct 23, 2024 · Apt 1B

    Close
  • Water leak

    Damp spot

    Oct 23, 2024 · Apt 1B

    Close
  • Water leak

    Damp spot

    Oct 15, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Jun 19, 2023 · Apt 2B

    Close
  • Safety

    Window guard broken/missing

    Feb 9, 2022 · Apt 4B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1901
Floors
4
Residential units
8
Building area
4,601 ft²
Lot area
3,125 ft²
Zoning
R6
Community board
308
Council district
36
Block / lot
1371 / 30
Assessed value
$380,700
Landmark / historic district
No

HPD registration #822950, last renewed Jul 8, 2025.

Questions about 1294 Park Place

Who owns 1294 Park Place?

The owner of record in NYC Department of City Planning PLUTO data is 1294 Park Pl LLC.

Does 1294 Park Place have violations?

Yes. NYC HPD has recorded 11 housing violations at this property.

Is 1294 Park Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1294 Park Place built?

City records list 1901 as the year it was built.

How many apartments are in 1294 Park Place?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.