1582 Prospect Place
Brooklyn, NY 11233BBL 3-01369-0019Map
Owner of record: Sy Prospect LLC
1582 Prospect Place is a walk-up apartment building built in 1910 in Brooklyn, 11233. It has 8 residential units across 4.5 floors. The owner of record is Sy Prospect LLC. HPD has recorded 81 housing violations here, most recently on April 15, 2026. 8 of the 50 most recent violations are still open.
- HPD violations
- 81
- DOB violations
- 2
- ECB violations
- 7
- HPD complaints
- 41
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 81
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the 1st room from north located at apt 1b lower level, 1st story, 1st apartment from east at south
Apr 15, 2026 · Apt 1B
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Jun 12, 2024 · Apt 2F
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Jun 12, 2024 · Apt 2F
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 3, 2023 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Dec 3, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 4r, 5th story, 1st apartment from east at south
Apr 20, 2021 · Apt 4R
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4r, 4th story, 1st apartment from east at south
Apr 9, 2021 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors from lower level to public hall at cellar located at apt 1f, 1st story, apartment at north
Dec 22, 2020 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors from lower level to public hall at cellar located at apt 1f, 1st story, apartment at east
Aug 11, 2020 · Apt 1F
Open — Violation will be reinspected - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1f upper level, 1st story, apartment at east
Aug 11, 2020 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1f upper level, 1st story, apartment at east
Aug 11, 2020 · Apt 1F
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 15, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 15, 2020
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jul 15, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 15, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jul 15, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 15, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 15, 2020
Closed — Violation closed - BHazardous
Discontinue use of rooms for living purposes remove bed from cellar of duplex in the 1st room from east located at apt 1f
Jul 15, 2020 · Apt 1F
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from north at east
Jul 15, 2020 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from north at east
Jul 15, 2020 · Apt 1F
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Apr 2, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 2, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 2, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Apr 2, 2020
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 2, 2020
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Apr 2, 2020
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 2, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Mar 27, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. , 1st story
Mar 27, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Mar 27, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing , 1st story
Mar 27, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Mar 27, 2020
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing , 1st story
Mar 27, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 31, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 31, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Oct 31, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Oct 31, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 31, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at at public hall, 1st story
Oct 31, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 19, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 13, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 24, 2015
Closed — Violation dismissed
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 25, 2020
Dob violation - active - Construction other optional
Stop all work immediately make site safe, contact borough comm. office at 718 802-3677 for info
May 23, 2017
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to comply with commissioner's order contained in summons/violation #35414023k issued 8/31/20 and file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work w/o permit.note:no records
Dec 13, 2021 · Penalty $12,500
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in summons/violation #35414023k issued on 8/31/20 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.work w/out a permit at cellar l
Oct 14, 2021 · Penalty $6,250
Resolve - Class - 1
Work w/o a permit. failure to comply w/the comm's order contained in summons/vio#35414023k issued on 08/31/20 & to file a cert of correctionpursuant to 28-201.1 & 1rcny 102-01. previous ecb#35533611z.
Aug 25, 2021 · Penalty $12,500
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in summons/violation #35414023k issued on 08/31/20 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.remedy:comply w/commissioner's
Jun 28, 2021 · Penalty $12,500
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35414023k issued on 8/31/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a perm
Apr 6, 2021 · Penalty $6,250
Resolve - Class - 2
Occupancy contrary to that allowed by certificate of occupancy#321232064f indicate cellar as ordinary use,boiler,utility,meter room and partial cellar accessory to dwelling unit on the 1st fl. at time of inspec
Aug 31, 2020
Resolve - Class - 1
Work without permit: noted: at cellar level water and waste line installed for washing machine & unpermitted gas line for gas dryer. remedy:obtain permit
Aug 31, 2020 · Penalty $2,500
Active
Complaints
- Door/window
Window pane
Dec 15, 2025 · Apt 1B1R
Close - Unsanitary condition
Sewage
Nov 3, 2025 · Apt 1B1R
Close - General
Cooking gas
Aug 16, 2025 · Apt 3F
Close - Water leak
Slow leak
May 31, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 30, 2023 · Apt 2F
Close - Unsanitary condition
Sewage
Oct 4, 2023 · Apt 1R
Close - Plumbing
Steam pipe/riser
Sep 13, 2022 · Apt 1B1R
Close - Appliance
Electric/gas range
Apr 13, 2021 · Apt 4R
Close - Appliance
Electric/gas range
Apr 7, 2021 · Apt 4R
Close - Water leak
Slow leak
Dec 6, 2020 · Apt 1F
Close
Show 31 more ↓
- Water leak
Heavy flow
Aug 5, 2020 · Apt 1F
Close - Water leak
Heavy flow
Jul 12, 2020 · Apt 1F
Close - Water leak
Heavy flow
Jun 29, 2020 · Apt APT1F
Close - Water leak
Heavy flow
Jun 29, 2020 · Apt 1F
Close - Water leak
Damp spot
Jun 29, 2020 · Apt 1F
Close - Heat/hot water
Apartment only
Apr 20, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
Apr 19, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
Apr 2, 2020 · Apt 2R
Close - Water leak
Slow leak
Mar 26, 2020 · Apt 2R
Close - Door/window
Window frame
Mar 26, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
Mar 26, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
Nov 18, 2019 · Apt 1F
Close - General
Bell/buzzer/intercom
Oct 15, 2019 · Apt 1F
Close - Water leak
Heavy flow
Aug 22, 2019 · Apt 1F
Close - Plumbing
Water supply
Dec 21, 2015 · Apt 2
Close - Paint/plaster
Ceiling
Dec 21, 2015 · Apt 2
Close - Paint/plaster
Wall
Dec 21, 2015 · Apt 2
Close - Paint/plaster
Ceiling
Dec 4, 2015 · Apt 2
Close - Paint/plaster
Ceiling
Dec 4, 2015 · Apt 2
Close - General
Windows
Nov 6, 2011 · Apt 2R
Close - Heating
Heat related
Nov 6, 2011 · Apt 2R
Close - Plumbing
Water supply
Sep 4, 2011 · Apt 2R
Close - Paint/plaster
Ceiling
Dec 3, 2008 · Apt 1
Close - Electric
Wiring
Dec 3, 2008 · Apt 1
Close - Electric
Lighting
Dec 3, 2008 · Apt 1
Close - Plumbing
Water-leaks
Sep 9, 2008 · Apt 1
Close - Electric
Lighting
Sep 9, 2008 · Apt 1
Close - Electric
Lighting
Sep 9, 2008 · Apt 1
Close - Plumbing
Water-leaks
Sep 9, 2008 · Apt 1
Close - Plumbing
Water-leaks
Sep 9, 2008 · Apt 1
Close - Heating
Heat related
Jan 1, 2008 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 4.5
- Residential units
- 8
- Building area
- 6,595 ft²
- Lot area
- 3,194 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 41
- Block / lot
- 1369 / 19
- Assessed value
- $411,750
- Landmark / historic district
- No
HPD registration #323182, last renewed Dec 30, 2025.
Questions about 1582 Prospect Place
Who owns 1582 Prospect Place?
The owner of record in NYC Department of City Planning PLUTO data is Sy Prospect LLC.
Does 1582 Prospect Place have violations?
Yes. NYC HPD has recorded 81 housing violations at this property.
Is 1582 Prospect Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1582 Prospect Place built?
City records list 1910 as the year it was built.
How many apartments are in 1582 Prospect Place?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.